February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.

Slides:



Advertisements
Similar presentations
February 17-18, 2010 R&D ERL Andrew Burrill R&D ERL SRF Electron Gun Andrew Burrill February 17-18, 2010 SRF Electron Gun.
Advertisements

Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
February 17-18, 2010 R&D ERL Dmitry Kayran R&D: G5 test and Commissioning Plan Eduard Pozdeyev, Dmitry Kayran BNL R&D ERL Review February 17-18, 2010 R&D.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC Engineering Challenges and Solutions for MeRHIC.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
Workshop on High Average Power & High Brightness Beams UCLA, Los Angeles, CA, November 8 – 10, 2004 D. Kayran, I. Ben-Zvi, D.S. Barton, D. Beavis, M. Blaskiewicz,
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
G5 Design Review, April 24, 2009 Gun to 5cell Cavity Test: Overview Dmitry Kayran G5 test Design Review April,
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
October, 2009 Cost of SRF Components Gary McIntyre October, 2009 Internal Review.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Jefferson Lab Cryomodule Cost and Optimization. Based Jlab energy upgrade Cryomodule design and produced to increase the energy gain of CEBAF to 12 GeV.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
650 MHz Cryomodule -- Discussions at RRCAT October 2010 Tom Peterson, with Harry Carter, Camille Ginsburg, and Jim Kerby 19 Nov 2010.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Status of the M-ECCTD F. Peauger - P. Bosland
CERN – Zanon discussions
WP5 Elliptical cavities
FRIB Cryogenic Support
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
MLC Schedule Plan Proven in-house expertise and infrastructure for fabrication, assembly, and testing cryomodules Confident in our technical expertise.
FFAG Magnets and Girders Meeting
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Electron Source Configuration
IHEP Cryomodule Status
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Experimental equipment Edgar L. Black February 17, 2019
HIE-ISOLDE contribution packages
SNS PPU Cryomodule Instrumentation
Cryomodules Challenges for PERLE
Daresbury ESS In-Kind Contributions
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
SNS-PPU upgrades the existing accelerator structure
SNS PPU Cryomodule Design Overview
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule

February 17-18, 2010 R&D ERL Gary McIntyre ERL Status & Schedule Although important to C-AD, ERL must compete for resources with machine operations – –Sharing resources limits the work that can be performed…  During shutdown periods  Operations maintenance days  Anytime ERL work is in conflict with operations efforts –Best efforts are being made by all ERL-involved groups but schedule slip can and does occur. 2

February 17-18, 2010 R&D ERL Gary McIntyre ERL Status & Schedule 3 Energy Recovery Linac Milestone Schedule 5-Cell Crymodule to Building 91210/17/08 Start of Cold Emissions Testing03/24/09 Gun Cavity begins processing01/25/10 HTSS testing complete03/09/10 Gun cavity string delivered to BNL09/01/10 Gun Cryomodule moved to BLG 91212/17/10 Sub systems connections to e-Gun Cryomodule complete02/22/11 Testing start of Gun to 5-cell Cavity Cold with metal cathode03/15/11 VTF Refrigerator operational03/23/11 Removal of G-5 components and installation of Injection components06/01/11 G-5 with Injection (Zig-Zag) Testing Starts07/18/11 ERL component installation complete & checkout complete 10/24/11 ERL -All Systems- Testing 10/24/11

February 17-18, 2010 R&D ERL Gary McIntyre ERL Status & Schedule The critical path remains the electron gun cavity cryomodule –Steps to complete the cryomodule include:  Cavity processing  Hermetic Cavity String assembly  String installation into e-Gun cryomodule –G-5 (e-Gun to 5 cell Cavity) next major milestone –Followed by the full ERL complete 4 e-Gun cavity with large grain R&D cavity

February 17-18, 2010 R&D ERL Gary McIntyre ERL Status & Schedule Cavity Processing – on going at JLab –Buffered chemical polishing - on-going –Vacuum firing to 600C - complete –High pressure rinsing - on-going –Vertical cold testing at 2K - expected start 02/23/10 5 e-Gun cavity in vacuum furnace (Jefferson Laboratory) Model of e-Gun cavity in Helium Vessel

February 17-18, 2010 R&D ERL Gary McIntyre ERL Status & Schedule 6 e-Gun Cavity Hermetic String Assembly e-Gun cavity in Helium Vessel Cathode side thermal transition Fundamental Power Coupler side thermal transition Assembly/transport cart Tooling design complete – parts of tooling package in fabrication, others in approval loop. All string components in-house or ordered, no negative schedule impact.

February 17-18, 2010 R&D ERL Gary McIntyre ERL Status & Schedule String installation into e-Gun cryomodule –Cathode transporter in house –Installation tooling design start scheduled for 04/2010 –All cryomodule components ordered with no negative schedule impact 7 Ballast tank Cathode transporter Cryomodule vacuum vessel Cathode insertion point & choke joint High temperature SC Solenoid

February 17-18, 2010 R&D ERL Gary McIntyre ERL Schedule 8 Major Milestones  G-5 Testing Requires e-Gun installed in Cryomodule  All major cryomodule components ordered  e-Gun cryogenics lines routing design in process Requires G-5 magnets, instrumentation and vacuum chambers All magnets and stands in-house Installation as time permits Remainder of G-5 vacuum chambers due 04/28/10 Beam instrumentation for G-5 & ERL due 08/26/10 Removal of G-5 “straight” line & install “zig-zag” line Additional testing with this configuration

February 17-18, 2010 R&D ERL Gary McIntyre ERL Status & Schedule 9 G-5 Layout E-Gun & cathode transporter 5-cell cavity with ballast tank

February 17-18, 2010 R&D ERL Gary McIntyre ERL Status & Schedule Complete ERL Installation –Requires removal of G-5 Test components –All Loop magnets, stands, and power supplies in-house –All Loop vacuum chambers in-house –Moveable arc stand in-house. –Magnet stand pre-survey underway. –ERL Dump due 03/26/10 –Loop Beam Instrumentation due 08/26/10 –Staging manpower remains biggest challenge 10

February 17-18, 2010 R&D ERL Gary McIntyre ERL Status & Schedule 11 ERL Layout in Building 912 e-Gun Cryomodule 5-cell Cryomodule ERL Loop ERL Dump 1MW Klystron 1MW IGBT Power Supply Laser Room