cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.

Slides:



Advertisements
Similar presentations
COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
Advertisements

CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
Time Varying Structural Behaviour of the PETS “On-Off” mechanism piston movement impact Riku Raatikainen
TMM of the CLIC Two-Beam Module T0 in the LAB – Proceedings to structural FEA Riku Raatikainen
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
Influence of the Gravity, Vacuum and RF on CLIC Module T0 Behavior R. Raatikainen.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
30 GHz waveguide line modification towards 12 GHz.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
2nd CLIC Advisory Committee (CLIC-ACE), CERN January 2008 Introduction to the CLIC Power Extraction and Transfer Structure (PETS) Design. I. Syratchev.
CLEX TBM T0 Cooling system Progress Report 1 V. Soldatov, A. Vamvakas, BE-RF
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
Status of the activities on vacuum system C. Garion TBMWG, 20/06/2012.
18/04/12 Arnaud ACKER Mechanical Analysis of RF Network 1/14 CLIC Two-Beam Module type 0.RF Network. Drive-Beam Main-Beam.
CTC, Outcome from Two-beam Module Review on15/ G. Riddone,
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
CLIC two-beam modules TEST modules final schemes Dmitry Gudkov BE/RF CLIC Module Working Group.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
cern.ch International Workshop on Linear Colliders 2010 CLIC TWO-BEAM MODULE DESIGN & INTEGRATION 21-Oct-2010 WG 8 «TECHNICAL SYSTEMS»
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
TBTS Test Program & Schedule G. Riddone
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
CLIC meeting CLIC module status G. Riddone on behalf of the CLIC Module WG,
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
Risto Nousiainen, CLIC workshop ” Technical Issues, Integration & Cost ” working group Progress on Study of Module Cooling Risto Nousiainen.
CLEX TBM T0 Cooling system Design strategy 1 V. Soldatov, A. Vamvakas, BE-RF
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
Dmitry Gudkov Phase correction of the CLIC TBM in CLEX Dmitry Gudkov Wilfrid Farabolini.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
GOLD- ELECTROPLATING COOLING FITTING ADAPTER ACCELERATING STRUCTURE CONCEPTUAL DESIGN OF X-BAND ACCELERATING STRUCTURE TD26 CC SIC Abstract Many accelerating.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
Two-beam module layout
LCWS11 WG4 Fully featured accelerating structure engineering design
CLIC Parameter Working Group Two Beam Module Design
Update on the DB Girders FE Analyses
RF-kick in the CLIC accelerating structures
TEST MODULE WG Cradles for CLIC module supporting system
CLIC module working group
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
The path to a new CLIC main-linac module
List of changes and improvements for the next generation CLIC module
LCWS 2017 – 26th October C. Rossi
TM0s and TM1 components inventory and procurement schedule
Presentation transcript:

cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1

cern.ch Many issues appear often during integration ! CLIC TWO-BEAM MODULE SYSTEMS The baseline solutions were defined for each technical system and a solution for CDR is available The module design and integration has to cope with challenging requirements from different technical systems. 2 SYSTEMREQUIREMENT/S R FAS shape tolerance ± 2.5 µm INSTRUMENTATION BPM resolution: MB - 50 nm, DB – 2 µm, temporal - 10 ns (MB & DB), SUPPORTING Max. vertical & lateral deformation of the girders in loaded condition 10μm COOLING~400 W per AS MAGNET & POWERING DB T/m, current density: 4.8 A/mm2, MB 200 T/m PRE-ALIGNMENT & STABILIZATION active pre-alignment ± 10 µm at 1σ, MB Q stabilization 1 nm >1Hz VACUUM10 -9 mbar ASSEMBLY, TRANSPORT, INSTALLATION same transverse interconnection plane for DB & MB

cern.ch CLIC TWO-BEAM MODULE SYSTEMS 3 It is impossible to separate the components and consider them as a system-belonging part. We are about module integrated sub-units. COOLING R F MAGNET & POWERING ASSEMBLY, TRANSPORT, INSTALLATION SUPPORTING VACUUM PRE-ALIGNMENT & STABILIZATION INSTRUMENTATION... “BPM – DBQ - PETS IC” “IC – BPM – MBQ – Dipole Corr. - IC” “PETS - RF NET - AS” “Girder - Pos. System - Stabiliz. System - Structure Support” CLIC TWO-BEAM MODULE

cern.ch MB ~1 A DB 100 A CLIC MODULE TYPE 1 ( BASELINE FOR CDR ) 4 MB QUAD ACCEL. STRUCTURE (BRAZED DISKS) VAC ION PUMP REF. SPHERE ALIGNMENT SYSTEM BEAM INSTRUMENTATION DB QUAD COOLING CIRCUIT RF LOAD PETS ( OCTANTS, MINI-TANK ) PETS ON-OFF MECHANISM MB Q SUPPORT & STABILIZATION CRADLE COMPACT COUPLER VAC. MANIFOLDS

cern.ch MODULE TYPES 5 + special modules (damping region, modules with instrumentation and/or vacuum equipment) to be studied in TDR phase CLIC Module Type1 154 per Linac CLIC Module Type1 154 per Linac 1 pair of AS replaced by MB Quadrupole Standard Module (L=2010 mm) DB (100 A) 4 PETS, 2 Quads with BPM Each PETS feeds 2 AS MB (1 A) 8 acc. structures MB filling factor: 91% Standard Module (L=2010 mm) DB (100 A) 4 PETS, 2 Quads with BPM Each PETS feeds 2 AS MB (1 A) 8 acc. structures MB filling factor: 91% Standard Module 8374 per Linac Standard Module 8374 per Linac Module Type per Linac Module Type per Linac Module Type per Linac Module Type per Linac Module Type per Linac Module Type per Linac

cern.ch Detailed design to be optimized for TDR COMPLEXITY Brazed disks with “compact” coupler & vacuum system, micro-precision assembly, cooling circuits (~400 W per AS) wakefield monitor (1 WFM per SAS), interconnection to MB Q (stabilization!) structure support (alignment), output WG with RF components (e.g. loads) RF distribution (WGs & splitters) COMPLEXITY Brazed disks with “compact” coupler & vacuum system, micro-precision assembly, cooling circuits (~400 W per AS) wakefield monitor (1 WFM per SAS), interconnection to MB Q (stabilization!) structure support (alignment), output WG with RF components (e.g. loads) RF distribution (WGs & splitters) ACCELERATING STRUCTURE 6 The design of AS is driven by extreme performance requirements. The assembly accuracy is ±5 µm. Many features of different systems, such as vacuum, cooling, WFM as well as damping waveguide absorbers are incorporated into design. WFM Schematic layout of CLIC Module Super-AS A S S u p e r - A S AS with WFM  Validation in CLEX (2011) Collaboration with CEA-Saclay AS with WFM  Validation in CLEX (2011) Collaboration with CEA-Saclay

cern.ch PETS DESIGN & INTEGRATION The PETS are composed of eight bars milled with mm shape accuracy. The octants assembly, mini-tank, “ON-OFF” mechanism combined with compact coupler, vacuum system, cooling circuits and interconnection are the subject for design and integration study. 7

cern.ch RF NETWORK LAYOUT The CLIC two-beam RF network includes the standard X-band rectangular waveguides connecting PETS, AS and other supplementary devices such as choke-mode flange (CMF), Hybrid, high-power load, splitter and WFM. 8 Requirements: tolerance on RF phase change between DB and MB: ± 0.12 deg WG interconnections between PETS and AS via CMF: X – shift: ± 0.25 mm, Y ± 0.5 mm, Z ± 0.5 mm, Twist: < 5 ° Waveguide length optimization is based on losses, phase advance and RF to beam timing considerations. The power transmission without electrical contact between two beams, and also MB and DB independent alignment is getting possible with CMF. The Hybrid provides the power to two adjacent AS. The RF load is attached to one of the hybrid ports to avoid the RF reflection to the corresponding PETS. The RF splitters are used to equally feed the AS. Longitudinal cut-out of CMF

cern.ch MB Quadrupole Nominal Gradient: 200 T/m Magnet aperture: Ø10 mm MB Quadrupole Nominal Gradient: 200 T/m Magnet aperture: Ø10 mm Baseline: classical electro-magnetic design (MB) IC – BPM – Vac. Chamber – Dipole – IC 9 MB: the beam pipe is attached to the magnet and must be aligned to the magnetic centre of the Quad with an accuracy better than 30 μm; transverse tolerance for pre-alignment 17 µm at 1σ; stabilization: 1nm >1Hz in vertical & 5nm >1Hz in horizontal direction at 1σ. Longitudinal cut-out of MB Quad region MB BPM res. requirement: 50nm, 10 ns choke type MB BPM res. requirement: 50nm, 10 ns choke type MB BPM DIPOLE CORRECTOR Longitudinal space constrain for BPM and Dipole corrector integration and interconnections. Qty: MB: ~ units VAC. CHAMBER

cern.ch (DB) IC – BPM – Vac. Chamber – IC 10 Drive Beam Quadrupole working gradient: T/m, current density: 4.8 A/mm 2, magnet aperture: Ø23mm Drive Beam Quadrupole working gradient: T/m, current density: 4.8 A/mm 2, magnet aperture: Ø23mm DB: The active length specified is 150 mm. The total number of quads required for both linacs is ~ In current module design the DB Quad vertical size drives the beam height. ALTERNATIVE: DB tuneable permanent magnet solution is under investigation (Cockcroft Institute)

cern.ch ALTERNATIVE DB MAGNET 11 alternative: DB tuneable permanent magnet solution is under investigation (Cockcroft Institute)

cern.ch BASELINE: - interconnected girders form a “snake system” - MB girders are not of the same length - MB Q support interrupts the MB girder - MB Q beam pipe and AS are connected by bellows BASELINE: - interconnected girders form a “snake system” - MB girders are not of the same length - MB Q support interrupts the MB girder - MB Q beam pipe and AS are connected by bellows GIRDERS & POSITIONING SYSTEM 12 requirement : yellow ref. surfaces precision - 2 μm requirement : yellow ref. surfaces precision - 2 μm Max. vertical & lateral deformation of the girders in loaded condition - 10μm The main components of both beams are supported on girders linked to one chain all along the linac. The main components of both beams are supported on girders linked to one chain all along the linac. Lab test setup. B162/R-011

cern.ch VACUUM LAYOUT A low pressure level (10 -9 mbar) is needed for keeping the good beam quality. The interconnections between main components should sustain the vacuum forces, provide an adequate electrical continuity with low impedance and remain flexible not to restrict the alignment. 13 ALTERNATIVE SOLUTION Mini-Pumps fixed directly on each structure. No lateral stress on RF structures. (study  2011) ALTERNATIVE SOLUTION Mini-Pumps fixed directly on each structure. No lateral stress on RF structures. (study  2011) MB AS-AS interconnections

cern.ch CONCLUSIONS The integration steps and model design evolution are shown below. The intermediate 3D model was used for Thermo-Mechanical simulations, which in turn helped us to identify some critical points and introduce necessary changes into the module layout. As an example, one of them is an implementation of sliding supports for RF structures, which allows minor elongation during operation. To lower longitudinal deformation an interconnection should be added between two S-AS. The inter-beam WGs were reinforced in order to reduce their bend. 14 Many issues still exist and will be addressed during TDR phase Dec-2010 Dec-2007 Dec-2009 Dec-2008

cern.ch CLIC MEETING (17-Dec-2010) THANKS FOR YOUR ATTENTION ! 15