MICE CM20 Alain Blondel 10 February 2008 1 The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.

Slides:



Advertisements
Similar presentations
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Advertisements

1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
1 Acceptance & Scraping Chris Rogers Analysis PC
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MANX meeting 15 July 2008 Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment MICE in 2011.
CMPB Alain Blondel 14 April STATUS OF MICE.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
CM37 Alain Blondel step IV physics success 1 « STEP IV operations : Physics »
MICE CM15 wrap-up Alain Blondel 11 June MICE News Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. for those who.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
Alain Blondel – introduction MICE CM Collaboration meeting June 2007 at RAL Complete review of the project Organization of efforts towards.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
MICE RF Workshop Alain Blondel MICE = critical R&D for neutrino factory and muon collider 1 neutrino factory: accelerate muons and store to produce.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
MICE news video conference 15 march MICE NEWS 1.TOF0/1/2 funding 2.MICE Installation/Commissioning/Operations group (MICO) 3.Important issues from.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
Alain Blondel 4 April  Aspirational MICE Schedule as of April 2008 Febuary-July 2008 STEP I September 2008 November 2008 to summer 2009 STEP II.
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
(one of the) Request from MPB
MICE S TEP IV P HYSICS ‘D ELIVERABLES ’ V. Blackmore MAP 2014 Spring Meeting 30 th May, /15 AKA “What will we learn from Step IV?”
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Ionisation Cooling Test.
MICE CM34 Wrap-up Alain Blondel 1 CM 34 wrap-up TOWARDS CM35.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Muon Ionisation Cooling Experiment Overview
MICE CM31 Schedule summary
The Detector System of the MICE Experiment
Presentation transcript:

MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks

MICE CM20 Alain Blondel 10 February Overview Neutrino Factory and Muon Collider have not disappeared from the horizon, on the contrary they receive substantial signs of support (EUROv, MCTF) The physics goals and motivation of the experiment remain unchanged: Design and build a section of cooling channel for a neutrino factory, place it in a beam and measure its properties precisely. MICE is a crucial step for Neutrino Factory and Muon Colliders. The uncertainty and delay in UK Phase II funding will delay MICE step IV and the following. This may lead to a relaxed attitude towards the schedule of earlier steps. --- DON’T !! --- A lot needs to be done to operate, operate safely, operate precisely

MICE CM20 Alain Blondel 10 February Much progress has been accomplished in the MICE beam line and Hall construction Technical uncertainties still in the target operation and the PSI solenoid How much beam can we get without producing excessive radiation in ISIS? -- aim of running period I: GET BEAM LINE TO OPERATE with detectors (CKOV, TOF0) -- Many lose ends remain to be finalize before being able to run. (see MOM’s talk) -- Serious schedule conflict arises between infrastructure construction (magnetic shielding and MICE hall floor) and installation of tracker in the hall. First estimate leads to completion of infrastructure construction by July 4th. This seriously compromises our running in period III (June 9-July 31) where we would be performing the first emittance measurement. ==> request PM to make every effort to remain within original schedule (May 31) -- schedule of SW calorimeter somewhat fuzzy: should organize construction! -- Funding has made substantial progress in 2007 (especially in the USA) and the construction of Phase II elements has begun: coupling coils, cavities etc..

MICE CM20 Alain Blondel 10 February MICE run and MOMs in 2008 Step I-- -- Step I -->

MICE CM20 Alain Blondel 10 February  Aspirational MICE Schedule as of January 2008 Febuary-May 2008 STEP I June 2008 September 2008 STEP II STEP IV Delivery of 1st FC May 2009 STEP V summer-fall 2009 STEP VI 2010 STEP III

MICE CM20 Alain Blondel 10 February  ? Aspirational MICE Schedule as of February 2008 Febuary-May 2008 STEP I June 2008 December 2008 STEP II STEP IV Delivery of 1st FC May > september 2009! STEP V summer-fall 2009 STEP VI 2010 STEP III.1

MICE CM20 Alain Blondel 10 February Important aspects of running MICE The Technical Coordinator/Project Manager is responsible for the safe implementation of the experiment and for its safe operation. Day-to-day responsibility for safety during the build phase of the experiment is delegated to the Hall Manager and Principal contractor. During running, the safe operation of the experiment is delegated to the MICE Operations Manager(MOM). For each MICE step a set of safety reviews will be organized by the MICE project manager, before installation (safety design review), before commissioning (authorization to operate) and before regular operation. The critical subsystems of MICE will be reviewed either collectively or one by one as will be seen fit by the MICE project manager in agreement with the spokesperson and in presence of one or several designated ISIS representatives as required. A fool-proof operations manual, including safety aspects, will have to be ready for each MICE subsystem before regular operation. Documentation is responsibility of each MICE subsystem

MICE CM20 Alain Blondel 10 February Selected News: -- it is agreed to include 250k€ for access to MICE muon beam in EUCARD -- Muons Inc. has expressed wish to join MICE formally. Project is to take care of the beamline correction and collimation system T.Roberts at Collanboration board

MICE CM20 Alain Blondel 10 February Final Comment -- Beyond Phase II Once PHASE II is completed, the MICE hall remains a facility with -- spectrometers, TOF and PID able to measure emittance to MW of 201 MHz RF power MV of RF acceleration -- Liquid hydrogen infrastructure and safety system MICE can become a facility to test new cooling ideas Longitudinal cooling? Lithium lense? ISS cooling cell? Guggenheim? etc etc... Initiatives welcome.