MVD installation, fall 2004 Pads only:. Work done with IhnJea Choi MVD after successful installation Beam pipe is pushed to the center with a plastic.

Slides:



Advertisements
Similar presentations
Adding Gears to the NXT Taskbot
Advertisements

HW/Study Guide. Synchronization Make sure you understand the HW problems!
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Right-click on the colored box and remove it.
JET Algorithm Attila Hidvégi. Overview FIO scan in crate environment JET Algorithm –Hardware tests (on JEM 0.2) –Results and problems –Ongoing work on.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
How To Clean Your Room Just A Few of the Basics…. Valerie Nikkel Power Point, Project 3 10/22/03 12:19 PM.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
LKr readout: present and future R. Fantechi 30/8/2012.
Proposed Unit Record/1401 Equipment Display Room Aug 16, 2010 Stan Paddock.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
VBA session 3 Paul Rubinov  My job: diverse audience so Bore you for 15 minutes. Confuse you for the other 15 min.  Feel free to contact me
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
June 3, 2005H Themann SUSB Physics & Astronomy 1 Phenix Silicon Pixel FEM S. Abeytunge C. Pancake E. Shafto H. Themann.
ASP.NET The Clock Project. The ASP.NET Clock Project The ASP.NET Clock Project is the topic of Chapter 23. By completing the clock project, you will learn.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
PHENIX WEEKLY PLANNING 10/05/06 Don Lynch. 10/05/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
MVD Internal Review 28-Jan-2001 John P. Sullivan.
UCLA Group Meeting May 01, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari May 01, 2014.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
CS162 Week 5 Kyle Dewey. Overview Announcements Reactive Imperative Programming Parallelism Software transactional memory.
Status of NA62 straw electronics Webs Covers Services Readout.
1 The PHENIX Muon Identifier Front End Electronics Andrew Glenn (University of Tennessee), for the PHENIX collaboration Andrew Glenn 5/1/01 April APS Meeting.
AWAKE E. Gschwendtner, EATM, 1 July Highlights Since April 2015 Cabling, piping and rack installation campaign for the AWAKE facility has started.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
Mrs. Hucal Food and Nutrition February Falls 2. Cuts 3. Electrical shocks 4. Burns 5. Poisoning.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
Event Handling. Objectives Using event handlers Simulating events Using event-related methods.
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
Performance of PHENIX High Momentum Muon Trigger.
New L2cal hardware and CPU timing Laura Sartori. - System overview - Hardware Configuration: a set of Pulsar boards receives, preprocess and merges the.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
ASSIGNMENT POINTS DUE DATE: Monday NOV 30 JAVASCRIPT, INPUT VALIDATION, REGEX See 2 nd slide for Form See 3 rd next slide for the required features.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
11 th April 2003L1 DCT Upgrade FDR – TSF SessionMarc Kelly University Of Bristol On behalf of the TSF team Firmware and Testing on the TSF Upgrade Marc.
Square Plant Stand. TOOL: Radial Arm Saw NEXT STEP: Surface Planer RESULTS: Rough size pieces for 4 Legs. 33” long PROJECT Square Plant Stand PART Legs.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
ETD meeting Architecture and costing On behalf of PID group
AFE IIt/VLSB Update Firmware Progress Hardware Progress AFE IIt VLSB
Fix Microsoft Office error code (3) Call
University of California Los Angeles
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Game Over Module 4 Lesson 2.
LHC BLM Software audit June 2008.
Sector Processor Status Report
Data Collection Module (DCM) (review, fabrication plan & chain test)
Presentation transcript:

MVD installation, fall 2004 Pads only:

Work done with IhnJea Choi MVD after successful installation Beam pipe is pushed to the center with a plastic block (South side)

Initially, the South Glinks would not lock. Traced to bad 10MHz clock on backplane North crate backplane South crate backplane Caused by one bad DCIM module - removed Now everything reads out as before

We also rebuilt the test system in the 1008 side room, with 3 MCM’s

Safety improvements: 2) Made new piece of false flooring Getting up to the lift table meant going op 3 20” steps behind the MVD rack. No floor in that area 1) Made 3 removable 10” steps 20” MVD rack

Problem: AMU cell numbers, and event counters, go out-of-step during multi-event buffering. This is a problem in the ALM (address list manager) FPGA code. Can we reproduce the problem? Yes: put 5 fast triggers in the GTM file, or Insert Imran’s fast random triggers into the Phenix trigger system Not quite equivalent… Problems show up after 5-10k events, and accumulate. Modify ALM firmware: no more errors using the GTM triggers, but still errors using the random trigger: some progress... I wrote Perl scripts to quickly look at the relevant data words

Ongoing work IhnJea will not be back until January 2005, but he has some time to work on this this fall. He can prepare a few modified versions of the ALM FPGA code for testing. I can run the system from here (with a phone call to John Haggerty to plug in the random trigger), and try out the new codes. Unfortunately there is no deterministic way to find the race conditions that are the cause of these problems. Keep on plugging away…