Technical Support 2008 1 6/19/08 PHENIX WEEKLY PLANNING 6/19/2008 Don Lynch.

Slides:



Advertisements
Similar presentations
Technical Support /7/08 PHENIX WEEKLY PLANNING 8/7/2008 Don Lynch.
Advertisements

PHENIX WEEKLY PLANNING 9/13/2007 Don Lynch. 9/13/2007 Weekly Planning Meeting 2007 PHENIX Shutdown April-June 2007: Complete run, De-mount HBD West, Begin.
Technical Support /23/08 PHENIX WEEKLY PLANNING 10/23/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/17/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
Technical Support /5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
Technical Support /12/08 PHENIX WEEKLY PLANNING 6/12/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
1 4/2/2009 PHENIX WEEKLY PLANNING 4/2/2009 Don Lynch.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /17/08 PHENIX WEEKLY PLANNING 7/17/2008 Don Lynch.
Technical Support /24/08 PHENIX WEEKLY PLANNING 4/24/2008 Don Lynch.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
Technical Support /21/08 PHENIX WEEKLY PLANNING 8/21/2008 Don Lynch.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Technical Support /14/08 PHENIX WEEKLY PLANNING 8/14/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
Technical Support /8/08 PHENIX WEEKLY PLANNING 5/8/2008 Don Lynch.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
Technical Support /28/08 PHENIX WEEKLY PLANNING 8/28/2008 Don Lynch.
Technical Support /26/08 PHENIX WEEKLY PLANNING 6/26/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
Technical Support /18/08 PHENIX WEEKLY PLANNING 12/30/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
1 7/16/2009 PHENIX WEEKLY PLANNING 7/16/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
Technical Support /22/08 PHENIX WEEKLY PLANNING 5/22/2008 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 11/8/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish Elec. Cooling Water upgrade(CA) (under.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Presentation transcript:

Technical Support /19/08 PHENIX WEEKLY PLANNING 6/19/2008 Don Lynch

Technical Support /19/08 Shutdown ’08 Schedule Design & Safety Review Action Items: Mu Trigger Platform review (Pearson) RPC Prototype InstallationIn progress New BeampipeWaiting for Funding CM CraneWaiting for Vendor response Sta. 1 and MMN ScaffoldingInspect after Complete (Pearson) RPC Factory: Prototype C tests in progress Prototype D Testsgaps & module frames received Dark Current test standin design Rollaround foil dispenserdone AC installation done Mu Trigger FEE upgrade: Station 2/3 scaffoldingcomplete, needs inspection Station 1 scaffoldingin progress finish by 6/27 Rack components (N&S)on order Rack assemblyin progress finish by 7/11 LV cable prepin progress finish by 7/15 N&S platforms Fabricate & installfabrication in progress, install by 7/15 (Pearson)

Technical Support /19/08 Shutdown ’08 Schedule Mu Trigger FEE Upgrade (cont’d): Prep work for platforms (water/elec)in progress finish by 7/15 FEE installation N&S sta’s. 1,2 & 3Aug-Sep FEE water and dry air installationAug-Sep Optical cable prepJuly LV cable installationJuly-Aug optical cable installationJuly- Aug Rack (N&S) installationJuly 15+ Install FEE’s in MMS for RPC testSep. Install FEE South platformSep. Install S rack cooling & electricOct. Rack room electronics, etc.Sep.– Oct. Final rack utilities Sep.-Oct Testing Sep.-Nov. RPC engineering & safety reviewJuly 10&11 RPC proptotype installation: Prep workcomplete by July 31 move (7) MuID pipes move gap 5 south cable tray Rack prepComplete by Aug 29 RPC prototype gas systemJuly - Aug

Technical Support /19/08 Shutdown ’08 Schedule, cont’d RPC proptotype installation (cont’d): Move shielding for installationJuly - Sep RPC prototype cable routing & supportJuly - Aug Modify crystal palace & vapor barrierJuly - Aug RPC prototype install Sep. – Oct. (RPC2 – PHENIX) (RPC3 – C. Pearson) Sep. - Oct. Install rack in tunnel southSep. Replace tunnel shieldingNov. (C. Pearson) Connect electronics/gas Sep. – Nov. MuTr Decapacitations (Sta. 1 N and MMN)July - Sep Fan Tray maintenancein progress (on going fill-in) HBD InstallSep.-Oct. PC1 west work (needs planning)Sep. – Nov. CM Crane InstallOct. DC East?/West RepairsOct. – Nov.

Technical Support /19/08 Shutdown ’08 Schedule, cont’d Remove all inst’n equipment(e.g. scaffolds)Oct. - Nov Gap 5 north piping and cable tray re-loc.Oct. – Dec. Gap 2 north cable tray & crate re-mountsOct. – Dec Prep for shutdown 2009Nov. - Dec Prep for run 9Dec Close shield wall start shifts Dec. Start physicsJan 1

Technical Support /19/08 MMN Scaffolding is complete

Technical Support /19/08 MuTrigger FEE LV Cable Prep in progress

Technical Support /19/08 MuTrigger FEE Rack prep in progress

Technical Support /19/08 RPC Prototype Rec’d dim’s and lifting points from Larry B. Need to decide on prototype orientation and alignment for Sta 1 & 2 based on absorber location.

Technical Support /19/08 RPC Prototype “D” Gaps ready for testing

Technical Support /19/08 RPC Factory Support AC work: Done

Technical Support /19/08 RPC Factory Support, cont. Dark Current Test Stand Specs: Chamber gas flow (?) HV supply 10,000 V Hold time 72 hrs 10 shelves each to hold a 76” x 50” (approx. max.) Gap module. Trip points <20  A Current <1  A Shelf surface: flat and non-conductive

Technical Support /19/08 RPC Factory Support, cont. Foil dispenser: done

Technical Support /19/08 1) Run Power to new MuTrgr FEE racks on MMN and MMS 2) Install power and signal cable tray (ceiling suspended) for new DCM rack row – north of existing DCM racks. 3) Install power feeds to RPC north & south tunnel racks from IR power panels. NOTE: MuTr north power panel has no available breakers to feed north tunnel racks (south panel has spare breakers for use). More engineering analysis is required to determine if the north power panel should be increased in size or for installation of a sub panel branch can be accomplished. 4) Assist in signal cable installation for MuTr/RPC upgrades as necessary. 5) Upgrade power capacity of Central Magnet power distribution for future bridge rack loads. a) Remove existing 15KVA transformer and install 45KVA unit. b) Install new (larger size) power cable from rack room to Central Magnet distribution breaker panels. 6) Install 120 volt AC power drops into new control room annunciator alarm rack (rack room). Shutdown ’08 Electrician Work

Technical Support /19/08 CM Crane, Station 1 scaffolding CM Crane procurement postponed Until FY09 Sta 1 scaffolding construction started.

Technical Support /19/08 Detector upgrade Rack allotments New Platform HBD/RXNP (not shown) MuTrgrFEE N MuTrgrFEE S VTX Power FVTX NCC N NCC S RPC1 S RPC1 N New Platform RPC1 NS VTX FEM

Technical Support /19/08 MuTrigger FEE Rack Utilities Need to install Tee’s on supply and return lines: both s/b ¾ to supply Mu Trigger North rack and future rack

Technical Support /19/08 RPC Absorber Concept

Technical Support /19/08 To match absorber and prototype RPC’s, we need to install new FEE upgrades in these 5 MuTR FEE’s We will develop a plan to access these for installation and testing from a custom work platform (to be designed). MuTrigger FEE upgrades in MMS in support of RPC prototypes

Technical Support /19/08 CM Access

Technical Support /19/08 Work Permit Requirements CM Crane Installation RPC Prototype Installation HBD re-installation PC1 Repairs These WP’s not needed until Sept. (More will be needed – to be added to the list as appropriate)

Technical Support /19/08 New Beampipe Design & Review SS/Be central beampipe 1-5/8” to 3” transitions Drawings Done, C-A getting Quotes for NEG coating No supplemental money this FY… project is on hold until FY09

Technical Support /19/08 Safety, Security, etc. Summertime PPE: Long pants short sleeve shirts proper shoes. No shorts, anywhere. (Note: lab committee is considering office exceptions.) Additional PPE as appropriate to the task. Site Emergency Plan: 1008 complex (and all of RHIC ring) is in zone 2 Our LEC is CAS Watch x2022, P. Giannotti is backup LEC (x3815) In case of emergency, dial 911 or 2222 from lab phones; from cell phones dial

Technical Support /19/08 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: Summer officially begins tomorrow at 7:59 PM (EDT) Summer solstice (Solstice from sol + stice meaning “sun” + “to stand still”)