San Francisco, CA. SC8 Liaison Report

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi / Stephen Berger Chair / Vice-Chair
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
© 2011 Chevron API 16A 3 rd Edition Summer Conference Committee Meeting 24-June-2013 API 16A Chairman: John Busby Co-Chair: Jim McCabe.
Cover graphic should fill and not exceed the defined grey box. June 27, 2013 Gary Devlin API Subcommittee 18 – Quality Task Group 7: Product Life Cycle.
API Standard 6X: Design Calculations for Pressure-Containing Equipment
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
API Monogram Program Monogram Program Staff – SC Liaison Report
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
TG3 17TR8 Liaison Report HPHT Design Flow Chart
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi Chair
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
API SC6 Valves and Wellhead Equipment TG3 – Wellhead Design in Standards and TRs Kenneth Young 14 June 2012 SC6 Summer Meeting - Westminster, CO1.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
SC17 Materials Initiatives 2015 Summer Meeting Update.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi Chair 2015 November 11.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
2016 Exploration & Production Winter Standards Conference Subcommittee Workgroup formed to address rewrite:
Supply Chain Management Report for SC 18 January 2013.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
TG Chair: Darren Bane (BHI)
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
TG Chair: Mark Brinsden Shell
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
API RP 17A - Discussion Points
API SC6 Valves and Wellhead Equipment
2016 Exploration & Production Standards Conference Subcommittee 10
Specification on float equipment
ISO TC64/SC4/WG2 May 2011 status
API SC-16 task group for Specification 16D
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Summer Standardization Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
API Standard 53 Update June 2017
2016 Exploration & Production Summer Standards Conference
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
Discussion Points API RP 17A Task Group Members
API SC 10 WG15 Stage Cementing Collars
2nd Edition: 2019 Winter Standards Meeting
Float Equipment API Spec 10F
CSOEM Materials Advisory Resource Group
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16A January 24, 2019 Winter Conference – San Antonio
Well Intervention Well Control 2019 API E&P Winter Conference Update
Presentation transcript:

2015 Exploration & Production Standards Conference on Oilfield Equipment and Materials San Francisco, CA. SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick Liaison to SC18: Shawn Firenza ECSOEM/SC08 25-June-2015

SC8/TG1 Coverage – API SPEC 4F & RP 4G Chair – Shawn Firenza Document Status Spec 4F 4th ed. published January, 2013, effective August 1, 2013 RP 4G published April, 2012 Ongoing Activity – Item 6102 – AISC Study, Phase 2 will start in August to develop recommendations for the Task Group by next summer conference. Ballot 3289 – Definition of Substructure – Passed, Resolved Ballot 3287 – Inspection of Offshore Rigs – Passed, Resolved Ballot 3288 - Changes in Rig Location – Passed, Resolved ECSOEM/SC08 25-June-2015

SC8/TG2 Coverage – API SPEC 7K and RP 7L Chair – Faisal Yousef Document Status Spec 7K 5th ed. published June, 2010. RP 7L, reaffirmed August, 2012 Ongoing Issues – Working to define specification for drawworks Revisions to BOP handling specifications, draft will be issued to BOP licensees and the 7K mailing list for review and comment. Ballot 3284 Removal of Power Tongs - Passed, Resolved Ballot 3456 Purchasing Guideline - Passed, Resolved Spec 7K 6th ed. draft to be recirculated for review Spec 7K 5th ed. Requesting validity extension to allow time for review and publication of 6th edition. ECSOEM/SC08 25-June-2015

SC8/TG3 Coverage – API SPEC 8C, & RP 8B Chair – Ken Kondo Document Status Spec 8C 5th ed. published April, 2012 RP 8B, 8th ed. issued May, 2014 Ongoing Issues – Ballot 3454 Purchasing Guideline - Passed, Resolved Ballot 3526 Proof Load Testing - Passed, Resolved ECSOEM/SC08 25-June-2015

SC8/TG4 Ongoing Issues – Coverage – API SPEC 7F, 9A & RP 9B Chair – Dennis Fetter/Brent Dein Document Status Spec 7F 8th ed. published November, 2010 Spec 9A 26th ed. published May, 2011. Errata published October, 2012 RP 9B 13th ed., published October, 2011. Errata published April, 2012, and January, 2013 Ongoing Issues – Item 1402 - Wire Rope Safety Factors for setting BOP. Ballot 3530 API RP 9B, 14th edition – Passed, Resolved Spec 7F, 8th ed. to be balloted for reaffirmation for 5 years Spec 9A, 26th ed. to be balloted for reaffirmation for 5 years Requesting SMEs for roller chain to support SC8-TG4 ECSOEM/SC08 25-June-2015

SC8/TG5 Coverage – API 7HU1 Chair – Cindy Taff and Jason Shell Document Status API 7HU1, 1st ed. Published May 2009, Reaffirmed April, 2014 Ongoing Issues Item 9501 – Hammer Union Specification, Developing a Technical Specification for Design and Manufacture of Hammer Unions. Stress Engineering is performing analysis of the proposed design. Targeting end of 2015 for draft for ballot. ECSOEM/SC08 25-June-2015

SC8/TG6 Coverage – Definition of a Manufacturer Chair – Bo Creek Status Task Group established Ongoing Issues Task Group reviewed ongoing work from SC18-TG3, and providing comments through Bo Creek SC8 is informing the SC8 mailing list of the upcoming technical report to request their review and comments. Questions for SC18 Will all licensees be notified of the TR draft for comments when it is issued? What will the implementation period be for the TR once it is published to allow for the SC’s to make appropriate revisions to the product standards and to allow licensees time to implement changes in their facilities to meet minimum requirements? Can SC8 receive the comments associated to our product standards to help address the concerns within the product specs. ECSOEM/SC08 25-June-2015