R. ArnoldCLIC08, CERN, 16 Oct 20081 Heat and Radiation in the Water and Shielding in the18 MW Water Dump for ILC Preliminary Results from FLUKA and FLUENT.

Slides:



Advertisements
Similar presentations
Photon Collimation For The ILC Positron Target Lei Zang The University of Liverpool Cockcroft Institute 24 th March 2007.
Advertisements

Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
R. ArnoldDumps - LCWS08, 19 Nov Heat and Radiation in the Water and Shielding in the18 MW Water Dump for ILC Preliminary Results from FLUKA, FLUENT.
Zero Degree Extraction using an Electrostatic Separator Take another look at using an electrostatic separator and a weak dipole to allow a zero degree.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
Shielding Studies using MARS Monte Carlo code Noriaki Nakao (SLAC) Jan. 6, 2005, WORKSHOP Machine-Detector Interface at ILC, SLAC.
May 17-19, 2000 Catalina Island, CA Neutrino Factory and Muon Collider Collaboration Meeting 1 Target Support Facility for a Solid Target Neutrino Production.
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
PROBLEM: Radiation Dose Rate in IR2 When IR1 is Operating (and Vice Versa) Muon Dose Rate > 1 mRem/hr for 0.1% Collimated Halo.
The JPARC Neutrino Target
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
2009 Linear Collider Workshop of the Americas Amann - 10/01/09 Global Design Effort 1 Status Update 18MW ILC Beam Dump Design John Amann Mechanical Engineer.
Norbert Tesch (DESY) – Design Studies for an 18 MW Beam Dump at TESLA – ICRS 10 / RPS 2004 – Madeira – May Norbert Tesch, A. Leuschner, M. Schmitz,
LCWS 2010 Amann - 3/26/10 Global Design Effort 1 Status Update 18MW ILC Beam Dump Design John Amann Mechanical Engineer SLAC National Accelerator Laboratory.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
NLC - The Next Linear Collider Project NLC Backgrounds What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
ILC Beam Dump Issues Tom Markiewicz For SLAC BDS in particular, Clay Corvin, Eric Doyle & Dieter Walz DESY/SLAC/UK Beam Dump DESY 16 February.
1 Radiation Safety Aspects of the Linear Collider B. Racky, A. Leuschner, N. Tesch Radiation Protection Group TeV Superconducting Linear Accelerator.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Radiological Aspects of ILC Hee-Seock Lee Pohang Accelerator Laboratory 2 nd Workshop of Korean ILC at PAL.
Study of a new high power spallation target concept
Design of the Photon Collimators for the ILC Positron Helical Undulator Adriana Bungau The University of Manchester Positron Source Meeting, July 2008.
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
Summary Why consider a packed bed as a high power target?
Date Event Global Design Effort 1 Overview of Mechanical Engineering Design Progress for LC 18MW Beam Dump CLIC08 10/16/08 (From left) Dieter Walz, Ray.
CLIC Post-Collision Line and Dump
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
JPARC- Decay Volume M.Sakuda (KEK) 11 November Decay Volume Requirements Design 2. Construction Status 3. Summary and schedule In collaboration.
Radiation safety evaluation for “KAMABOKO” Main Linac Tunnel KEK-APL : T.Sanami, S.Ban KEK-ACC : A.Enomoto, M.Miyahara ILC Mechanical & Electrical Review.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
XFEL-INJ1/2 DUMPS Remarks / Requirements, Injector Beam Dynamic Review Meeting, DESY, Mon. 23. October 2006 ‹#› XFEL - INJ 1/2.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
Investigation of a “Pencil Shaped” Solid Target Peter Loveridge, Mike Fitton, Ottone Caretta High Power Targets Group Rutherford Appleton Laboratory, UK.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
Estimates of Radiation Levels in the Main Linac Tunnel and Beam Dump Caverns for the CLIC Design Study Sophie Mallows, Thomas Otto SATIF 10, S.
Collimator and beamline heating External Review of the LHC Collimation Project CERN Wed 30/6/2004.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
Considerations for an SPL-Beamdump Thomas Otto CERN in collaboration with Elias Lebbos, Vasilis Vlachoudis (CERN) and Ekaterina Kozlova (GSI) Partly supported.
Parameters of the NF Target Proton Beam pulsed10-50 Hz pulse length1-2  s energy 2-30 GeV average power ~4 MW Target (not a stopping target) mean power.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
GRAN SASSO’S HADRON STOP Temperature’s behaviour under specified beam conditions Barbara Calcagno.
F.Staufenbiel / EuCARD 2 / Heat load and stress studies of the ILC collimator G. Moortgat-Pick 1;2 S. Riemann 2, F. Staufenbiel 2, A. Ushakov.
AWAKE: D2E for Alexey beam properties Silvia Cipiccia, Eduard Feldbaumer, Helmut Vincke DGS/RP.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
EURISOL, TASK#5, Bucuresti, November 1 Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
R. Arnold SLAC 24 June 2002 Real Photon Collaboration Conceptual Design Review Beam Monitoring Instruments.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
ILC main dump issue AWLC /26
Primary Vacuum Window and Water Dump for the ILC-Photon Beam
J. Bauer, V. Bharadwaj, H. Brogonia, A. Fasso, M. Kerimbaev, J. Liu, S
Heating and radiological
P. Sievers/CERN. A. Ushakov/Univ. Hamburg. S. Riemann/DESY-Zeuthen.
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Beam Dump outline work plan (UK perspective)
Extract from today’s talk given to DCB
Another Crazy Idea of a LC Dump
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
CFS consideration on the Main Dump and around
Higgs Factory Backgrounds
RC1 Prototype Conceptual Design Review 15 December, 2005
Standard SLAC BSY Copper Protection Collimator Rated at 20 kW
Background Simulations at Fermilab
Presentation transcript:

R. ArnoldCLIC08, CERN, 16 Oct Heat and Radiation in the Water and Shielding in the18 MW Water Dump for ILC Preliminary Results from FLUKA and FLUENT Computational Fluid Dynamics R. G. Arnold SLAC CLIC08 Meeting, CERN, 16 October 2008 Reporting for SLAC-BARC Dump Group J. Amann, R. Arnold, D. Walz Stanford Linear Accelerator Center Stanford CA P. Satyamurthy, S.Pal, P. Rai, V. Tiwari Bhabha Atomic Research Centre Mumbai, India

R. ArnoldCLIC08, CERN, 16 Oct Starting Point for This Work  SLAC 2.2 MW Water Dump, The Stanford Two-Mile Accelerator, R.B. Neal Ed, (1968).  High Power Water Beam Dump for a LC, M. Schmitz, TESLA Collaboration Meeting, 16 Sept  ILC Main Beam Dumps -- Concept of a Water Dump, D. Walz Snowmass, 18 Aug  Dumps and Collimators, ILC Reference Design Report, 2007 The conclusion of this work is that the 18 MW Dump would be: High pressure (~10 atm) water rapidly circulated to remove heat by bulk mass flow. Instantaneous water temperature not to exceed 180 deg C (boiling point). Water cooled in two- or three-loop circulation to heat exchangers. Entrance window is thin Ti alloy with special cooling. Beam spot must be swept at radius large enough to reduce max heat density during one bunch train to prevent water boiling and window failure. Many details to be worked out -- that’s our goal.

R. ArnoldCLIC08, CERN, 16 Oct Goals for This Work  Study maximum heat density deposited for asymmetric beam spots and various sweep radii.  Study thermal, mechanical, and hydrodynamic parameters for high-pressure, high-volume water flow to remove 18 MW while not boiling the water.  Determine parameters for water tank, inlet and outlet headers, cooling loops that can lead to realistic design.  Study prompt and residual radiation for realistic water tank, windows and shielding.  Determine options for practical and adequate shielding.  Explore ways to minimize costs. Studies of Heat and Radiation Studies of Mechanical Design for Tank, Windows, and Window Changers, see John Amann’s Talk

R. ArnoldCLIC08, CERN, 16 Oct Beam Parameters and Layout - ILC RDR IP Dump Service Hall Dump Hall Muon Spoiler Hall Insertion Beam Line Extraction Beam Line Beam: 500 GeV 4 Hz bunch train/sec, 2820 bunches/train, 2X10 10 e - /bunch 18 MW 300m IP-to-Dump face 14 mr Crossing angle 100m disrupted beam collimation region Sweep Magnets 3 cm radius at dump Asymmetric beam spot

R. ArnoldCLIC08, CERN, 16 Oct Verification of Deposited Energy Density for TESLA Round Beam High Power Water Beam Dump for a LC, M. Schmitz, TESLA Collaboration Meeting, 16 Sept cm sweep radius Fluka (1) results, binned in R-  -Z, summed over  Maximum energy density ~ 160 J/cm 3 Maximum longitudinal energy density at shower max (1) - A. Ferrari, P.R. Sala, A. Fasso`, and J. Ranft, "FLUKA: a multi-particle transport code", CERN (2005), INFN/TC_05/11, SLAC-R-773

R. ArnoldCLIC08, CERN, 16 Oct Energy density hot spot when sweep is in direction of long axis Energy density cool spot when sweep is in direction of short axis Effect on Maximum Energy Density from Sweeping Asymmetric Beam Spot Design sweep radius and water cooling for the hot spots

R. ArnoldCLIC08, CERN, 16 Oct Effect of Sweep Radius on Maximum Energy Density Sweep radius 8 to 9 cm required for 500 GeV asymmetric beam spot.

R. ArnoldCLIC08, CERN, 16 Oct Study Water Temperature Variation in Space and Time Fluka results for 500 GeV beam with asymmetric spot for input to CFD analysis with FLUENT 6.3 by P. Satyamurthy and colleagues, BARC. Next slide shows 2-D steady state solution for thin slice in z at energy density maximum z =1.82 m 6 cm sweep

R. ArnoldCLIC08, CERN, 16 Oct Space Distribution of Steady State Water Temperature 50 0 C water inlet, 2.5 m/s Inlet Beam spot, 6 cm sweep radius Use 2-D FLUENT models to study water velocity, header size, beam spot location, sweep radius. Max water temp C Outlet Temp K

R. ArnoldCLIC08, CERN, 16 Oct Time Dependence of Water Temperature Temperature at the hottest time just after one bunch train 4 Hz bunch trains Transient max T ~152 0 C Water does not boil. Steady state T ~ C  T ~ 32 0 C Water inlet T = 50 0 C

R. ArnoldCLIC08, CERN, 16 Oct Radiation and Shielding - Dump Hall-Tank Geometry Version 1 Extraction Beam Line Shd0 - Iron Shd1 - Concrete Sump Copper Tail Catcher Modeled on 2.2 MW SLAC Beam Dump East. Tank in open area covered with shielding. External Tail Catcher and Back Stop. Open sump for emergency water containment. Shielding per ILC RDR - 50 cm Iron cm Concrete. FLUKA (1) simulations of primary beam only, no disruption, no beam sweeping. (1) - A. Ferrari, P.R. Sala, A. Fasso`, and J. Ranft, "FLUKA: a multi-particle transport code", CERN (2005), INFN/TC_05/11, SLAC-R-773 Not a good plan

R. ArnoldCLIC08, CERN, 16 Oct Plan View Elevation View Problems Large Edep in shield gives large temp increase, many 0 C/hour without active cooling Large volume of activated air Prompt Energy Deposition - J/cm 3 /hour - Geometry V1  T ~ 25 0 C/hour

R. ArnoldCLIC08, CERN, 16 Oct Section View Mid Tank Elevation View Tail Catcher Problems Large Edep in shield gives large temp increase, many 0 C/hour without active cooling Large volume of activated air Independent tail catcher: -> large Edep in tank end wall -> requires separate water -> leaves gaps for air activation Prompt Energy Deposition - J/cm 3 /hour - Geometry V1  T ~ 25 0 C/hour

R. ArnoldCLIC08, CERN, 16 Oct Dump Hall - Tank - Geometry Version 2 Shd0 - Iron Shd1 - Borcrete Shd2 - Borcrete Sump Insertion Beam Line Extraction Beam Line Surround Dump Tank with 50 cm Iron + ~200 cm Borcrete (Concrete + 5% Boron). Minimize volume of activated air. Tail Catcher inside Dump Tank. Small open area around windows for changer mechanism to be developed. Beam Line Magnets This plan can work.

R. ArnoldCLIC08, CERN, 16 Oct Dump Tank - Shd0 - Windows - Geometry Version 2 30 kW Collimator 3 protects window flanges from disrupted beam Beamline Exit Windows Open area with He gas reserved for window changer mechanism to be developed Dump Window - 10 atm H 2 O to atm He gas Copper Tail Catcher Shd0 - Iron Inlet and outlet water manifolds 1.8 m Diameter 316L SST Dump Tank 10 atm pressurized water

R. ArnoldCLIC08, CERN, 16 Oct Prompt Energy Deposition - J/cm 3 /hour - Geometry V2 Shd0 - Iron 32 kW total Section View Mid Tank Elevation View Tail Catcher Tail Catcher - Copper 32 kW total Shd1 - Borcrete 0.44 kW total Problem: Shield needs active cooling  T ~ 25 deg C/hour

R. ArnoldCLIC08, CERN, 16 Oct Plan View Elevation View Shd0 - Iron 32 kW total Shd1 - Borcrete 0.44 kW total Air Sump - Air Prompt Energy Deposition - J/cm 3 /hour - Geometry V2 Problem: Shield needs active cooling  T ~ 25 deg C/hour

R. ArnoldCLIC08, CERN, 16 Oct Air Granite Borcrete Iron Muon Spoiler Hall Dump Hall Plan View Prompt Energy Deposition - J/cm 3 /hour - Geometry V2 Water Air  T ~ 2 deg C/hour Even the rocks get hot!

R. ArnoldCLIC08, CERN, 16 Oct Neutron Fluence Plan View Iron Borcrete Air Water Neutrons carry the energy and activation to wide regions in the shielding. Large neutron production and activation in Iron and Copper compared to Borcrete

R. ArnoldCLIC08, CERN, 16 Oct Neutron-Gamma One-Way Fluence Tank --> Shd0 --> Shd1 Dominant source flux is photo-produced isotropic Giant Resonance neutrons Neutrons By ~10 2 GR neutron flux down-shifted to thermal energy in water and shield Photons by ~10 4 Flux reduction in Shd0 Iron Photons are effectively absorbed but neutrons get through. EMFCUT in Fluka no neutrons photo- produced below here

R. ArnoldCLIC08, CERN, 16 Oct Prompt Energy Deposition - J/cm 3 /hour - Shd0 Borcrete Air Granite Borcrete Air Borcrete shielding would be easier than iron to construct in modular sections with embedded water cooling. Larger prompt and activation dose in Dump Hall compared to Iron, but may be acceptable. Needs more study.

R. ArnoldCLIC08, CERN, 16 Oct Activation Decay Radiation - 8 h Cool Down -  Sv/h Dump Hall and Muon Spoiler Hall Beamline and Tank front window Plan View Air Iron 10  Sv = 1 mrem 1 to 10 mrem/h Radiation Area Access Controlled Less than 1 mrem/h Accessible < 100 Rad/h High Radiation Area Humans don’t go here < 10 Rad/h High Radiation Area Iron Shd0 and 316L SST Tank are highly activated

R. ArnoldCLIC08, CERN, 16 Oct Activation Decay Radiation - 4m Cool Down -  Sv/h Dump Hall and Muon Spoiler Hall Beamline and Tank front window Plan View Air Iron 1 to 10 mrem/h Radiation Area Access Controlled Less than 1 mrem/h Accessible < 100 Rad/h High Radiation Area Humans don’t go here < 10 Rad/h High Radiation Area Iron Shd0 and 316L SST Tank are highly activated with long decay life. 10  Sv = 1 mrem

R. ArnoldCLIC08, CERN, 16 Oct Preliminary Conclusions from SLAC-BARC ILC Dump Work In Progress  Sweep radius and maximum heat density in water Sweep radius of 6 to 9 cm is required to keep maximum  T at 40 to 45 deg C. RDR plan for 100 m path, 3 cm radius not adequate, needs stronger magnets or longer extraction line to the dump -- more costly.  Water flow volume and velocity required to remove 18 MW while keeping maximum temperature below 180 deg C can be achieved. Water speed ~1.5 to 2 m/s; mass rate ~ 150 kg/s. Inlet temperature ~ 50 deg C, Maximum temperature <~150 deg C. Two-loop cooling systems can be used to reduce costs and complexity. Details of headers, tank design, optimum beam location need more work.  Dump shielding must surround the tank to contain heat and radiation. 50 cm Iron + ~200 cm Borcrete is about right, needs optimization. Presents problems for access, maintenance and inspection. Shielding absorbs 35 to 40 kW and must be actively cooled. Optimum size, material, configuration (access tunnels?) needs more work. Window area is highly activated. Inspection and change requires remote handling.

R. ArnoldCLIC08, CERN, 16 Oct Implications Of This Work For CLIC Dumps Large disruption causing very wide momentum spread for electrons and positrons and the large photon flux at CLIC will make it difficult to contain extracted extracted beams into well shielded dumps. The large beam power and large disrupted beam flux would lead to high values for heat and radiation load in the extraction beam line, and could cause unwanted background at the IP. Extraction line and beam dumps at CLIC will be a challenge, and investigations of realistic arrangements are needed to determine the best options.