A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section www.europeanspallationsource.se 05/02/16.

Slides:



Advertisements
Similar presentations
Tools used for the beam commissioning of J-PARC LINAC Guobao SHEN J-PARC Center Japan Atomic Energy Agency Mar
Advertisements

LINAC4 and 3 MeV test stand at CERN
K. Long, 18 April, 2015 Beam-line status — red sky at night?
R. Miyamoto, Beam Physics Design of MEBT, ESS AD Retreat 1 Beam Physics Design of MEBT Ryoichi Miyamoto (ESS) November 29th, 2012 ESS AD Retreat On behalf.
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Managed by UT-Battelle for the Department of Energy SNS MEBT : Beam Dynamics, Diagnostics, Performance. Alexander Aleksandrov Oak Ridge National Laboratory.
ESS DTL beam commissioning
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
4.0 Accelerator Physics & Pre-operations (1.10) Phil Martin, Stan Ecklund, Rick Baartman & Peter Limon 4.1Accelerator Physics Findings The hot spare.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Status of REX and Commissioning with Beam Dr. Jose Alberto Rodriguez, BE-OP-PSB (167538)
Anders Sunesson RF Group ESS Accelerator Division
LINAC4 COMMISSIONING A.Lombardi BCC 8-19 Nov 09 Linac4 BCC Nov 2009Alessandra Lombardi.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
PIP Status Report Linac Startup plans 12/05/2012.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
The Stripping Foil Test Stand in the Linac4 Transfer Line
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
PIP Status Report Linac Startup plans 12/05/2012.
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
CERN Andrea Apollonio page 1 MACHINE PROTECTION CONSIDERATIONS FOR 50 MeV LINAC4 BIS COMMISSIONING A.Apollonio, B. Mikulec, C. Martin, B. Puccio, F. Roncarolo,
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
R. Miyamoto, MEBT Lattice Optimization, ESS AD Beam Physics Internal Review 1 MEBT Lattice Optimization Ryoichi Miyamoto (ESS) For Beam Physics Group,
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
SNS linac beam commissioning By Michael Plum Spallation Neutron Source Oak Ridge National Laboratory ESS Workshop on beam commissioning April 8-9, 2014.
ESS wire scanner Benjamin Cheymol
Linac4 DTL Beam Dynamics 1Jean-Baptiste Lallement – Mini-workshop on DTL design - 13/09/2011 Mini-workshop on DTL design – 13 September 2011 JB Lallement,
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
The Preparation for CSNS Accelerator Commissioning Sheng Wang June 8, 2015, Dongguan.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
ESS Front End diagnostic
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Linac Design Update Project WP6 - Monthly Report –
CALIFES A proposed electron beam test facility at CERN
Linac4 status and perspectives
Experience with beam instrumentation at Linac4
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Linac4 RF System Operation for the Reliability Run in 2017
LINAC4 commissioning plans etc.
ESHAC meeting October 1-2, 2018
Considerations on Beam Diagnostics Physics
commissioning and measurements
Beam Commissioning at ESS
RF systems introduction
High Level applications development status
(Beam) Commissioning Plan
Beam Commissioning Planning
Lessons from the 1st Safety Readiness Review
RF introduction Anders Sunesson RF group leader
Presentation transcript:

A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section 05/02/16

Linac4 Overview 2

3 Linac 4 ESS

Linac4 Overview 4 Figure borrowed from [4]

Linac4 Overview – Front End 5 Courtesy J-B Lallement

Linac4 Overview 6 linac4_virtual_tour.wmv

MEBT Schematic Overview 7 Courtesy J-B Lallement Buncher cavities Chopper cavities Collimator cone BPM FCT Wirescanner

8 Test Bench Courtesy J-B Lallement

9 Test Bench Taken from [5]

50 MeV Commissioning 10 Courtesy J-B Lallement

Summary of week 45 Yngve was present for entire week, 2. Nov – 6. Nov Renato was present for entire week following A peak into an actual week of commissioning Some things will be different for us, some things will be similar 11

One Week of Scheduled Beam Commissioning (DTL 2-3) Monday: Delays getting access card (1 st day of month), tank 1 had been commissioned week prior, interlock problems, unfamiliar applications, logic not always understood, 50% beam lost in MEBT, quad polarity -> access Tuesday: vacuum problem during night -> source issues, 5pm first beam commissioning of day (they quit at 6), RFQ sparking, attempt to measure beam energy in MEBT with test stand Wednesday: buncher cavities calibrated, RF expert came in at end of day to warn about potential serious damage to bunchers if left on. Thursday: nothing, major intervention on buncher cavities Friday: still intervention in morning, after lunch buncher cav. Commissioned -> factor 2 improved transmission, finally trying to debug the issues with tank 2&3. 12

A Few Thoughts Linac4 commissioning is manpower limited. Only day shift available for beam commissioning. About 2-3 people are actually doing beam commissioning, all with other projects going on. Expert applications are typically written by experts. They will be hard to use by operators unless thorough preparations&training are done. Generic tools such as correlation tools, data collection & parameter scan tools are very useful during commissioning. 13

Some More Thoughts Masking interlocks is the name of the game There will be surprises Linac4 team is manpower limited, so ESS could perhaps have benefited from having one person working on the Linac4 commissioning for an extended period and gain experience. 1 week is quite short period for such a visit and most likely a lower limit. With a bit of bad luck nothing will be going on. 14

Display Examples – History plot (vacuum) 15 RFQ ramp up

Display Examples – Synoptic Viewer 16

Displays Examples 17

Display Examples 18

ESS Control Room Applications 19

ESS Control Room Applications 20

ESS Control Room Applications 21 Quick prototyping with scripts Many existing applications we can reuse with minimal effort

ToF measurements It was already used at 12 MeV commissioning stage. Measure the energy by scanning the phase of a DTL tank for different amplitudes. Compare the result by simulations and deduce the operational amplitude and phase. Repeat the procedure for each DTL tank. 22 Tank-1Tank-2Tank-3 Measurement Bench Tank-1Tank-2Tank-3 Measurement Bench Tank-1Tank-2Tank-3 Measurement Bench Slide courtesy Dimov, Lallement & Lombardi

Measurements Tank1: 12 MeV 23 Lines: simulation Dots: Measurement Slide courtesy Dimov, Lallement & Lombardi

Measurements Tank2: 31.5 MeV 24 Lines: simulation Dots: Measurement Slide courtesy Dimov, Lallement & Lombardi

Thanks A great big thanks to the Linac4 commissioning team, and in particular Alessandra Lombardi, Jean-Baptiste Lallement & Veliko Dimov for this opportunity and being extremely helpful during the visit! 25

References 1.Commissioning and Operational Experience Gained with the Linac4 RFQ at CERNCommissioning and Operational Experience Gained with the Linac4 RFQ at CERN 2.Transverse Beam Profile Measurements in the Linac4 MEBTTransverse Beam Profile Measurements in the Linac4 MEBT 3.Status and plans for Linac4 installation and commissioningStatus and plans for Linac4 installation and commissioning 4.Linac4: Progress on Hardware and Beam Commissioning 5.User Specifications for Linac4 Test Bench Diagnostics