AD&M Technical Integration AVIVA : Data Management and Optim 17 th September 2009.

Slides:



Advertisements
Similar presentations
Using Trace API to diagnose performance bottlenecks on production servers Nikolay Samofatov, Chief Technology Officer RED SOFT CORPORATION.
Advertisements

Creating a Data Disaster Recovery Plan. What is a DR Plan? Is your best solution to: Continuous business services Prompt and smooth recovery Prepare for.
BUSINESS RISK AND THE CLOUD START WITH MAKING CLOUD LESS CLOUDY © 2013 deRisk the Cloud / Beyond
11© 2011 Hitachi Data Systems. All rights reserved. HITACHI DATA DISCOVERY FOR MICROSOFT® SHAREPOINT ® SOLUTION SCALING YOUR SHAREPOINT ENVIRONMENT PRESENTER.
Modelling the Aerospace Aftermarket with Multi-agents Systems Ken Woghiren Technical Director - Lost Wax.
We make it easier for businesses of all sizes to safely accept checks transmodus offers clients automation utilizing our online processing platform for.
IT PLANNING Enterprise Architecture (EA) & Updates to the Plan.
SE 464: Industrial Information systems Systems Engineering Department Industrial Information System LAB 02: Introduction to SAP.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Chapter 7 Database Auditing Models
Lesson-21Process Modeling Define systems modeling and differentiate between logical and physical system models. Define process modeling and explain its.
Data Warehousing: Defined and Its Applications Pete Johnson April 2002.
Database Auditing Models Dr. Gabriel. 2 Auditing Overview Audit examines: documentation that reflects (from business or individuals); actions, practices,
Chapter 7 Database Auditing Models
ETL By Dr. Gabriel.
Hardware Upgrade Project George Palios. Contents Outlines the activities undertaken to upgrade the hardware for the Revenues, Benefits and NNDR Systems.
© 2008 IBM Corporation ® Gaining an understanding of complex application database relationships UNYOYG November 14, 2008 Ray Makela.
1.Database plan 2.Information systems plan 3.Technology plan 4.Business strategy plan 5.Enterprise analysis Which of the following serves as a road map.
November 24, 2005 JA-SIG UK, Edinburgh CMS for websites & portals - Luminis & Documentum Presented by: David Simpson, The University of Nottingham.
Cloud Tiering The recovery of primary storage by tiering inactive data.
Citigroup's IBM FileNet P8 Platform. 2 Agenda Introduction: The BPM Platform at Citi EMEA Use Cases: BPM Solutions within Citi EMEA Discussion.
Introduction. 
IS 460 Notes IS Strategic Planning By Thomas Hilton.
ITOM 2308 Introduction to Databases Review Access Database Corporate Case Study ITOM 2308 Class 81.
ARCHIVING S. WHAT IS ARCHIVING S Archiving is the act of preserving and making searchable all to/from an individual. archiving.
Leaders Have Vision™ visionsolutions.com 1 Database Archiving Michelle Ayers Advisory Solution Consultant November 2010.
PRESENTED BY: K2 blackpoint Fundamentals Module 1: Understand J SCOTT PITMAN –
Thru the Use of Technology Bridging the Gap In Education By Rachel Scott.
CSZ QUANTUM LEAP – Vic Falls Peter Doona Finance Director BAT Zimbabwe.
©2006 Merge eMed. All Rights Reserved. Energize Your Workflow 2006 User Group Meeting May 7-9, 2006 Disaster Recovery Michael Leonard.
Electronic Records Management: A Checklist for Success Jesse Wilkins April 15, 2009.
Technical Aspects of SIARD “SIARD under the hood” 10. April 2003 / Stephan Heuscher.
Database Security and Auditing: Protecting Data Integrity and Accessibility Chapter 7 Database Auditing Models.
INFO425: System Design INFORMATION X Chapter 8 Evaluating Alternatives for Requirements, Environment, and Implementation Evaluating Alternatives.
LeToia Crozier, Esq., CHC Vice President, Compliance & Regulatory Affairs Corey Wilson Director of Technical Services & Security Officer Interactive Think.
Presentation to the Information Services Board March 6, 2008 Bill Kehoe, Chief Information Officer Bill Kehoe, Chief Information Officer.
Maximo © 2009 IBM Corporation Optim ™ for Maximo.
I Copyright © 2007, Oracle. All rights reserved. Module i: Siebel 8.0 Essentials Training Siebel 8.0 Essentials.
Creating a Data Warehouse Data Acquisition: Extract, Transform, Load Extraction Process of identifying and retrieving a set of data from the operational.
Robert L. Jacobs Over 20 years of solid IT experience Results-oriented, innovative solutions Diverse industry background.
Week 7 Quiz P1 Zach Meier, Joe Mikula. Question 1 Which of the following is independent of the choice of a DBMS? Answer: A ERDs are simply a way to represent.
Greenlight Presentation Oracle 11g Upgrade February 16, 2012.
Automating Government With Quickbase Chris Willey Interim CTO District of Columbia Government.
INTERPLAN RE-PLATFORM 06/14/2013. Business Problem Support and Maintenance Challenges Obsolete Technology (Codigo) Heavy Database driven business logic.
Why Rocket Arkivio May, Storage Trends and Data Growth © 2012 Rocket Software, Inc. All Rights Reserved.
Practical IT Research that Drives Measurable Results Vendor Landscape Plus: Enterprise Content Management Suite ECM: A vendor marketing concept, not an.
TFS / Teamprise for J2EE Development Groups Month 00, 0000 Mac Noland Configuration Management Engineer Saturday, July 02, 2016.
South West Public Health Observatory Information system Migrations NDTMS-SWJuly 2012.
Database recovery contd…
Principles of Information Systems Eighth Edition
TFS Iteration Time Tracking and Reporting
ENVIRONMENTAL ASSESSMENT TOOLS
Outlook Recovery Freeware is the professional tool to fix Outlook Error and PST corruption.
Protect | Transform | Innovate
Lesson 6: Protecting, Maintaining and Managing Databases
MES Migration HGP Asia Knowledge Day 2017
Team Project, Part II NOMO Auto, Part II IST 210 Section 4
IBM Archiving Solutions for SAP
An end-to-end archiving project in just 45 minutes
Replace with Application Image
Department of Licensing HP 3000 Replatforming Project Closeout Report
Quality Assurance in an Agile Development Team Michelle Wu 2018 PNSQC
DAT381 Team Development with SQL Server 2005
Replacing Legacy Bank Account Management System Using Business Rules
IT and Development support services
Standardization Issues
IBM Tivoli Storage Manager
An end-to-end archiving project in just 45 minutes
SBS 2008 – One year on David Overton
CASE STUDY Network optimization.
Presentation transcript:

AD&M Technical Integration AVIVA : Data Management and Optim 17 th September 2009

AD&M Technical Integration Optim at Aviva Introduction Andrew Crouch Team Leader and lead analyst/developer on the project which evaluated, selected and then designed, built and implemented the archiving solution using the IBM Optim tool at Aviva (formally Norwich Union).

AD&M Technical Integration Optim at Aviva What issues were the Business facing? The non direct Claims and Workflow systems had been running on the current platform for 7 years, Policy systems for 2 years. The package had no archiving function. Data is being migrated/converted from old decommissioned systems. Capacity Planning were worried about the rate of data growth and associated costs and feel urgent action is required. Outage costs dramatically increasing. Feb 2000: NU – CGU Merger is announced. Data Protection Act Compliance. System Performance, Resilience, Recovery and Availability.

AD&M Technical Integration Optim at Aviva The approach taken to resolving the problems. Identified the need for a data archiving solution. Project started to select and implement an archiving solution. Group wide DPA compliance project started. Good service every day project started to look at Performance, Resilience, Recovery and system availability times.

AD&M Technical Integration Optim at Aviva What issues and challenges did the project face? Build vs Buy. Complicated requirements and rules. Tracking down all the data users. Getting sign offs from over 50 interested parties. We had the ERD’s available which made the Optim build simple.

AD&M Technical Integration Optim at Aviva Policy Client Claim Workflow The Data to be archived and its inter-relationships. Archiving a logical set of data.

AD&M Technical Integration System user Front end DB2 Tables Optim Archive Files New Archive Index The Solution design and where Optim fits. Archive Index Refresh Optim at Aviva

AD&M Technical Integration Optim at Aviva Breakdown of The Archiving project tasks.

AD&M Technical Integration Optim at Aviva Summary. Stats. At peak running we are removing 2 million database rows a day. Total number of database rows archived: 525 million Claims 206 million 19% of total Claims archived Policy 46 million 8% of total Policies archived Client 25 million 7% of total Clients archived Workflow 244 million With the continuing migration of data onto our strategic platforms either through the decommissioning of old systems or from mergers and acquisitions, managing archiving is an ongoing iterative process.

AD&M Technical Integration Optim at Aviva A selection of typical Questions and Answers. Q: Can data be restored? A: Yes, either selected data or a whole file can be restored. Q: Do you have to delete data? A: No, data can be archived without being deleted and in one case that was a necessary part of one of our solutions. Q: What financial benefits have you seen? A: Difficult to quantify because of the amount of changes that were implemented at the same time but 100’s of 1000’s of £ saved in reducing system recovery times. How much is brand image worth? Q: Are there performance benefits? A: Yes, where archiving is not implemented we have performance issues.