ERCOT PUBLIC November RPG Meeting 1 2016 RTP – Study Scope November 20, 2015.

Slides:



Advertisements
Similar presentations
RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
Advertisements

March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Regional Planning Group Project
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
2015 RTP Update January, 2015.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
ERCOT PUBLIC 10/21/ RTP Scope and Process Review October 21, 2014.
ERCOT PUBLIC 10/21/ LTSA Update October 21, 2014.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Houston Area Dynamic Reactive Project March 11,
Oncor Electric Delivery Company LLC Smart Grid Demonstration Project – Dynamic Line Rating (DLR) June 25, 2010 Justin Johnson ERCOT Reliability Operations.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Peak RCCo Performance Metrics Draft –November 2013.
1 Local Area Planning Update to TRANSAC – March 11, 2015.
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
RPG Meeting Five Year Plan Extension Brad Schwarz.
Engineering a sustainable future 1 ERCOT Voltage Ride-Through Study Workshop June 26 th, 2009.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions-Updated April 22, 2014.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions May 20, 2014.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
ERCOT PUBLIC 4/22/ RTP Inputs and Assumptions April 22, 2014.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Joint PLWG/CMWG Assignment Update to ROS September 15, 2011.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
Transition Plan Network Operations Model Change Requests 5/26/2010.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Response to TAC Questions on PGRR031 TAC– January 28, 2014 Jeff Billo, ERCOT 1.
Generation Adequacy Task Force Meeting April 10, 2014.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
1 ERCOT 2015 West Texas Study November 18, 2014 Jeff Billo.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
Subsynchronous Resonance Update Jeff Billo, Senior Manager ERCOT Transmission Planning February 3, 2016 Wholesale Market Subcommittee 1ERCOT Public.
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Freeport Area Master Plan Project -
Modeled Load Levels in the Valley
2016 RTP Update June, 2016 RPG Meeting.
Transmission Planning in ERCOT- Overview
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
ERCOT 2009 Five-Year Transmission Plan Update
August 25, 2016 TAC Update to COPS
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Study Scope - Quarterly Stability Assessment
Presentation transcript:

ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015

ERCOT PUBLIC November RPG Meeting 2 Outline  Updates to the RTP Scope  Comments and Feedback  Next steps

ERCOT PUBLIC November RPG Meeting 3 Summary of updates to the 2016 RTP Scope  Study years: In 2016 RTP summer peak conditions for year 2 (2018), 3 (2019), 5 (2021) and 6 (2022) will be studied  Hydro Generation dispatch: Hydro-electric Generation Resources in the reliability cases are dispatched up to the Hydro Unit Capacity as defined in Protocol Section , Total Capacity Estimate  Wind (WGR) and Solar (PVGR) Generation dispatch outside the study region: For a WGR, the maximum Dispatch level is the Seasonal Peak Average Wind Capacity as a Percent of Installed Capacity as defined in Protocol Section , Total Capacity Estimate. For a PVGR, the maximum Dispatch level is the Solar Unit Capacity as defined in Protocol Section , Total Capacity Estimate.

ERCOT PUBLIC November RPG Meeting 4 Summary of comments  Load levels used in RTP cases and methodology used to address load-gen imbalance  The 300 MW/100 MW threshold used to screen critical contingencies in the multiple element outage study  Generation dispatch in the off peak case

ERCOT PUBLIC November RPG Meeting 5 Next Steps Case conditioning Initial start cases, and contingency list ready Set 1 (P1, P7), Set 2 (P2, P4, P5) contingency analysis for the base cases Set 1 (P1, P7), Set 2 (P2, P4, P5) contingency analysis for the base cases Set 3* (P3: G-1+N-1, part of P6: X-1+N-1) contingency analysis for the base cases Other reliability studies (e.g. sensitivity, short circuit, cascading, multiple element outage (P6, EE), long-lead time equipment, constraint management plan, etc.) Other reliability studies (e.g. sensitivity, short circuit, cascading, multiple element outage (P6, EE), long-lead time equipment, constraint management plan, etc.) Economic case preparation and analysis 2016 RTP Report Green box: Complete Yellow box: In progress

ERCOT PUBLIC November RPG Meeting RTP Next Steps  Request Stakeholders to provide comments on the RTP Scope by December  Address comments and finalize the 2016 RTP Scope  2016 RTP Initial case preparation will begin using October 2015 SSWG Cases  Seek TSP feedback regarding the following Tier I, II and III projects which are pending ERCOT Independent review and need to be backed out of the Start Cases Confirmation of the dynamically rated equipment to be used in Reliability Analysis List of FACTs devices not configured to provide steady-state voltage support List of long lead time equipment  Prepare 2016 RTP start cases based on the 2016 RTP Scope

ERCOT PUBLIC November RPG Meeting 7 Questions? Sandeep Borkar Sun Wook Kang