Run 16 RHIC Machine/Experiments Meeting 5 Jan 2016 Agenda: Run 16 Schedule (Pile) AuAu Run Plan (Gu) Projections for deuteron-gold energy scan (Liu) STAR.

Slides:



Advertisements
Similar presentations
Bill Christie For the STAR Collaboration MARCH 24,
Advertisements

Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Run 15 RHIC Machine/Experiments Meeting 7 Apr 2015 Agenda: Run 15 Schedule (Pile)
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RUN 12 RHIC MACHINE/EXPERIMENTS MEETING 18 October 2011 (1 st meeting) Agenda: Schedule issues (Pile) Machine Status (Fischer) STAR Readiness PHENIX Readiness.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
Run 12 RHIC Machine/Experiments Meeting 3 Jan 2012 (4 th meeting) Agenda: Run 12 Priorities.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
STAR Ready to move on to 7.7 GeV Bill Christie For The STAR Collaboration April 13, Please N.B. All data plots shown in this presentation are online.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Cold Nuclear Matter effects at RHIC Latest results (run 2008) Frédéric Fleuret - LLR1/18.
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
General Status of STAR pp run as of June 1, pb -1 delivered ~1.78 pb -1 sampled 292 nb -1 delivered ~ 93 nb -1 sampled (93/180 ~ 52%) N.B
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Draft Report of the RHIC Planning Group T. Ludlam Open Meeting on RHIC Planning Dec. 3-4, 2003.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
Run 12 RHIC Machine/Experiments Meeting 7 Dec 2011 (3 rd meeting) Agenda: Run 12 Priorities.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
STAR Run 16 Schedule Zhangbu Xu Machine/Experiment Schedule Meeting 01/05/2016.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
Nu Xu1/20STAR Regional Meeting, VECC, India, November, 2008 STAR Experiment STAR at RHIC Nu Xu Lawrence Berkeley National Laboratory.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Brookhaven Science Associates U.S. Department of Energy BNL’s Plans for RHIC Detector Advisory Committee December 19, 2002 T. Ludlam.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
PHENIX J/  Measurements at  s = 200A GeV Wei Xie UC. RiverSide For PHENIX Collaboration.
Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
11 Nov J. Schukraft1 Future of Heavy SPS/RHIC programs SPS/RHIC programs Initial LHC Program Initial LHC Program  ~ 2017 Long.
Run 16 RHIC Machine/Experiments Meeting March 1, 2016 Agenda: Run 16 Power use/cost (Christie) Short presentation by PHENIX (Denis Jouan) AOB READYTALK.
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
RUN16 Status Y. Akiba (RIKEN/RBRC) 2016/05/27 Radiation lab meeting.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run16 Y. Akiba.
Heavy Ion Physics in RUN14-16
Y. Akiba (RIKEN/RBRC) 2016/04/21 Radiation lab meeting
Y. Akiba (RIKEN/RBRC) Radiation Lab meeting 2016/06/30
Run-5 Cu-Cu Integrated Luminosity
Presentation transcript:

Run 16 RHIC Machine/Experiments Meeting 5 Jan 2016 Agenda: Run 16 Schedule (Pile) AuAu Run Plan (Gu) Projections for deuteron-gold energy scan (Liu) STAR (Xu) PHENIX (Jouan) Other READYTALK LOGIN INFO Audio Login Toll-Free (US & Canada): Toll: Access Code: ReadyTalk link

Run 15 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 today, 5 Jan… 19 Jan, Begin cool-down to 4.5K 22 Jan, Beam in Blue 5 Feb, Begin 10 week √s=200 GeV/n AuAu physics run 15 April, End 10 week √s=200 GeV/n AuAu physics run 19 April, Begin 1.2 week √s=200 GeV/n dAu physics run 27 April, End 1.2 week √s=200 GeV/n dAu physics run 29 April, Begin 1.2 week √s=62 GeV/n dAu physics run 7 May, End 1.2 week √s=62 GeV/n dAu physics run 9 May, Begin 1.2 week √s=39 GeV/n dAu physics run 17 May, End 1.2 week √s=39 GeV/n dAu physics run 19 May, Begin 1.2 week √s=20 GeV/n dAu physics run 27 May, End 1.2 week √s=20 GeV/n dAu physics run 29 May, Begin 5 day E=40 GeV/n Au CEC physics run 3 June, End 5 day √s=40 GeV/n Au CEC physics run 3 June, begin cryo warm-up 7 June, cryo warm-up complete, 20.0 cryo weeks of operation See for the Run Coordinator’s detailed planhttp:// Note 2 day setup time assumed between energy scan runs, Chuyu assumes 0.5 weeks and scan in ascending order

From Fischer et. al., RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015

PHENIX goals 10 weeks, 1.8 nb-1 with 12 billion MB events recorded within |z|< 10 cm vertex STAR goals 13 weeks 10nb-1 sampled for MTD and 2 billion MB events recorded for HFT, request dynamic  * squeeze

From Fischer et. al., RHIC Collider Projections (FY 2016 – FY 2022), 19 April Chuyu’s latest projections

Balanced Billing for the lab +$148K (ahead) Sep through Nov 2015

Archive

Who’s Who for 2016 RHIC 100 x 100 GeV AuAu: Run Coordinator: Xiaofeng Gu, RHIC dAu Energy Scan: Run Coordinator: Chuyu Liu, RHIC CeC POP Experiment: Run Coordinator: TBD Scheduling Physicist: Bill Christie, (x4643 after 29 Assistant Scheduling Physicists through 29 Jan: Yousef Makdisi, Phil Pile, AGS Liaison: Haixin Huang,

Who’s Who for 2016 RHIC 100 x 100 GeV AuAu: Run Coordinator: Xiaofeng Gu, RHIC dAu Energy Scan: Run Coordinator: Chuyu Liu, Scheduling Physicist: Bill Christie, Assistants through 29 Jan: Yousef Makdisi, (office) Phil Pile, (office), AGS Liaison: Haixin Huang,

17 Executive Summary Table RunEnergyDurationSystemGoalsprioritySequence 16 s NN =200 GeV s NN =62 GeV s NN =19.6 GeV 13-wk 4-wk 1-wk Au+Au Au+Au d+Au  c, D v 2, R AA, ϒ R AA 10nb -1, 2billion MB 1.5B MB (1B w/ HFT) 100M MB s = 510 GeV s NN =19.6 GeV s NN =200 GeV s NN =200 GeV 11 wk 1-wk 3-wk 3-wk Transverse p+p p+p Ru+Ru Zr+Zr A N of W ±, , Drell-Yan, L=360 pb -1, 55% pol 400M MB 1.2billion MB 1.2billion MB In each scenario, the data requirements for STAR’s two top priority scientific goals will be met. In no scenario can all the data needs for all programs be met in runs 16 and 17 STAR BUR

18 PHENIX Proposal for Run-16 We present a plan assuming 10 week so 200 GeV The optimum for PHENIX is to run Option A and Option B both