P. Mokashi IES Team Meeting, SwRI 29 May 2013. IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.

Slides:



Advertisements
Similar presentations
Status update of ASM on Swarm Charlie Swarm 4th DATA QUALITY WORKSHOP 2 December 2014 GFZ Potsdam Jean-Michel Léger.
Advertisements

Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations The planning concept - current status Detlef Koschny Space Science Department ESA/ESTEC.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
PHEOS PSRR Concept of Operations. 2 Scope The purpose of the PCW-UVI Concept of Operations (ConOps) is to communicate how mission systems will operate,
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 3/16/2012OVSA Preliminary Design Review.
DS-1/Plasma Experiment for Planetary Exploration (PEPE) PEPE – is a particle spectrometer capable of resolving energy, angle and mass & charge composition.
CXC EPHIN Status and Alternatives Michael Juda. CXC EPHIN StatusPage 2 Outline 1.EPHIN description 2.Thermal issues 3.+27V rail anomaly and impacts 4.Operations.
Simulating A Satellite CSGC Mission Operations Team Cameron HatcherJames Burkert Brandon BobianAleks Jarosz.
SWT 27/11/ Consert W.Kofman, A. Herique, JP. Goutail, A. Roux.
1 08 January 2015 Stephen Horan Cube Quest Kick-off: Communications Rules PI for Avionics Space Technology Mission Directorate.
Dataloggers. Records voltage, current, or circuit closing Environmental variables must be converted to electronic signal.
Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
ISUAL Long Functional Test H. Heetderks. TRR December, 20012NCKU UCB Tohoku ISUAL Long Functional Test Heetderks Basic DPU Function Verify Power on Reset.
Design of a Science Operations Centre for the ExoMars 2016 Trace Gas Orbiter Mission A. Cardesin Moinelo, D. Frew, L. Metcalfe, P. Martin, N. Manaud, A.
G O D D A R D S P A C E F L I G H T C E N T E R Goddard Lidar Observatory for Winds (GLOW) Wind Profiling from the Howard University Beltsville Research.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
SOPS: The Science Operations Planning System for the first ESA Lunar Mission SMART-1.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
“Joint planning” session Preliminary instrument operation & science plans of SOT/XRT/EIS for several months after the launch. Instrument checkout and Performance.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
Overview of the NOAA UAS Requirements and Capabilities Database Matt Lucas NOAA UAS Program TriVector Services, Inc.
IES Flight Software J. Hanley / P. Mokashi May 29, 2013.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Heliospheric Imager – Scientific Operations  HI Operations Document – R. Harrison (presented by Dave Neudegg – SciOps for Cluster, Mars Express, Double.
Bone Trajectories and Model Simulations Kathleen Mandt, Ray Goldstein, Christoph Koenders May 29, 2013 IES Team Meeting – San Antonio.
DSL Distributed Systems Laboratory ATC 23 August Model Mission: Magnetospheric Multiscale (MMS) Mission Goal “To study the microphysics of three.
FTS Test Definition Summary Kaley Walker Test Readiness Review January 29, 2003.
03/11/021 Spaceport Vision Team Members. 03/11/022 Systems Definition Spaceport System Spaceport Stakeholder Needs High-Level Trade Study Performance.
PACS IBDR 27/28 Feb 2002 PACS Data Flow1 PACS Data Flow, Instrument Modes and Operations Helmut Feuchtgruber MPE.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
Planetary Missions Division Dvk, 16 Jul 2002 Interfaces - presented at the SWT #10 To clarify the situation with interfaces, formats, etc. Summary: There.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
SS Space Science MO&DA Programs - August Page 1 ACE Instrument Status Report Cosmic Ray Isotope Spectrometer (CRIS) Normal Operation. Electron Proton.
STEREO - Solar Terrestrial Relations Observatory Mission SECCHI Calibration Activities Simon Plunkett SECCHI Operations Scientist Naval Research Laboratory.
Improving Detection Efficiency of a Space-based Ion Mass Spectrum Analyzer Anne Lamontagne, University of New Hampshire; Mark Popecki, UNH; Lynn Kistler,
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration and Test 2011 March 29 Dave Mitchell.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Dec 1, FIELDS Top Level Requirements Review S. Harris (UCB)
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations Experimenter to RSOC interfaces Detlef Koschny Space Science Department ESA/ESTEC
1/106 December 2001Rosetta SOWG Status of the Rosetta Project TestBed (PTB) P. van der Plas Modelling and Simulation Section ESA/ESTEC ESA/Estec 6 December.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
Requirements to WSO Ground Segment Lavochkin Association & ROSCOSMOS 30/06/2006.
1 The IBEX-HI SensorVoyagers in the Heliosheath Conference, January 12, 2009 January 12, 2009 Voyagers in the Heliosheath Kauai, Hawaii. The IBEX Hi Sensor:
ESA UNCLASSIFIED – For Official Use HSO-OP - Solar and Planetary Missions Division Solar Orbiter Instrument Operations, Data Handling and FDIR Ignacio.
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
ESA UNCLASSIFIED – For Official Use Background for Downlink Plug-in MAPPS User-Group Meeting.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
RSOC Overview at SWT #26, 11/12 June 2009
Operational Flight Software
PAD SELECTION QUALITY FLAG STATUS
Pre-landing Orbiter Observations
Fault Protection Techniques in JPL Spacecraft
Svom Ground-segment Meeting CNES
Mars Swingby (MSB) information
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
GLAST Large Area Telescope:
Single Object & Time Series Spectroscopy with JWST NIRCam
Operational Description
MODIS Instrument Operations Team (IOT): Bryan Breen & Tony Salerno
THEMIS Electric Field Instrument
Metis On-Board SW overview
Launch and On-orbit Checkout
LAT Operations Scenario Subsystem Meetings
Technical Training.
Presentation transcript:

P. Mokashi IES Team Meeting, SwRI 29 May 2013

IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test on simulatorEnter on RPC wiki PIU (Imperial College, London) Coordinate between RPC instruments Integrate RPC science sequences Convert wiki sequences into RSOC / RMOC formats RSOC (ESAC, Spain) Coordinate non- interactive science activities RMOC (ESOC, Germany) Interactive and maintenance activities EQM testing Science activity uplink 2

IES (SwRI) Develop sequences Develop tables, macros and patches if necessary Test on simulator Enter observation definitions and conditions into the SGS system Modify RSGS generated command sequences PIU (Imperial College, London) Coordinate between RPC instruments RSGS (ESAC, Spain) Develop the Rosetta science planning system Generate activity timelines Generate command sequences RMOC (ESOC, Germany) Interactive and maintenance activities Science activity uplink EQM testing Coordinate pre- landing activities 3

4 Operations Planning FocusLead in time Execution Duration Skeleton Plan Trajectory & Pointing In developmentEntire Mission Long Term Planning Trajectory5 – 3 months4 months Medium Term Planning Pointing, Resources 2 months – 2 weeks 1 months Short Term Planning Commanding2 – 1 weeks1 week

 Two main subsystems ◦ Observation Management Subsystem (OBM)  Used to define instrument campaigns, observations and their associated planning, trajectory, attitude and resource characteristics and constraints ◦ Science Planning and Scheduling Subsystem (SPS)  Automated scheduling and timeline generation based on definitions, constraints and priorities using JPL’s ASPEN system  Includes spacecraft dynamics and geometry models  Will generate activity timeline and instrument commanding 5

 Features ◦ Includes monitoring campaign capability ◦ No ability to manually schedule observations ◦ The only way to get them scheduled and at desired times is by changing the criteria (duration, frequency, geometric or other model based constraints, pointing) ◦ Includes ride-along campaigns (or eventually will)  Status ◦ Concept has undergone several changes ◦ Very ambitious system and schedule ◦ Present status of some components is uncertain 6

 Would like to be on all the time (monitoring) in normal mode with some other RPC sensors  Burst mode ◦ Would like periodic burst mode operations. All operating RPC sensors would like burst mode at the same time ◦ Additional burst mode operations determined by trajectory and models, like boundary crossings  Data has to be collapsed significantly as bandwidth allocation for IES is very low, even in burst mode ◦ Select the ranges and combine counts in adjacent energy/azimiuth/elevation bins 7

 IES Operation is driven by mode tables  Each table defines ◦ Normal or burst mode ◦ Cycle length (128s, 256s, 512s, 1024s) ◦ Selection of energies for data return ◦ Collapse (sum) of counts in adjacent  Energies  Elevations  Azimuths  13 tables can be stored on board ◦ Trade time resolution vs energy resolution vs angular resolution 8

 Internal sequences – programmable series of commands separated by delta times  Can call itself (loop) so a regular continuous sequence can be setup (example – cycle between 5 hours of normal mode and 1 hour burst mode OR cycle between high energy and angular resolution tables)  8 macros stored on board of which 4 are available for customization ◦ 1 being used for gain test 9

 Gain Tests will be performed periodically to determine the nominal MCP operating voltages  How frequently?  Last gain test configuration: ◦ ~17 min at each 2525V, 2550V, 2575V, 2600V and back to nominal voltage of

 March 31 & Apr 1, 2013  Distance from earth 4.2 to 4.3 AU  OWLT: ~35 min  18 hours total with Sun in FOV for most of the time  Science data expected near real time (with light time delay) 11

Activity Estimated Time (Minutes) Low Voltage Checkout POWER ON in PROM mode 10 Expected PIU-IES Link Resets (Warn RMOC) EEPROM readout and dump PAUSE Transition to EEPROM mode (Science Mode) 10 RAM patch to generate event message indicating counts (see HV below) Frequency? Ideal desired = 1/s, Post launch commissioning = 1/32s (Discuss with RMOC) STIM PAUSE High Voltage Checkout Turn MCP high voltage on (ESA and DEF sweeping disabled) and get sum of counts using event message PAUSE HV on with ESA sweeping PAUSE HV on with DEF sweeping 15 Power OFF PAUSE

Functional Test 1 Power ON in EEPROM (Science) Mode 45 Functional test - table and mode changes (LVSCI and HVSCI) Power OFF PAUSE ELC Channel and MCP Gain Tests Power ON in PROM Mode 10 EEPROM Patch to update housekeeping fields Memory Dump Power OFF Power ON in EEPROM (Science) Mode 20 RAM Patch for ELC Noisy Channel Test Noisy ELC Channel Test - HVSCI Mode MCP Gain Test 120 Power OFF Functional Test 2 Power ON in EEPROM (Science) Mode 30 Functional test - table and mode changes Power OFF TOTAL TIME

MODE TABLES 128s256s512s1024s Name ( Normal / Burst)Solar Wind at the Comet (N)Full Coverage, Low Res (N)Solar Wind at the Comet (N)Slow Photo-electrons (N) IONS Energies202 to 5156 (Adjacent 4)Full Range + FB (Adjacent 4)25 to 5400 (Adjacent 4)Full Range + FB (Adjacent 2) Elevations0-4, 5-10, 11-15Adjacent 4Adjacent 20-1,2-4,5-7,8-10,11-13,14-15 Azimuths0,1,2,3-11,12,13,14,15 ELECTRONS Energies4 to 811 (Adjacent 4)Full Range + FB (Adjacent 4)4 to 1225 (Adjacent 3)4-811, highest (Full Res) Elevations0-4, 5-10, 11-15Adjacent 4Adjacent 2 AzimuthsAdjacent 2*Adjacent 4*Adjacent 2*0-1,2-4,5-7,8-10,12-13,14-15 Name ( Normal / Burst)Full Range, Low Res (B)Slow Photo-electrons (B)Pickup, High Res Angular (B)Solar Wind at the Comet (N) IONS EnergiesFull Range + FB (Adjacent 4)Full Range (Adjacent 2)Full Range + FB (Adjacent 4)25 to 5400 (Adjacent 3) ElevationsAdjacent 2 Full ResAdjacent 2 Azimuths0,1,2,3-11,12,13,14,15 Full ResFull res ELECTRONS EnergiesFull Range (Adjacent 4)4 to 772 (Full Res)4 to highest (Adjacent 3)4 to 811 (Adjacent 2) ElevationsAdjacent 2 Full ResAdjacent 2 AzimuthsAdjacent 2* Full Res*Adjacent 2* Name ( Normal / Burst)Solar Wind at the Comet (B) High Res Angular (B) IONS Energies202 to 5156 (Adjacent 4)4 to 4901 (Adjacent 3) Full Range + FB (Adjacent 2) ElevationsAdjacent 2 Full Res AzimuthsFull ResFull res Full Res ELECTRONS Energies4 to 3603 (Adjacent 3)4 to 811 (Adjacent 2) Full Range + FB (Adjacent 2) ElevationsAdjacent 2 Full Res AzimuthsAdjacent 2*Full res* Full Res* Name ( Normal / Burst) Pickup (B) High Res Energy (B) IONS Energies Full Range (Adjacent 2) Full Range (Full Res) Elevations Adjacent 2 Azimuths 0,1,2,3-11,12,13,14,15 Full Res ELECTRONS Energies Full Range (Adjacent 2) Full Range + FB (Full Res) Elevations Adjacent 2 Full Res Azimuths Adjacent 2*