Concerto II Green Solar Cities Salzburg. Stadtumbau Lehen – Green Solar Cities  Increase the energy efficiency  About 400 new appartments, Kindergarten,

Slides:



Advertisements
Similar presentations
GREEN PAPER "TOWARDS A NEW CULTURE FOR URBAN MOBILITY" EUROPEAN COMMISSION.
Advertisements

22 AUGUST 2013 WORKING WITH ENERGY IN CHINA 1 Working with energy in China Mogens Heering, Senior VP, COWI CMC Zhang Penghao, Market Director, COWI China.
Produced by Empa IEA ECBCS Annex 50 Prefab Retrofit of Buildings Folie 1 Prefabricated Systems for Low Energy / High Comfort Building Renewal Project Presentation.
SUSTAINABLE REGENERATION OF URBAN AREAS Ilse Rijneveld Pauline van Gijn City of Delft 15 th November 2012.
Longju Model Sustainable Village Guanghan, China John W. Spears International Center for Sustainable Development Gaithersburg, Maryland, USA.
CONCERTO; Milton Keynes Sustainable Residential Quarter
Budapest October 2, 2014 Irina Kotliar Energy efficiency in buildings. European support schemes.
Energy storage Prof Phil Banfill Urban Energy Research Group OCTES workshop, 31 st October 2012.
Aalto PRO Aalto University Continuing Education Värikoodi tähän päälle Ana Rodriguez-Gabriel, ENEF ENEF project: objectives, partners, milestones.
SORCER Coordinators meeting. November 14, SORCER Stimulating Obtaining Results in Communities in relation to Energy- efficiency and Renewables Integrated.
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP 1 Progress.
SOLUTION is a project of the CONCERTO initiative co-funded by the European Commission under the 7 th Framework Programme.
Presentation SOLANOVA, January 2003 Department of Building Energetics and Service Systems Department of Energetics and Energy Systems Budapest University.
Energy Environment & Sustainable Development Thematic Network on Energy in the Built Environment Thematic group 5 : Building Components (including windows.
Concerto II Green Solar Cities. 2 Concerto II: SIR Non-profit organisation All communities of Salzburg are members Competence in: urban planning/ geografic.
INTERNATIONAL ENERGY AGENCY District Heating and Cooling, including the integration of CHP INTERNATIONAL ENERGY AGENCY District Heating and Cooling, including.
ENERGY EFFICIENCY IN INDUSTRY: TRENDS AND PROGRAMS IN AUSTRIA.
MODEL HOME 2020_PAA/December2010 SERVICECENTER. MODEL HOME 2020_PAA/December2010 MODEL HOME 2020 VELUX has launched the project Model Home It is.
National Framework for Sustainable urban development 2014 – 2020 January We invest in.
1 A tool for economical and social development. 2 Time Distance 3 to 5 hours 2 to 3 hours 1 to 3 hours 30 minutes to 1.
© Fraunhofer ISE 2015 Headquarter of Fraunhofer ISE, Freiburg, Germany The Leading Role of Cities: The Frankfurt Energy Scenario Gerhard Stryi-Hipp Coordinator.
Cenergia Energy Consultants The EU CONCERTO project Class1 - Demonstrating cost-effective low energy buildings Ove Mørck, Cenergia Energy Consultants CONCERTO.
© Fraunhofer IBP Auf Wissen bauen Optimised Performance of Energy Supply Systems with Exergy Principles - LowEx Communities Fraunhofer Institute for Building.
Mercè Griera i Fisa Smart Cities & Sustainability DG CONNECT – European Commission Smart Cities & Communities.
. PIMES project funded by ConcertoIII “Complex reconstruction and local energy production” Dr. Károly Matolcsy ÉMI Nonprofit Kft. PIME’S receives funding.
Annex 9 Learning from Green German Institutions and Enterprises By Ms Nannette Arbon Presented during the Monitoring and Replanning Meeting (MRM) 22 August.
Copyright 2003 SolarQuest® Workshop Scientific and Technological Development in the Americas The Importance of Renewable Energy for the Region / Photovoltaic.
Development of the 3D architectural model Project Manager – Low Carbon Communities.
Management Of Domains related to Energy in Local Authorities/ Managementul domeniului energetic la nivel local (MODEL) MODEL Award Competition 2009.
ACTP und ECTP DI Zillner Theodor Energy and Environmental Technologies.
G E O T H E R M A L C O M M U N I T I E S An FP7 CONCERTO project.
Sustainable energy consumption system in the city of Kherson Skopje 2011 Andrii Barulin Municipal energy service company in the city of Kherson Local Environmental.
SOLUTION is a project of the CONCERTO initiative co-funded by the European Commission under the 7 th Framework Programme.
Green Building Creating sustainable and high performance buildings.
SORCER Coordinators meeting. October 22, SORCER Stimulating Obtaining Results in Communities in relation to Energy- efficiency and Renewables Integrated.
1 Can there be a truly Green Building or Eco-city without a Data-based approach? QINGPENG WEI, Ph.D. Building Energy Research Center Tsinghua University,
Center Update Eileen Peppard Center for Smart Building and Community Design.
1 1 Sustainable Energy for communities RENAISSANCE Concerto Coordinators’ meeting – 22 Oct Sylvain Koch-Mathian CONCERTO - RENAISSANCE project Coordinator.
Elaboration of Smart City Indicators System as a Guideline and a Common Framework for Implementation of Smart City Initiatives in the APEC Region 46th.
Reto M. Hummelshøj Project coordinator 1 22 OCT ECO-CITY STATUS 2012 Coordinators meeting Brussels Oct
Staccato is a project of the concerto initiative co- funded by the European Commission under the Sixth Framework Programme.This publication reflects only.
1 CYBER Display Intelligent Energy Europe - Project N. IEE ° September 2007, Bristol Marco Caponigro Project part financed by the European Union.
Renewable Energy and Building Exhibitions in Cities of enlarged Europe Sofia Energy Agency - SOFENA REBECEE, Cluster Meeting, 4-6 February 2009, The Hague.
Role of the Fund in supporting ENERGY EFFICIENCY AND RENEWABLE ENERGY SOURCES PROJECTS in Croatia - general informations REPUBLIC OF CROATIA ENVIRONMENTAL.
Energy Energy Efficiency in buildings Linn Johnsen DG ENER – C3 Policy Officer HORIZON 2020 THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND INNOVATION.
Engaging Stakeholders in Dialogue Challenges And Achievements London Renewable Energy Conference 11/10/02.
«La Spezia 20.20: the city becomes Smart». La Spezia Projects and plan developed 2 Strategic Plans: the first started in 1999 and the second in.
Integrated Water and Energy Efficient Solutions for Urban Water 2/11/2015 Henrik Werchmeister.
Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14 Solar Thermal in major renovations and protected urban.
Stadtwerke Crailsheim GmbH MUSEC-Crailsheim State of the work in WP 2 Thomas Pauschinger Steinbeis Research Institute for Solar and Sustainable Thermal.
FP7 SmartCities READY. Participating Cities VäxjöDemonstration Aarhus, DenmarkDemonstration Kaunas, LithuaniaObservation Project duration: 60 months Expected.
Turin Final Conference 25 September 2014 Work Group 1 Cordelia Koenig Ministry of Urban Development and Environment Hamburg Turin Final Conference 25 September.
How IT Transition can feed green growth and energy transition through innovation 25th MAY, 2016 Masaaki Yamamoto New Energy and Industrial Technology Development.
11 Measures to support high- efficiency district heating and cogeneration Anders Hasselager Senior Policy Advisor Kiev, 19 May 2016.
Group 3 Pauli Autio Antti Kuusiniemi Tuomas Nuutilainen Genku Kayo Salla Jäntti Energy Networks in Otaniemi Topic of the day Our target Ongoing plan by.
Public Participation in the SEA of Master Plan of Yerevan City in Armenia Sona Ayvazyan, Team Leader UNDP Pilot SEA Project as the Capacity Building Tool.
Werner Weiss AEE - Institute for Sustainable Technologies (AEE INTEC) A-8200 Gleisdorf, Feldgasse 19 AUSTRIA SOLTRAIN Targets and Results.
Staccato is a project of the concerto initiative co- funded by the European Commission under the Sixth Framework Programme.This publication reflects only.
Architecture Supported by:
Novel sustainability assessment procedure for smart cities
Implementation of energy strategies in communities
Monitoring of sdgs indicators in the Russian federation
En.občina & En.management 017 Ljubljana, 12. oktober 2017 
Abbey Creative Quarter Update September 2016
Organized by MAFF-NSSU Supported by ADB-TA8163
Abuja Housing Show 18th July, 2018
Architecture Project Creating a Smart City.
ZERO EMISSIONS BUILDING PLAN IMPLEMENTATION UPDATE
FROM DATA TO INFORMATION TO KNOWLEDGE
(6-8 November 2018, Beijing, China)
Presentation transcript:

Concerto II Green Solar Cities Salzburg

Stadtumbau Lehen – Green Solar Cities  Increase the energy efficiency  About 400 new appartments, Kindergarten, Hotel, offices and labors  2000m² thermal solar collectors with l puffertank  Development of an intelligent energy monitoring  Total sustainable renovation  Socio economic issues and participation  Quality insurance and dissemination Several projects change the city district Lehen

Kopenhagen (Valby) and Salzburg Cooperations in technical and political questions Option area 1 Option area 2 New built area retrofit area

è 1) Demoprojects è 2) Research and innovative technologies è 3) Dissemination and Documentation è 4) Cooperations

1) Demo Projects Stadtwerk Lehen Wohnbauteil: Gswb, HÖ 290 social apartments, Kindergarten, Student dormitory, cafe, gallerie Building Phase: October 2009 – November 2011

Demo Projects Stadtwerk Lehen commercial area: Prisma Hotel, renovation high rised building, offices, seminar-rooms and labors, „Volkshochschule“, Restaurant in the Frey-Villa Building start: H3 und H4 late autumn 2011

Passivhaus Esshaverstraße „Die Salzburg“ finished Juni 2008 Monitoringphase Detailled registration of all energy needs and in 3 appartments inclusive himidity and windows. 1st heating periode with some problems Continue till spring 2012

Neue Mitte Lehen „Die Salzburg“ Finished in Nov social appartments 140m² thermal solar plant

Neue Mitte Lehen

Siebenstätterstraße – Parklife “Die Salzburg” Former industrial area Senior residence with 90 Beds 32 apartments for elderly people, 56 social dwellings – building start march 2010 Finished in summer 2012

Renovation Lehner Hof: design phase Historical protected building Kuenburggasse: Thermal renovation finished Connected to district heating

Renovation Strubergasse: 22 houses with 483 apartments: Study for a total sustainable and energetic renovation

RTD - workinggroups 1.Energy – solar & micro net 2.Energy – PV & electro efficiency 3.Renovation Strubergassensiedlung 4.Urban areas, participation und Quartiersmanagement 5.Planning of the green areas 6. Intelligent Energy monitoring

Solar & micro net m² thermal collector with integrated heat pump Steinbeis simulation and report finished

Intelligent E-Monitoring Aims: - optimise the heating systems - influence the user behavior Working group „intelligent E-Monitoring Recherche of existing systems 60 test appartments

Community action plan Local info point First activities with neighbours

Dissemination

4) Cooperation è Solarconferenz in Copenhagen Nov 07 è International Symposium Stadt im Umbau Salzburg Okt 08 è Excursion of a danish housing association to Salzburg Mai 09 è Partnermeeting in Kopenhagen Mai 09 è Excursion of 25 danish architects to Salzburg Sept 09 è Internat. Renovation Symposium in NL Okt 09 è Visite of a danish representative from ministry of environment to get know how about implemention of E-point system è Excursion of Salzburg Experts to Kopenhagen and Malmö July 2010 è Excursion of danish architcts to Lehen in Sept.11

Qualitätssicherung Steering group

Quality control Quality check in autumn 09

Thermografic controll

Thank you for your attention