LS1 status 6/06/2014. BLM re-installation ARC Sector 3-4 – in work, will be done to 10.06 Sector 4-5 – from 30(23).06 – 11.07 Sector for Cool.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
BLM FOR THE INJECTORS PROJECT CABLING NON-CONFORMITIES LIU-PSB Working Group Meeting (15/08/2013) Christos Zamantzas
INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
NMU Voic Welcome to. This presentation will walk you through the setup and use of the NMU Voic system. Follow the step by step instructions.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
TRACI V3 Status & Delivery Plans UPDATE Paolo Petagna LHCb CO2 cooling meeting Apr 15 th, 2015.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Matthew Gardner, 8/20/14.  Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
V. Bobillier1 Cable installation status.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
8/4/2015R. Guida PH-DT-DI1 Info 1)Air conditioning system Status: Adrian Fabich contacted CV and he is waiting for info. Today I’m going to meet experts.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
R ADIATION P ROTECTION ASPECTS LSS1 - TAN REGION Cristina Adorisio (CERN - DGS/RP)
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
EPirate Training How to Create a New IRB Study. When you Login to ePirate, click on “My Home” in the upper right hand corner of the screen.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Planning for Proto-DUNE PD Installation and Cabling at CERN
Cabling for LHCb Upgrade
RICH Status from last RICH meeting
Cabling Lengths and Timing
Disabling Rules.
Initial BIS installation
Call to Fix Dell Printer Error Code
How to Create a New IRB Study
BLM planning 24/02/2014.
BLM planning 03/03/2014.
LS1 status 28/04/2014.
How to Create a New IRB Study
LS1 status 24/03/2014.
07/07/2014 * status, all * AccTest framework
LS1 status 17/03/2014.
Experimental Areas – LS2 planning
LS1 status 07/04/2014.
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
BLM planning 03/02/2014.
LS3 Study & Readiness Meetings
Week 43 ( LHC only) Installation of BLECF in LSS 4L and LSS 4R (Adrien and Mounir) - Done Check and repairs of BLECF in LSS 4L and LSS 4R (Steve) -? Installation.
SPS Planning meeting for LS2 #25 Vacuum sectors status
SPS Planning meeting for LS2 #26 Vacuum sectors status
Presentation transcript:

LS1 status 6/06/2014

BLM re-installation ARC Sector 3-4 – in work, will be done to Sector 4-5 – from 30(23).06 – Sector for Cool Down Sector 8-1 – from due to cool down will start June 23 HV divider installation – P4 done, except 2 cases ( next slide) +Old short supports, red small boxes – RP measurement, removal and transfer (Remo) to bat 283 ___________________________________________________________________________________________________________________ LSS L4 – installed except 05L4 on week 25 ( next slide) ___________________________________________________________________________________________________________________ RSM Have to update the documents; Meeting on week 26 with RP (doc’s, loan, procedure)+ Marzia (planning, sector to sector transfer, ARC-LSS) ___________________________________________________________________________________________________________________ Russian team 2 nd team - up to 30.06, 3 rd team – from June 24 P109/A4/A2 – for prolongation up to November 30 is under signature at CERN ___________________________________________________________________________________________________________________ GIF – GIF++ From: Martin Richard Jaekel, Sent: 03 June :58 Cleanup of Side Gas Area - in the next 2 weeks Adrian Fabich: it might be the best solution to move to a temporary place in EHN1 for the moment, until definitive space is allocated. Aboubakr Ebn Rahmoun: Meeting 10 June :30-10:30 ______________________________________________________________________________________________________________ DB Expert names for re-location monitors Expert names : BLMBx and BLMTx ______________________________________________________________________________________________________________ FIC During weeks we’ll send the materials

DCUM RING START FUNCTIONAL POSITION NAME EXPERT NAMECELLVACSECMountedNOTE BLMQI.A7L4BLMQI.06L4.B2E30_MQY 7L4A7L4Yes BLMQI.F6L4BLMQI.06L4.B1I10_MQY 6L4B6L4Yes BLMQI.E6L4BLMQI.06L4.B2E20_MQY 6L4B6L4Yes BLMQI.D6L4BLMQI.06L4.B1I20_MQY 6L4B6L4Yes BLMQI.C6L4BLMQI.06L4.B2E10_MQY 6L4B6L4Yes BLMQI.B6L4BLMQI.06L4.B1I30_MQY 6L4A6L4Yes BLMQI.A6L4BLMQI.05L4.B2E30_MQY 6L4A6L4Yes Support not fixed, w23-w BLMQI.E5L4BLMQI.05L4.B1I10_MQY 5L4F5L4Yes BLMQI.D5L4BLMQI.05L4.B2E20_MQY 5L4F5L4Yes BLMQI.C5L4BLMQI.05L4.B1I20_MQY 5L4F5L4Yes BLMQI.B5L4BLMQI.05L4.B2E10_MQY 5L4F5L4Yes BLMQI.A5L4BLMQI.05L4.B1I30_MQY 5L4F5L4Yes BLMEI.D5L4BLMEI.05L4.B2E20_MBRB 5L4F5L4Yes BLMEI.C5L4BLMEI.05L4.B2E10_MBRB 5L4F5L4Yes BLMEI.E5L4BLMEI.05L4.B2E10_BSRTM 5L4D5L4No Week 25 (JC) (picture) 9936BLMED.A5L4BLMED.05L4.B1C10_BGI 5L4D5L4No Week 25 (JC),Diamond, Ewald BLMEI.F5L4BLMEI.05L4.B1I10_BGI 5L4D5L4No Week 25 (JC) Can not to install on old place ( picture) BLMEI.B5L4BLMEI.05L4.B2E20_MBRS 5L4C5L4Yes BLMEI.A5L4BLMEI.05L4.B2E10_MBRS 5L4C5L4No ready to install w23-w24, no signal cable connector? BLMEI.G5L4 BLMEI.05L4.B1I10_ACSGA.5L4.B 1 5L4A5L4Yes BLMEI.H5L4 BLMEI.05L4.B1I20_ACSGA.5L4.B 1 5L4A5L4Yes Installed but not connected,W24 From: Julie Coupard Sent: 03 June :40 First wait for the bake-equipment to be dismounted (contact N. Zelko) and then, please ask Y. Muttoni for this non-conformity of installation