MC sign-off and running plans M. Moulson, 1 March 2004 Offline discussion Outline: Results of tests on new MC files Sign-off on production version What.

Slides:



Advertisements
Similar presentations
Status reports/Discussion items S. DellAgnello DC geometry review DC wire sag measurements P. de SimoneDC s-t relations with new sag model S. Miscetti.
Advertisements

Status reports Trigger simulationM. Palutan, B. Sciascia DC GeometryA. Antonelli, S. Dell’Agnello DC wire sag measurementS. Dell’Agnello, C. Forti DC s-t.
Nominal and no CSR (R 56-1 = 55 mm, R 56-2 = 59 mm, R 56-3 = 0) L1 phase = 21 deg, V 3.9 = 55 MV CSR OFF BC3 OFF Elegant Tracking  z1 = mm (post.
KLOE GM Capri May 2003 K charged status report DE/Dx development vs PiD (next talk by E.De Lucia) →K e3 studies: initial design of efficiency measurement.
Update on a 0 (980) P.Gauzzi. 2 Main problem From event counting: Br(  0  ) = (6.70  0.26)  with  Br(  0  ) = (7.22  0.52)  10.
Wing Attack - Plan R or How I learned to stop worrying and love the Monte Carlo 06/06/06.
IBM 1350 Cluster Expansion Doug Johnson Senior Systems Developer.
What can Superbeams and Neutrino Factories Add to Scattering Measurements?
Status report on EMC simulation... Part 3 The plan is to:  SURVEY the existing situation over the runs - Validation of plots using  and.
Work finished M. Antonelli ISR and f decay simulation M. MoulsonBank-reduction code for DST’s M. Palutan et al.Trigger simulation parameters S. GiovannellaGEANFI.
Status of Tracking at DESY Paul Dauncey, Michele Faucci Giannelli, Mike Green, Hakan Yilmaz, Anne Marie Magnan, George Mavromanolakis, Fabrizio Salvatore.
Status of  b Scan Jianchun Wang Syracuse University Representing L b scanners CLEO Meeting 05/11/02.
Notes on offline data handling M. Moulson Frascati, 29 March 2006.
Ian Fisk and Maria Girone Improvements in the CMS Computing System from Run2 CHEP 2015 Ian Fisk and Maria Girone For CMS Collaboration.
KLOE Offline Status Report Data Reconstruction MonteCarlo updates MonteCarlo production Computing Farm C.Bloise – May 28th 2003.
W.Smith, U. Wisconsin, ZEUS Computing Board Zeus Executive, March 1, ZEUS Computing Board Report Zeus Executive Meeting Wesley H. Smith, University.
Workload Management WP Status and next steps Massimo Sgaravatto INFN Padova.
Outline: (1) The data sample (2) Some news on the analysis method (3) Efficiency revised (4) Background revised (5) Data: spectrum + “phi-curve”
Offline Discussion M. Moulson 22 October 2004 Datarec status Reprocessing plans MC status MC development plans Linux Operational issues Priorities AFS/disk.
D0 Farms 1 D0 Run II Farms M. Diesburg, B.Alcorn, J.Bakken, T.Dawson, D.Fagan, J.Fromm, K.Genser, L.Giacchetti, D.Holmgren, T.Jones, T.Levshina, L.Lueking,
MC/Offline Planning M. Moulson Frascati, 21 March 2005 MC status Reconstruction coverage and data quality Running time estimates MC & reprocessing production.
Offline/MC status report M. Moulson 6th KLOE Physics Workshop Sabaudia, May 2006.
KLOE Computing Update Paolo Santangelo INFN LNF KLOE General Meeting University of Rome 2, Tor Vergata 2002, December
N  for 2012 Zhiyong Wang May, 12,2015 Charmonium group meeting 1.
Progress on BR(K L  p + p - ) using a double-tag method A. Antonelli, M. Antonelli, M. Dreucci, M. Moulson CP working group meeting, 25 Feb 2003.
1 Some validation of AlpGen and TopRex Stan Bentvelsen Feb 18 th, 2004.
STATUS OF KLOE F. Bossi Capri, May KLOE SHUTDOWN ACTIVITIES  New interaction region  QCAL upgrades  New computing resources  Monte Carlo.
© 2012 IBM Corporation Platform Computing 1 IBM Platform Cluster Manager Data Center Operating System April 2013.
K  group activities K + K - retracking features New vs Old : resolution future planning. Conclusion and outlook K + K - retracking features New vs Old.
Update on MC-04(05) –New interaction region –Attenuation lengths vs endcap module numbers –Regeneration and nuclear interaction –EMC time resolution –
Outline: Tasks and Goals The analysis (physics) Resources Needed (Tier1) A. Sidoti INFN Pisa.
Status of the KLOE experiment M. Moulson, for the KLOE collaboration LNF Scientific Committee 23 May 2002 Data taking in 2001 and 2002 Hardware and startup.
LHCb production experience with Geant4 LCG Applications Area Meeting October F.Ranjard/ CERN.
Status of K S   e analysis C. GattiT. Spadaro Selection on data Selection on MC Efficiencies from data, K L   e, K S    ,      , bhabha.
The KLOE computing environment Nuclear Science Symposium Portland, Oregon, USA 20 October 2003 M. Moulson – INFN/Frascati for the KLOE Collaboration.
Dead or alive ??!! … Erika & Patrizia …. … this story begins when … … we were trying to produce the KMP dst’s for 2004 data … reproduce the List oh the.
Offline meeting Outcome of Scientific Committee Status of MC04 Proposal for a minimum bias EvCl sample Other offline activies: –Reprocessing –Dead wires.
PC clusters in KEK A.Manabe KEK(Japan). 22 May '01LSCC WS '012 PC clusters in KEK s Belle (in KEKB) PC clusters s Neutron Shielding Simulation cluster.
Offline meeting  Status of MC/Datarec  Priorities for the future LNF, Sep
 0  5  Outline Event selection & analysis Background rejection Efficiencies Mass spectrum Comparison data-MC Branching ratio evaluation Systematics.
Offline Status Report A. Antonelli Summary presentation for KLOE General Meeting Outline: Reprocessing status DST production Data Quality MC production.
Status report of the KLOE offline G. Venanzoni – LNF LNF Scientific Committee Frascati, 9 November 2004.
Particle Identification with TRD Prashant Shukla Institute of Physics University of Heidelberg Presentation at International Workshop on TRD 27 th September.
A more realistic photon simulation in Geanfi Capri , Kloe Phys Workshop III Motivations: A better description of shower simulation for photons and.
1 Update on tt-bar signal and background simulation Stan Bentvelsen.
PROOF tests at BNL Sergey Panitkin, Robert Petkus, Ofer Rind BNL May 28, 2008 Ann Arbor, MI.
Proposal for the study to define what is really necessary and what is not when the data from beam, ND and SK are combined A.K.Ichikawa 2008/1/17.
Offline Status Review M. Moulson, P. Valente, for the Offline Group 16 March 2001 Outline: Status update FILFO: new developments (G. Finocchiaro) Questions.
Study for rejection of muons from p/K decays Sergio Grancagnolo Stefania Spagnolo Andrea Ventura.
Offline resource allocation M. Moulson, 11 February 2003 Discussion Outline: Currently mounted disk space Allocation of new disk space CPU resources.
D0 Farms 1 D0 Run II Farms M. Diesburg, B.Alcorn, J.Bakken, R. Brock,T.Dawson, D.Fagan, J.Fromm, K.Genser, L.Giacchetti, D.Holmgren, T.Jones, T.Levshina,
Kinematics of Top Decays in the Dilepton and the Lepton + Jets channels: Probing the Top Mass University of Athens - Physics Department Section of Nuclear.
Status report on analysis of BR(K S  p + p - p 0 ) A. Antonelli, M. Moulson, Second KLOE Physics Workshop, Otranto, June 2002.
1 Reminder: Why reprocess? data Reconstruction: DBV DSTs: DBV data DBV-19 for reconstruction & DSTs, Run < DBV-20 for.
Alien and GSI Marian Ivanov. Outlook GSI experience Alien experience Proposals for further improvement.
January 21, 2005Peter Rovegno and David Williams, Milagro Collaboration Meeting 1 Background Rejection using Angle Fit Quality Source analysis has an implicit.
Progress on Simulation Software Hai-Ping Peng(USTC) Xiao-Shuai Qin(IHEP) Xiao-Rong Zhou(USTC) Yu Hu(IHEP) 2014 STC Workshop (ITP) Hai-Ping Peng.
Status Report on Data Reconstruction May 2002 C.Bloise Results of the study of the reconstructed events in year 2001 Data Reprocessing in Y2002 DST production.
Status of the measurement of K L lifetime - Data sample (old): ~ 440 pb -1 ( ) - MC sample: ~125 pb -1 ( mk0 stream ) Selection: standard tag (|
1 P. Murat, Mini-review of the CDF Computing Plan 2006, 2005/10/18 An Update to the CDF Offline Plan and FY2006 Budget ● Outline: – CDF computing model.
Biagio Di Micco  mass measurement Systematics on   mass measurement Biagio Di Micco.
MC/OFFLINE meeting  Status  Request by Ke2 group  aob LNF
Update on the false-dead DC wire problem
KLOE offline & computing: Status report
SuperB and its computing requirements
Status report on   f0  00
MC ’04-’05 objectives                                                       
TriggerDB copy in TriggerTool
KLOE General Meeting - LNF March,
PrimEx p0 radiative width extraction
Presentation transcript:

MC sign-off and running plans M. Moulson, 1 March 2004 Offline discussion Outline: Results of tests on new MC files Sign-off on production version What to run next? CPU allocation between MC & users

MC upgrades: Response simulation EmC response to m, p, and K L : Scaling of average response to ionization energy loss for m, p Modifications to GHESHIA: p +, p - interaction cross sections modified Nuclear-evaporation and charge-exchange cross sections modified Logical modifications Artificial time delay for K L interactions eliminated Probability of K 0 n interactions increased relative to K 0 p Probability of K 0 n   0 p 0 increased relative to K 0 n   0 p 0 Simulation of d rays in DC geanfi  1.7-3

MC upgrades: Reconstruction Modifications to DCDELETE: Order of hot/dead fixed HW efficiencies simulated Error in s-t relations used for DC reconstruction Spurious timing offset removed datarec DBV-17  DBV-18

MC upgrades: Kaon-decay generators K S  p e n(g) generator fixed p and n reversed Zero-test affecting radiative tail Decay mode for K S, K L, K +, K - resampled at moment of decay Fixes regeneration problem New generators for radiative K decays (IR-finite treatment of IB) K 0  pmng K +  p + p 0 g K +  mng, e ng K +  p 0 mng, p 0 e ng geanfi  1.7-3

MC upgrades: Other generators a 0 BR fixed (was 10  too high) wp 0 cross section decoupled from f cross section constant 8.3 nb cross section used (vs 3.1 m b for f at peak) bug in h  p + p - g generator fixed (kinematics) KLOE values for Dalitz plot slopes used for h  p + p - p 0 generator geanfi  1.7-3

MC production for diagnostic work all_phys : 27.6M (44.5 pb - 1 at 1:5 scale) 1 st trial, old wp 0 generator, E(K L crash) not adjusted : 10.2M (16.5 pb - 1 at 1:5 scale) 2 nd trial, new wp 0 generator, E(K L crash) not adjusted : 20.0M (32.3 pb - 1 at 1:5 scale) 3 rd trial, new wp 0 generator, adjustment of E(K L crash) ppgphok : 36.8M (140 pb-1 at 6:1 scale)

Problems?

Plans & priorities 1.Re-run ppgisr3 production (37M evts)2½ days 2.New MC production: radiative f decays, 110M evts6 days 3.New MC production: e + e - g, E g > 100 MeV, 32M evts3 days 4.New MC production: all_phys off peak, ~60M evts7 days 5.Re-run all_phys production (260M evts, 20M done)20 days 6.Re-run neu_kaon production (410M evts)30 days Run plan as of 29 Jan—have priorities changed? Test running with all_phys completed ppg running a new entry

How are we doing on time? Expect data by Easter (11 April, 42 days) ~70 days of planned MC production This (70 days) assumes: 1.Running time same as in ’03 production CPU time has increased! (10-20%) 2.CPU resources same as for ’03 production (60 “B80” CPUs) New IBM machines will be available soon (fibm35-44) 10 IBM p630 servers, 4x 1.45-GHz POWER4+ Adds at least 80 “B80” CPUs to offline farm

CPUs for MC and users Current queue configuration: kmc 52 (fibm22-34) ktest 30 (fibm 13-21) kmed 8 MC resources needed 60  (72/42)  1.2 = 120 CPUs Assumes: We start now on all nodes 20% more CPU for job Proposal: All new CPUs for MC (~80 “B80” equiv.) Keep using 40 “old” CPUs for MC Leaves: 12 additional CPUs for users (+33% on ktest)