IMO Audit Findings - IT’s. As per Market Rules, IT’s must be Measurement Canada approved or operating under Measurement Canada Temporary Permit - which.

Slides:



Advertisements
Similar presentations
Pilot Instructor Currency
Advertisements

NERC ERO Specifics for WECC Regional Differences in Reliability Standards Delegation of Compliance Enforcement ERO Budgets and Funding Paul Barber 1.
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
CVPS wetland review Presented by Central Vermont Public Service Corporation Vermont Water Resources Panel September 7, 2006.
Revenue Metering. 2 The Settlements Process Transfer Funds $ $ Invoice Participants Reconcile Markets Gather and Process Metering Data.
 E4 Electrical Installation #1 Power Distribution.
CONFIDENTIAL DRAFT Modernization of Approvals Project Update July, 2010.
Advanced Financial Accounting. Accounting theory n The Financial Accounting Environment AccountingTheoryPoliticalFactorsEconomicConditions Accounting.
Unit Transformer Unit transformer are step up transformer which is connected to generating house & step up voltage from 15kV voltage to 132 voltage level.
Blondel Compliance. Update to IMO Wholesale Revenue Metering Standard V2.0 Section Considerations for non-Blondel Meter Installations a. 3 CT’s.
HV Field Testing and CCVT Re-verification December 2013.
Renewables Portfolio Standard: Progress and Perspectives Aaron J. Johnson Director, Renewable Energy Policy & Strategy February 1, 2011.
Manitoba Provincial Nominee Program Employer Direct Stream.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Terminal Reporting Changes Meeting.
Connections of a CT and a PT to supply, load and relay.
Provident Energy Management Inc. Electrical Deregulation Presentation for DEL Property Management Inc. Proud Members: Continental Automated Building Association,
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Provident Energy Management Inc. Electrical Deregulation Presentation for DEL Property Management Inc. Proud Members: Continental Automated Building Association,
1 Service Delivery Point(s) for Multi-tenant Facilities An Overview Matt Imel Sr. Tariff Specialist PG&E December 8, 2011.
Market Operations Standing Committee of the IMO Market Operations Standing Committee September 22, 2003.
PTS 2.3 C Portable Test System Page 1 March 2009.
© Grant Thornton Setting up a Distribution Business in Mexico: Considerations for U.S. and Foreign Investors Andrew Speer Grant Thornton LLP.
EPA Groundwater Rule 40 CFR Parts and 142. Reasons for the Groundwater Rule  To protect public health due to viruses and other bacterial exposure.
January 29, 2014 MWG Meeting Topics for Discussion.
1 Compliance Rates as They Relate to Strategic Directive 4 and 8 Landfill Management and Enforcement Permitting.
January 14, 2016 MWG Meeting. Topics for discussion: 1.) ERCOT Anti-Trust Admonition (D. Sumbera)9:30 – 9:35 2.) Attendance roll-call and introduction.
Measurement Error Correction (MEC)  Voltage transformers (VTs) and current transformers (CTs) that do not meet the 0.3 Accuracy Class of IEEE Std C57.13.
Presentation by Gunnar A. Knudsen Manager, Ports and Terminals Section INTERTANKO for The Intermodal Petroleum Transportation Security Conference London,
IMO Compliance Process. Compliance Market Rules and Standards Chapter 3: Empowers and obligates IMO “Enforcement” Section 6.1.1: “monitor, assess and.
Market Operations Standing Committee of the IMO Market Operations Standing Committee June 3, 2003.
E. Follow-up discussion on Parallel CT clarification per SMOG (e) (H. Perez) SMOG (e) Paralleling of Current Transformers – Connected burden.
Copyright & Distance Education Copyright © 2003 by Pearson Education, Inc. All rights reserved.
Public Hearings January 26, Case: CDR Project: Lakeside Village Center South PD / LUP Applicant: Dennis Seliga, Boyd Development Corporation.
15 Jul 2003Market Operations Standing Committee of the IMO1 Treatment of Combined Cycle Generation and Related Aggregation Issues (MR-00121) John MacKenzie.
Regulatory Labeling and Marketing. Which ones are involved in label design and control? Manufacturing Manufacturing Quality Assurance Quality Assurance.
Field Problems with Instrument Transformer Installations
3 Dec 2003Market Operations Standing Committee1 Change Management: Market Rules Update John MacKenzie.
Wholesale Revenue Metering Standard - Hardware November 2003.
4 Starting Tips to Keep Your Car in Top Condition
Nodal COMS Additional Items Update
TOPIC: TRANSFORMER-BASICS ENROLLMENT NO:
Portable Working Standard
Power Generation and Distribution
PTS 3.3 C Portable Test System.
Mooring Rights & Rules JBMI Board Meeting 6/20/17.
Technical Assurance Agent
BACKFLOW MANAGEMENT INC
Open circuit Test and Short circuit Test
Environmental Communication and Marketing
Bill Banks | Security Engineer
Hazardous Areas & Hazards of Electricity
Pipeline and Terminal Reporting Changes Meeting February 11, 2004
Advanced Financial Accounting
BOARDS ASKED… Does your board have a statute of limitations after which minor violations are no longer displayed or available to the public?
برنامه‌ريزي منابع انساني
Electric Meter Identification
AIR PERMITTING GUIDANCE
ELC 200 Day 6 Exam Day © 2017 Cengage Learning®. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part,
Minnesota Energy Resources Danny Quint Compliance Supervisor
Measurement Canada Seal Period Reduction of Ultrasonic Meters
Versioning of MV90 Master Files
THE NORMAL DISTRIBUTION AND THE 68–95–99.7% RULE
Trust Your Data With Data Quality Services
Body of Knowledge The Principals: TTM must be Consistent throughout NZ
John Deere WorkSight ™ New C&F Tiered Pricing April 2015
Mooring Rights & Rules JBMI Board Meeting 6/20/17.
Major PAR form questions
Toolik Field Station – 2018 Annual Meeting – February 2018
IMO Audit Findings - IT’s
Presentation transcript:

IMO Audit Findings - IT’s

As per Market Rules, IT’s must be Measurement Canada approved or operating under Measurement Canada Temporary Permit - which expires May 1, 2004 IT’s must be operating on the MC approved tap and within the burden and rating factor limits Number of installations consisting of MC approved IT’s but not operating on the MC approved tap. IT’s listed on MC Temp Permit. Number of installations have non MC approved IT’s and are not listed on the MC Temporary Permit. Subject to compliance.

IMO Audit Findings - IT’s Meter installation consists of distribution transformers for VT’s (non MC approved and no accuracy rating). –May or may not be on MC Temp Permit –In some cases, distribution transformers are also used as station service transformers. Auto transformers used in CT circuits of some meter installations. Unable to determine IT accuracy in some cases.