STEP-1 Open the screw cap with some sharp pin point object. STEP-2 Unscrew all the screws with help of a “+” type screwdriver. STEP-3 Disengage all the.

Slides:



Advertisements
Similar presentations
Knock Down Fittings Product Design.
Advertisements

Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Introduction. Introduction: Things to Prepare before Assembly Anti-static wrist strap Set of screwdrivers and pliers Piece of cloth CPU Thermal compound.
CHAPTER 45 Engine Lubrication.
SweepBot is a cleaning robot that cleans floor as brushes spin on High-speed DC Motor. Sweep.
Fortress FortressBot is a throwing robot..
1 (1D Scanner) Maintenance Book Version 1.0 ©2014.
Changing the Oil in a 2006 Mitsubishi Eclipse. Introduction Changing the oil in your 2006 Mitsubishi Eclipse is easier than you may think. With a few.
Compression Fittings Internal nut type. Compression fittings Rugged and durable. Firm joint using all brass construction For use with plastic and metal.
Servicing Welch DRYFAST ULTRA Pump Models 2032
MER/SUP 1 DOOR EVAPERATOR DRAIN PAN REPLACEMENT 1. Remove the (4) screws that secure the evaporator coil, using a 5/16” socket.
Yamaha oil pump rebuild
( 1 ) PROCEDURE FOR FLAT HEAT PRESS OPERATION PROCEDURE FOR MULTI FUNCTION HEAT PRESS MACHINE.
MyLock 644D Service Seminar.
© Copyright year ABB. All rights reserved /1/2015 Insert image here VR-3S Procedure for the Removal of the PCD from the Low Voltage Cabinet.
2G BBULBE PASS Instructions-4 Replacement of bubble generator.
Model 495/496 EP Full lift safety valve with spring loading (AIT) model 495/496 - EP. 1. Disassembly and assembly. 1.1 Disassembly. To replace the spring,
Mer/Sup. 2 & 3 Door Evaporator Coil Repositioning Procedure S. Starnes 7/11/03 1. Remove the 2 screws holding one end of the evaporator coil. (view shows.
CYCLE ROAD SAFTEY! By Mac. INTRODUCTION To go on the road you must always be aware of danger since there are cars. To make sure you are as safe as you.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
L2000 Technical Training 6. Assemble/Disassemble.
Universal Holding Cabinet Two screws hold each side; four screws secure the top.
Model DISASSEMBLY AND ASSEMBLY 1- Disassembly To replace the spring (11), or clean any of the internal components of the valve, proceed in the.
Model 995 EP DISSASSEMBLY AND ASSEMBLY 1.Disassembly To replace the spring or clean any internal components of the valve, proceed in the following manner:
Model 895 AP DISSASSEMBLY AND ASSEMBLY 1.Disassembly To replace the spring or clean any internal components of the valve, proceed in the following manner:
1 © 2011 Profile Recorder for ProtoFlow S Installation Instruction.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Showing Demonstrations on the TV How to connect the camera to our TV set.
Servo ServoBot is a robot that cleans a thing using Servo Motor.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Lesson 3 How to Construct Your Own Personal Computer.
Air Racer Design and Layout.
Procedure of Connecting Coil Unit In series with Capacitor 10 April 14 Product: Fully Automatic Washing Machine.
Removing and Replacing the Battery Cover 1. Ensure the phone is turned off. 2. Press the Battery cover locker; lift the battery cover up and away from.
Ms Imai Lee High School Unit 2: Let’s Get Tiny. In your notes write a paragraph responding to the prompt below. Warm-Up Do you think these pictures are.
A BOOK BINDING TECHNIQUE. MATERIALS NEEDED Stiff cardboard with neat edges Contact paper (also known as shelf paper) color or clear Box cutter Pencil.
Computer Disassembly and Reassembly Presentation by: James Hinton, Derrick Sartain, and Steve Evans.
Clearing Procedures. DISASSEMBLY Major Groups Barrel Group Turn the cover latch and raise the cover group Grasp the retracting slide handle with the.
Smart Vehicle Tracker Installation Guide AVT-2000B V2.10.
2G BBULBE PASS Instructions-5 Replacement of Heater.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
Sikes & West S4P3a: Identify simple machines and their uses.
Port Throttle Solution Does your port throttle drop back when you remove your hand. Here is the fix….and it costs nothing! me with any questions:
Clarinet Assembly Best assembly to prevent unnecessary repairs.
Remove 4 Phillips screws that hold tape drive cover (2 on each side) Phillips screws.
Parts of the Bernina 240 Sewing Machine Dalton- Clothing Instructions: Please go through The Parts of the Sewing Machine and explore each part on your.
Build A Motor You must follow the directions step-by-step!
M300, M300N, M300Z (2½ ”–10”) M300A (2½ ”- 4”). Modification Overview  Production began in 2000 under the Hunter name. In 2002 it was produced as the.
PROBLEM STATEMENT: EXCESS ICE FORMATION IN FREEZER COMPARTMENT ( 190L FF BAN FACTORY) Brand NameVideocon,Kelvinator Defect Pictures Product NameREF Model.
INSTALLATION MANUAL FATL Machine Installing: ACTIVITY CHECK POINT 1. Minimum two persons required for opening the Machine. 2. Cut the straps & tape. 3.
Get Easy Battery Replacement Guide at Battfix.com
PostBase Automatic Feeder Component Removal Service Training
X-Spot Lamp Socket Replacement Procedure
"This document can not be used without Samsung's authorization"
Collecting soil bulk density samples
HYBRID COOKTOP.
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
C200, C200N, C200Z (2½ ” – 10”) C200A (2½ ”- 6”).
M200, M200N, M200Z (2½”– 10”) M200A (2½”- 4”).
C300, C300N, C300Z (21/2”–10”) C300A (21/2”- 6”).
757DCDA, 757N DCDA (21/2”–10”) 757A DCDA (21/2”- 6”)
Step 1:Disassemble battery case
BUILDING AN AUTONOMOUS QUADCOPTER.
757, 757N, 757Z (2½ ” – 10”) 757A (2½ ”- 6”).
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Cable Cap.
Repair Guide SYM XT Series.
Fix your Fireplace SYM-B Series.
Presentation transcript:

STEP-1 Open the screw cap with some sharp pin point object. STEP-2 Unscrew all the screws with help of a “+” type screwdriver. STEP-3 Disengage all the connectors from their respective slots. SECONDARY HEATER FIXING IN THROUGH DRAINS OF FF-TITANIUM SERIES

STEP-4 Open the F-Louver and take it away. STEP-5 Open the screw in right side which holds the heater/ evaporator assembly in cabinet. STEP-6 Pull the tubes looping over the evaporator assembly outward.

STEP-7: Lift the evaporator assembly.STEP-8: Pull out the through drain. STEP-9: Pull out the through drain and clean properly So that Al-Foil heater stick properly.

STEP-10: Peel out the paper from secondary heater. STEP-11: Assemble the heater in though drain as shown in picture after cleaning with cloth

STEP-12 Put the Through Drain assembly back in its slot. STEP-13 Paste the harness in right corner and put the evaporator down in its initial position. STEP-14 Take out the connectors safely from behind of EPS covers only without damaging sleeves of harness.

STEP-15 Connect the heater connector in middle slot of male connector given in right upper corner. STEP-16 Re-adjust the tube loops on top of evaporator assembly. STEP-17 Fix the screws back to fix the evaporator assembly in cabinet.