EDMEDM C&S Review 2/11/05 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to LANL Cost and Schedule Review Committee.

Slides:



Advertisements
Similar presentations
Technical Committees – the Brains of ASHRAE Section 1.0 — Fundamentals and General.
Advertisements

Electric field calculation for the neutron EDM SNS experiment. Septimiu Balascuta Ricardo Alarcon ASU, 02/07/2008.
Patricia Aguar Bartolomé Institut für Kernphysik, Universität Mainz PSTP 2013 Workshop, Charlottesville 11th September 2013.
High voltage test system update Summary of 2005 results Results from March, May 2006 Possible remaining R&D projects Polished electrodes, clean(er) LHe.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
Another Route to CP Violation Beyond the SM – Particle Dipole Moments Dave Wark Imperial/RAL WIN05 Delphi June 10, 2005.
1 Neutron Electric Dipole Moment Experiment Jen-Chieh Peng International Workshop on “High Energy Physics in the LHC Era” Valparaiso, Chile, December 11-15,
Experimental Atomic Physics Research in the Budker Group Tests of fundamental symmetries using atomic physics: Parity Time-reversal invariance Permutation.
Measurement of the electron’s electric dipole moment
Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.
Neutron Electric Dipole Moment 1.D. Beck (Intro) 2.S. Williamson (He3 Services construction and testing) 3.L. Yang (Light collection) with J. Blackburn,
Electric Dipole Moment of Neutron and Neutrinos
Collab 6/20/05 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los Alamos, NM January.
DHB, nEDM Collab. Mtg, 15/16 Apr 04 UIUC Test System (Beck, Chandler, Hertzog, Kammel, Newman, Peng, Sharp, Williamson, Yoder; Blackburn, Kenyon, Thorsland)
NEDM Collaboration Meeting, May 25-26, He Relaxation Steve Williamson UIUC.
1 The 3 He Injection Test for the nEDM Experiment 10/2008 Xiaofeng Zhu D. Dutta, H. Gao, M. Busch, Q. Ye, T. Mestler, X. Qian, W. Zheng Duke University.
Collab 4/15/04 #1 EDMEDM Funding the Project Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los.
New nEDM Sensitivity Calculation T. Langford B. Beise University of Maryland 7/3/2008 Simulation Teleconference Starting Points: Work by V. Cianciolo,
1 Plan of the injection test 02/2007 nEDM H. Gao, M. Busch, Q.Ye, T. Mestler, X. Qian, W. Zheng, X. Zhu Duke University And others in nEDM collaboration.
1 Preparation for the 3 He Injection Test 11/2007 MIT/BATES D. Dutta*, H. Gao, M. Busch, Q. Ye, X. Qian, W. Zheng, X. Zhu ( Duke University) ASU, BU, Caltech,
Future electron EDM measurements using YbF
P25 EDMEDM Seminar 4/27/05 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to P-25 Seminar Los Alamos, New Mexico April.
1 NEDM 4 He Purifier and Other Cryogenic Issues David G. Haase North Carolina State University Update on Cryovessel Engineering Evaporative Purification.
1 Update of the injection test 06/2007 nEDM H. Gao, M. Busch, Q.Ye, T. Mestler, X. Qian, W. Zheng, X. Zhu Duke University And others in nEDM collaboration.
Duke nEDM Collaboration Meeting The status of 3 He Relaxation Time Measurement at ~400mK Q. Ye, D. Dutta, H. Gao, W. Zheng, X. Zhu Duke University R. Golub,
Separate production cell. Geometry and dimensions If the filling time is much shorter then the accumulation time then maximum of UCN density in the measurement.
EDMEDM EDM Fast Start, May 23, 2006He3S, Steven Williamson EDM Fast Start Helium-3 Services (He3S) Steven Williamson May 23, 2006.
Collab 4/15/04 #1 EDMEDM UIUC meeting 12/3/2004 Walter Sondheim, P-25, Los Alamos for presentation to The EDM Collaboration UIUC meeting, Urbana, IL UCN.
DOE 2/11/05 #1 EDM R&D Progress Steve Lamoreaux, Los Alamos Co-spokesperson for the EDM Project for presentation to The Department of Energy Cost & Schedule.
EDMEDM EDM Collaboration Meeting 3-06 Jan Boissevain, P-25 March 2, 2006 NCSU EDM Experiment Design Status.
Collab Store 6/6/07 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los Alamos, NM June.
Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.
Polarized 3 He Relaxation Low T N. Boccabello, D. Dutta, H. Gao, K. Kramer, X.Qian, Q. Ye, X. Zong (Duke) L. Hannelius, B. Heyburn, R.D. McKeown,
P25 Interface 5/19/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Subsystem Managers Duke University,
3 He Relaxation below 1 K Jacob Yoder UIUC October 6 th, 2006.
Plans for HV R&D at LANL Vacuum chamber Supply cryostat Josh Long, Indiana U. Tests in progress Control purity, contaminants, attempt T < 1.8 K Near Future.
Trap laser (6 mW - 1 cm diameter) x 6 -  /2 detuned to 171Yb 1P1 oven Zeeman slower Trapped atom number Lens f=7.5 cm, diameter d=2.54 cm PMT = 5
The NPD  Experiment David Bowman IScientific goals IIStatus.
Preparation for the 3He Injection Test
1 How Can We Get More Neutrons? Upgrade Paths for the EDM Geoff Greene University of Tennessee /Oak Ridge National Laboratory Oct 2006.
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
Ultra-low Field Nuclear Magnetic Resonance Measurements with SQUIDs
Study of T 1 relaxation time A proposal to test T 1 using a dilution fridge and SQUID NMA at Royal Hollow University,London.
EDM Engineering Issues General Mechanical Considerations EDM Cryostat Plan D ANSYS EMAG Calculations ANSYS MECH Calculations 3 June ‘03 J. Boissevain.
Collab_NSAC 4/2/03 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to EDM Collaboration Meeting Los Alamos, NM.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
Transport of 3 He by heat flush measurement of 3 He concentration tests of heat flush George Seidel Brown University.
Status of the HV Test System Purposes of the HV test system Design and assembly progress Vacuum enclosure Projected assembly and test milestones (short-term)
Alex Sushkov Dima Budker Valeriy Yashchuk (UC Berkeley) Kerr Effect-based Measurement of the Electric Field.
3 He R&D Plan at Los Alamos Takeyasu Ito Los Alamos National Laboratory EDM Collaboration Meeting May 26, 2006 Oak Ridge, TN.
Kerr Effect-based Measurement of the Electric Field
Chapter 26 CURRENT ELECTRICITY Electric Current (I) –rate of positive charge passing through a surface I=dQ/dt –units Coulomb/Second = Ampere (C/s = A)
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
EDMEDM EDM Collaboration Meeting 6-05 Jan Boissevain, P-25 June 20, 2005, Los Alamos National Laboratory EDM Reference Design.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Collab 6/20/05 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los Alamos, NM June 20,
R&D Plan on Light Collection Takeyasu Ito Los Alamos National Laboratory.
LANL 4/16/04 #1 Helium-3 Beam Source Development Steve Lamoraux, Los Alamos Collaboration Meeting April
NEDM Cost and Schedule Review, February 11, 2005 Upper Cryostat and Valves Cost and Schedule for WBS 3.2, 3.3, 3.4, and 8.2 L. M. Bartoszek D. H. Beck.
Office of Nuclear Physics R&D 12/14/06 #1 Risk Based R&D Plan Martin Cooper Los Alamos.
Collab_NSAC 4/2/03 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to EDM Collaboration Meeting Los Alamos, NM.
Specifications for the Integrated Tests II Paul Huffman.
Collaboration Business
Neutron and electron electric dipole moments
Xiangyi Cui Shanghai Jiao Tong U. On Behalf of the Collaboration
Section 1.0 — Fundamentals and General
The Effect Of A Magnetic Field On Charged Particles
ECE699 – 004 Sensor Device Technology
neutron lifetime experiments
MIRACLES budget: Summary of the 3 configurations
Presentation transcript:

EDMEDM C&S Review 2/11/05 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to LANL Cost and Schedule Review Committee for the EDM Project Los Alamos, NM February 11, 2005 EDM Research and Development

EDMEDM C&S Review 2/11/05 #2 SNS Risk Analysis QuantitySymbolDesignDegradedEDM Loss EDM Limit [95% CL] Wall Loss Time ww >2,000 s500 s1.8 Particle ID30:12:14 Background / Signal2:15: He Relaxation Time 33 30,000 s3,000 s1.9 3 He Initial PolarizationP3P3 99%90%1.2 SQUID Noise 1  0 10  Trapped Fields  B/B x Electric FieldE50 kV/cm25 kV/cm2 Quadrature6.520 x e*cm Murphy's Law (4 worst) x e*cm

EDMEDM C&S Review 2/11/05 #3 Equipment Funding for R&D LANL LDRD - Mostly salaries $150k $600k CE for DR $400k $600k DOER&D $600k proposal submitted$1350k

EDMEDM C&S Review 2/11/05 #4 Electric Field

EDMEDM C&S Review 2/11/05 #5 High Voltage (LANL) Capacitive Multiplier HV Test Stand

EDMEDM C&S Review 2/11/05 #6 Kerr Effect-Liquid He (Berkeley) Measurement: K = (1.43±0.02 (stat) ±0.04 (sys) ) x (cm/V) 2 Theoretical value (1s, 2s, 2p levels): K = 1.7x (cm/V) s HV Stability

EDMEDM C&S Review 2/11/05 #7 Magnetic Field

EDMEDM C&S Review 2/11/05 #8 B-Field Uniformity Low fields and diffusive motion 1% depolarization 3 He sample preparation volume( 200 s) B 0 = 100 mG(dB/dz)/B 0 = 0.2% Transfer tube( 2 s) B 0 = 100  1 mGdB/dz < 1.8 mG/cm Measuring cell(1000 s) B 0 = 1 mG(dB/dz)/B 0 = 0.1%

EDMEDM C&S Review 2/11/05 #9 Magnetic Materials (LANL, Caltech) Magnetic Field Uniformity Room Temperature 1.2 K

EDMEDM C&S Review 2/11/05 #10 Magnetic Materials (LANL, Caltech)   Required 

EDMEDM C&S Review 2/11/05 #11 3 He

EDMEDM C&S Review 2/11/05 #12 SQUID Low-Field NMR (LANL)

EDMEDM C&S Review 2/11/05 #13 3 He Atomic Beam Polarizer (LANL) Device commissioned Flux 4 x atoms/s Average velocity ~150 m/s Polarization measurements (99.6 ± 0.25)% Loading time 300 s

EDMEDM C&S Review 2/11/05 #14 3 He Atomic Beam Polarizer (LANL)

EDMEDM C&S Review 2/11/05 #15 3 He Relaxation (Duke)

EDMEDM C&S Review 2/11/05 #16 3 He Relaxation (UIUC)

EDMEDM C&S Review 2/11/05 #17 4 He

EDMEDM C&S Review 2/11/05 #18 4 He Purifier (HMI, LANL, NCSU) McClintock Heat Flush Technique First sample measured at ANL - 3 He/ 4 He < He/ 4 He mixture Pure 4 He Resistive heater wrapped on capillary Flow control valve Phonons T = 1.2 K

EDMEDM C&S Review 2/11/05 #19 3 He Diffusion (LANL, SFU) Experiment:D = D T T -7 = (1.6 ± 0.2)T -7 cm 2 /s Theory:D = D T T -7 = (1.2 )T -7 cm 2 /s

EDMEDM C&S Review 2/11/05 #20 4 He Purification 3 He velocity must be sufficient to overcome the binding energy to the superfluid 4 He, i.e 0.3 K < T < 0.5 K based on the diffusion coefficient measurement. The pump is a charcoal trap

EDMEDM C&S Review 2/11/05 #21 Neutrons

EDMEDM C&S Review 2/11/05 #22 n-Lifetime (Harvard, NCSU)

EDMEDM C&S Review 2/11/05 #23 Particle ID (HMI, SFU, LANL, NCSU) n( 3 He,t)p e

EDMEDM C&S Review 2/11/05 #24 n-Storage (LANL, SFU, NCSU, Harvard) The cell - 90 cm x 19 cm ID liters UCN/cc gives 2.5 x acrylic coated with d-styrene - can be cooled to ~4 K

EDMEDM C&S Review 2/11/05 #25 Bismuth Filter Ballistic Neutron Guide Section Neutron Beam Splitter Guide Section Fundamental Neutron Physics Hall Dilution Refrigerator Pump Packages 1000 Liter Dewar Neutron Guide (LANL, ORNL)

EDMEDM C&S Review 2/11/05 #26 Cryogenics

EDMEDM C&S Review 2/11/05 #27 Dilution Refrigerator (LANL) Up to 5 mW at 120 mK

EDMEDM C&S Review 2/11/05 #28 SNS Risk Analysis Reprised QuantitySymbolDesignDegradedEDM Loss EDM Limit [95% CL] Wall Loss Time ww >2,000 s500 s1.8 Particle ID30:14:13.0 Background / Signal2:15: He Relaxation Time 33 30,000 s10,000 s1.3 3 He Initial PolarizationP3P3 99%99.6%1.0 SQUID Noise 1  0 10  Trapped Fields  B/B x Electric FieldE50 kV/cm 1.0 Quadrature4.815 x e*cm Murphy's Law (4 worst) 1338 x e*cm