Power controls, Sept. 2006A.Fabich1 MERIT installation: Controls for the 5MW power-supply A.Fabich CERN AB-ATB September 2006.

Slides:



Advertisements
Similar presentations
Pixel Chip Testing S. Easo, RAL Current Status of the Pixel Chip Testing. Plans for an LHCb Test Setup at CERN.
Advertisements

Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
MERIT Review Meeting: Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN Cryogenics for Experiments Accelerator Technology Department Presented by Adrian.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
31.March.2004 C. A. Martins, CERN AB/PO 1 Analysis of the possibility of using of a ALICE/LHCb type power converter in TT2A target test by Carlos DE ALMEIDA.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos – CERN, AB Dept. Thanks to: A.Fabich, H.Haseroth,
Video 7.Dec. 2004A.Fabich, CERN1 CERN P186 Video Conference Access to TT2A during PS extraction POSSIBLE, see also memo at homepage: subsystem/safety/radiation.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Timing Issue for Mercury Target Hee Jin Park (SUNY Stonybrook, BNL) Ilias Efthymiopoulos (CERN) Adrian Fabich (CERN)
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
The TIMING System … …as used in the PS accelerators.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
INS Data Collection System Presenter: Curtis Cutright Advisor: Dr. Michael Braasch.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
Sophie BARON, PH-ESSLEADE - 07 Nov  TTC system status reminder  Upgrade principle  [Some] details about the infrastructure  Practical implementation.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
A.Dinius AB/PO/IEE - BIS Audit 18 th September 2006 Beam Interlock System Hardware Implementation.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
Electrical Discharge Circuit for CNGS Horn & Reflector PH/DT1 Group Meeting, 23 October 2007 Gilles MAIRE PH/DT1-IC Section Leader.
ICALEPCS 2005 Advanced uses of the WorldFIP fieldbus for diverse communications applications within the LHC power converter* control system Quentin King.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
The recent history and current state of the linac control system Tom Himel Dec 1,
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE Purpose, Scope and deliverables Javier Serrano.
GMT Config. for the experiments: Summary of received requests / LEADE Meeting 4 th Feb.08 / B.P. 1 Summary of received requests for Safe Machine Parameters.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Report on Controls, TCC meeting 23 th June 2005 – Cl.Dehavay & Co - AB/CO/HT 1 Claude DEHAVAY - CERN/AB/CO/HT Installation Readiness Report - Controls.
MobiDick4 progress report Carlos Solans. Introduction MobiDICK is a complete test bench for super-drawers Will be used during the maintenance in the long.
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos Thanks to: A.Fabich, H.Haseroth, F.Haug, J.Lettry,
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
TE-EPC internal review of the ELENA project
Beam diagnostics from GSI
MERcury Intense Experiment Experiment Layout
LAPP BPM Read-out Electronics
P. Charrue on behalf of AB/CO/IN
The ELENA BPM System. Status and Plans.
Strategy for long-term support of the TTC system
Status on the PS/SPS  MERIT (nTOF11) interface
M. Zerlauth, I. Romera 0v1.
Hee Jin Park (SUNY Stonybrook, BNL) Ilias Efthymiopoulos (CERN)
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Discussion on MERIT Cryogenics Specifications
Commissioning the European XFEL cryogenic system and best practice
Presentation transcript:

Power controls, Sept. 2006A.Fabich1 MERIT installation: Controls for the 5MW power-supply A.Fabich CERN AB-ATB September 2006

Power controls, Sept A.Fabich 2 People AB/PO Gilles Le Godec AB/CO Marc Vanden Eynden Pablo Alvarez Sanchez (Javier Serrano) MERIT Adrian Fabich (Ilias Efthymiopoulos)

Power controls, Sept A.Fabich 3 Outline Purpose of this meeting Evaluation of possible layout and work effort The 5MW power supply in building 193 Controls layout Estimate of installation work

Power controls, Sept A.Fabich 4 Reminder MERIT Single pulse experiment (limited cycles ~500) Runtime very limited (a few weeks) Installation is temporary Jan-July 2007 (Run including a commissioning phase) Solutions and implementation of controls layout could be based on rental. Budget (T273180) available

Power controls, Sept A.Fabich 5 Location ISR Westarea MERIT control room Power converter MERIT experiment and local controls (underground)

Power controls, Sept A.Fabich 6 Building 193 AD control room AD ring

Power controls, Sept A.Fabich 7 Controls layout (Javier) Version 1 (notation Gilles): without GFAS Console MERIT control room (MERIT, AB/CO) G64 (AB/PO) VME (AB/CO) CPU + timing + BC Ethernet Timing (start, stop,...) MIL1553 BC = bus controller Version 1 (notation Gilles): with GFAS CPU Ethernet TimingGFAS BC VME crate (from above) MIL1553 Analogue signal

Power controls, Sept A.Fabich 8 Additional information MERIT control room: room 272 S-002 Independent from CCC Information transmitted to PowerControls Reference current Timing, trigger Information read (displayed in MERIT control room): Current reading Status of power supply (Off, ready, interlock, error)

Power controls, Sept A.Fabich 9 Questions With or without GFAS? Which parts are already available in building 193? VME crate? Cables (MIL1553, timing...)? Ethernet?... Software in the MERIT control room Where are the interlocks coming into the game?

Power controls, Sept A.Fabich 10 Schedule & runtime Spring/Summer 2006: Installation Power supply (converter + transformer) DC cabling (building 193 to TT2A) Autumn 2006: Power converter fully refurbished Winter 2007: AC cabling Controls Commissioning of the power supply February 2007: MERIT hardware installation March-April 2007: MERIT commissioning May 2007: ready for MERIT physics run