Carbon filter review-September 2003 FEA parameters Design1 h=15000 W/mK 2600W in volume as from Steve Marks and 70mm x 3.5mm beam Footprint. Contact assured.

Slides:



Advertisements
Similar presentations
VELO Status at Liverpool T. Bowcock. Prototype Module(1) Mechanical Design Several different options Reduce complexity Dead reckoning.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Ss Hefei, China July 19, 2011 Nuclear, Plasma, and Radiological Engineering Center for Plasma-Material Interactions Contact: Flowing.
Rosier Ph. – IPNO – Detector Dpt. – 27/05/2011APRIME HPS collaboration meeting 1/24 1- Vacuum chamber proposal 1.1- Stainless steel chamber design and.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Analysis of Simple Cases in Heat Transfer P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Gaining Experience !!!
Heads Under Pressure Snowmobile Head Design Team Members: Peter Britanyak, Nick Harker, and Chris Tockey.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
EML 4551C SENIOR DESIGN DR. KAMAL AMIN TEAM 4: ALTERATE MATERIAL SELECTION FOR COMPRESSOR CASING IN TURBOCHARGER DESIGN REVIEW PRESENTATION GROUP MEMBERS.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
NEWS  Internal Review  November 20  Presentation covering most of the relevant L4 WBS activities: rf shielding, substrate,Vacuum vessel, Position control.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Ernie Ihloff 21 May 08 Preliminary Heat Shield Design for nEDM.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Apex Target Marco Oriunno, April 23, Design and fabrication by: Marco Oriunno, Dieter Walz, Jim McDonald, Clive Field, Douglas Higginbotham, and.
1 THERMAL CONDUCTIVITY OF SILICATE BONDED SAMPLES Status of measurements with the thermal conductivity facility in Firenze June, 7 th 2007.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
Summary of This Week’s Lab
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012.
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
AAE450 Spring 2009 Lander Phase: Hybrid Propulsion System Propellant Tank Sizing and Pressure Analysis Thermodynamic analysis on Hydrogen peroxide Tanks.
September 19, 2008Wes Craddock1 SiD SUPERCONDUCTING MAGNET / SUPERCONDUCTING CABLE Wes Craddock Boulder, Colorado 18 September 2008 CMS WINDING PACK.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
Spacing of Cu clamp = 10” Clamp plate width = 2.5”, thickness = 0.375” Thickness of conductor insulation = 0.03” Thickness of coil ground wrap = 0.03”
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Wayne, The upper and lower guides are now small enough in mass so they can be made directly from the CAD models by stereolithography, and at a reasonable.
Pierre Barroca ITK LAPP – Goals 2.Simulation 3.Prototype measurements 4.Setup 5.Results 6.Conclusions 1.Goals 2.Simulation 3.Prototype measurements.
TEM3P Simulation of Be Wall Cavity Tianhuan Luo. Cavity Model Pillbox cavity with Be wall R=0.36 m, f0~319 MHz, L=0.25m (not exactly 325 MHz, but not.
LAPPD Device Processing: Scrubbing, Baking and Sealing Lei Xia.
HL-LHC-UK Thermal Shield Update Niklas Templeton 07/03/2016.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
1 IST development status  Seattle  Composite Design.
SPS High Energy LSS5 Thermal contact & cooling aspects
EuCARD Status: September 2010.
T2K Upgrade First look at TPC constraints (WAGASCI)
The EMC cooling F. Raffaelli INFN - Pisa 06/09/2017.
Quality Control Chamber Production
Strip Petals: Local supports and prototype tests
LARP Phase II Secondary Collimator RC1
Manufacturing of the first FCC-hh beam screen prototype for ANKA
Flexible lines production and planning
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
Status of Questions and Actions from the meeting of 10/2016
Hybrid Mechanical/Thermal Design ideas
XFEL Collimation and Beam Switchyard Vacuum Issues
Tests on a dummy facet of PIX upgrade using CO2 cooling
Presentation transcript:

Carbon filter review-September 2003 FEA parameters Design1 h=15000 W/mK 2600W in volume as from Steve Marks and 70mm x 3.5mm beam Footprint. Contact assured only in 2mm strips top and bottom. Design2 Increased contact area to see what is the result (~8mm contact on each side) Design3 same as design1 but considering the laser heatflux on area total 60W and ppd=3.5W/mm2

Mat Properties APG Alpha x,z=-1E-6 1/K Alpha y=25E-6 1/K Kx,z=1.6W/mmK Ky=.01W/mmK Cu As from Malcolm Howells E=117000MPa nu=.33 Alpha=16.5e-6 1/K K=.398 W/mmK

Laser beam

Design Stainless pusher Copper clamps Carbon filter Aluminum filter support

Cooling tubes Squeezed in groove For easier manufacture Carbon filter Copper clamps Stainless pusher

Testing: and beamlines checked. Power not enough. In touch with Richard Nygren at Sandia National Lab in Albuquerque. Doug Berger at Livermore Lab. Jim Savino at CHESS. Peter Stefan and Tom Rabadeau at Stanford. Interfaces: James Wu. Richard Nygren suggested a japanese version of a supergraphite sheet to improve heat transfer contact (see LHD divertor). Stanford uses GaIn (different environment but possible). Still need to contact Ralph Hipple bldg 58 for vacuum chambers and heaters For pressure and shear testings still need to talk to Dan Dietrich. Test plan: we need to carry out some preliminary tests here at the lab Before using a facility like Livermore Lab or Sandia to do some final tests.

Cost: Testing facilities cost between to dollars per week. We need to think which tests will be more appropriate, in the meantime we will carry out some preliminary tests here (assy and pressure test, contact interface thermal test (?) and contact interface stress test, interface comparison). Schedule: if this review give us the ok, we can start building at least two assys very soon since 90% of detailed dwgs are already done and only few issues need to be addressed. We are probably in need of building some different prototypes for some tests but it shouldn’t take long. Foils: We have 4 free samples of APG from K-Technology Inc. I am still waiting for a quote of the ZYB HOPG from Advanced Ceramics (these will be more expensive foils, flatter than the previous ones, we wanted to have some to compare the results).