ARTEMIS Independent Integrated Review 1 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS ARTEMIS Science Vassilis Angelopoulos ESS/IGPP UCLA and SSL/UCB.

Slides:



Advertisements
Similar presentations
Madeline Hubbard (Keene High School) Matthew Shindel (Stanwich High School) Advisors: Fathima Muzamil, Dr. Charles Farrugia, Dr. Roy Torbert Objective:
Advertisements

General Findings Concerning the Magnetospheric Realm ILWS - 11 Science Workshop, Beijing, China, Aug-Sep 2011.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Michael Lampton Overview of Space Sciences Laboratory 16 July 2003.
1st Joint Cluster-THEMIS Workshop THEMIS Orbit Updates - 1 UNH, Sep 23-26, 2008 THEMIS Orbit Updates Prior to Second Tail Season 2008/2009 S.Frey, V.Angelopoulos,
NASA Living with a Star Program Targeted Research & Technology Steering Committee NASA HQ & LWS TR&T Update September 16, 2008 Doug Rowland On Detail to.
Solar system science using X-Rays Magnetosheath dynamics Shock – shock interactions Auroral X-ray emissions Solar X-rays Comets Other planets Not discussed.
1 NASA/HQ April, 2009 THEMIS ARTEMIS (a spin-off of THEMIS) and Exploration.
Spacecraft working group report SuperDARN workshop 2011 Rob Fear, Jim Wild & the spacecraft working group.
ARTEMIS’s Planetary Goals 1 October 26, 2009 THEMIS ARTEMIS THEMIS Extended Phase = THEMIS baseline + ARTEMIS ARTEMIS Lunar Exploration.
THEMIS SRR 1 UCB/SSL, July 8-9,2003 THEMIS Science Requirements Dr. Vassilis Angelopoulos Principal Investigator Space Sciences Laboratory University of.
THEMIS/Science Briefing 1 NASA/HQ, 03/12/2003 T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS (THEMIS) RESOLVING THE PHYSICS.
AIAA Panel on Small, Distributed, Fractionated Spacecraft 1 Long Beach, CA Sept. 18, 2007 Introduction THEMIS Overview Lessons Learned Importance of a.
Brief introduction of YINGHUO-1 Micro-satellite for Mars environment exploration J. Wu, G. Zhu, H. Zhao, C. Wang, L. Lei, Y. Sun, W. Guo and S. Huang Center.
1 Constellations for Space Physics Missions: Advantages and Feasibility Vassilis Angelopoulos Space Sciences Laboratory, UC Berkeley and Jet Propulsion.
Solar System Missions Division Solar Orbiter Next major Solar and Heliospheric mission ESA ILWS flagship Now with the Inner Heliospheric Sentinels.
4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, THEMIS Operations & Anomalies Manfred Bester.
1 Barry Mauk, Nicola Fox, David Sibeck, Shrikanth Kanekal, Joseph Grebowsky, Ramona Kessel RBSP Project Science Team This document has been reviewed for.
THEMIS and ARTEMIS David G. Sibeck THEMIS Project Scientist NASA/GSFC 2/17/2007 Cape Canaveral.
SSL-SWT 1 Aug 6-8, 2007 THEMIS Extended Phase Summary of THEMIS team discussions (Please note: this is work in progress)
ARTEMIS’s Planetary Goals 1 June 13, 2008 THEMIS Extended Phase = THEMIS baseline + ARTEMIS ARTEMIS Lunar Exploration.
Aurora, Substorms, and THEMIS D. G. Sibeck NASA/GSFC THEMIS Project Scientist.
Heliospheric Imager – Scientific Operations  HI Operations Document – R. Harrison (presented by Dave Neudegg – SciOps for Cluster, Mars Express, Double.
Reconnection rates in Hall MHD and Collisionless plasmas
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
THEMIS SRR 1 UCB, June 8-9, 2003 Solid State Telescope Davin Larson SSL.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
1 THEMIS Inner Magnetosphere Review, Dec 20, 2008 Summary of THEMIS results in the inner magnetosphere Future mission operations discussion: –Science targets.
THEMIS IDPU FSW 11/29/ UCB THEMIS IDPU FSW V4 Mission Profile Tests Peter Harvey Michael Ludlam.
Energy conversion at Saturn’s magnetosphere: from dayside reconnection to kronian substorms Dr. Caitríona Jackman Uppsala, May 22 nd 2008.
ARTEMIS from a Planetary Perspective 1 September 9, 2008 THEMIS Extended Phase = THEMIS baseline + ARTEMIS Vassilis Angelopoulos, and the ARTEMIS team.
ESS 7 Lecture 13 October 29, 2008 Substorms. Time Series of Images of the Auroral Substorm This set of images in the ultra-violet from the Polar satellite.
THEMIS/ARTEMIS, Fall SWT 1 Sep , 2011 ARTEMIS THEMIS Mission accomplishments, status Li et al GRL Cover Bortnik et al Science JGR special.
EGU General Assembly 2006, 2-7 April, 2006, Wien ST6 Multi-point measurements of solar-terrestrial plasma: results and future perspectives Scientific objectives.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
THEMIS INSTRUMENT PDROVERVIEW- 1 UCB, October 15, 2003 THEMIS SYSTEM OVERVIEW Dr. Vassilis Angelopoulos, Science Overview Dr. Ellen Taylor, Mission and.
S. Frey, UCB, THEMIS 1 25th ISSFD, Munich, Germany, Oct.19-23, 2015 ARTEMIS THEMIS ARTEMIS The Revised Concept of the THEMIS and MMS Coordination Sabine.
SSL-SWT 1 Aug 6-8, 2007 Introduction Mission elements Mission Status First light: Tail’s welcome Dayside Events THEMIS MISSION Overview Status And First.
Dec 1, FIELDS Top Level Requirements Review S. Harris (UCB)
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
THEMIS-ERG-Orbitals1 UCLA, March 18-19, 2010 THEMIS in the RBSP, ERG, Orbitals era Vassilis Angelopoulos UCLA ESS/IGPP & SSL/UCB.
How ARTEMIS Contributes to Key NLSI Objectives C.T. Russell, J. Halekas, V. Angelopoulos, et al. NLSI Lunar Science Conference Ames Research Center Monday,
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Operational Concept.
SST- Solid State Telescope ESA - Electrostatic Analyzer Science Measurement and Operational Requirements.
THEMIS/ GBO SciRR splinter 1 UCB/SSL, 06/02/2003 T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS (THEMIS) RESOLVING THE PHYSICS.
Joint Cluster-THEMIS SWT 1 Sep 23-26, 2008 Vassilis Angelopoulos, James P. McFadden, Davin Larson, Charles W. Carlson, Stephen B. Mende, Harald Frey, Tai.
HQ Lunch Science Seminar Series 1 NASA/HQ, 1/28/2008 Introduction, THEMIS overview First THEMIS results from the tail First THEMIS results in the dayside.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
Lunar Surface Atmosphere Spectrometer (LSAS) Objectives: The instrument LSAS is designed to study the composition and structure of the Lunar atmosphere.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
SECAS Dec 01 MISSIONS: POLAR, WIND, GEOTAIL, CLUSTER Jim Sharber MISSION STATUS.
THM+ART Senior Review 1 Apr 8, 2008 THEMIS Extended Phase = THEMIS baseline + ARTEMIS THEMIS Senior Review.
ARTEMIS Financial Feasibility Review 1 NASA/HQ – Mar. XX, 2009 THEMIS ARTEMIS THEMIS-ARTEMIS (THEMIS Extended Phase) Financial Feasibility Review Science.
Solar and heliosheric WG
THEMIS Science Progress NASA/GSFC, Oct 26, 2007
THEMIS The THEMIS mission approach to addressing the substorm question
02/04/17 1.
ARTEMIS – solar wind/ shocks
THEMIS program: an Overview
THEMIS and ARTEMIS Status
Significant results from 2 years of operations
THEMIS observations at a substorm onset on March 1, 2008
First 10 months (Feb 2007-Dec 2007)
Analysis of Substorms during the Second THEMIS Tail Season
THEMIS First Results and near future
THEMIS baseline + ARTEMIS
THEMIS Dayside Lessons learned from the coast phase and the 1st dayside season Current plans for the 2nd dayside season and the extended phases.
Presentation transcript:

ARTEMIS Independent Integrated Review 1 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS ARTEMIS Science Vassilis Angelopoulos ESS/IGPP UCLA and SSL/UCB

ARTEMIS Independent Integrated Review 2 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS Overview Science Background Mission Concept Science Objectives L1 Requirements Lunar Mission Phases Science Instrument Utilization

ARTEMIS Independent Integrated Review 3 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS THEMIS: 5 satellites, Launched February 27, 2009 To Solve the Mystery of what Triggers Auroral Substorms Simulation: J. Raeder, UNH Visualization: Tom Bridgman, GSFC/SVS

ARTEMIS Independent Integrated Review 4 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS THEMIS Mission elements Five probe conjunctions along Sun-Earth line recur once per 4 days over North America. Ground based observatories completely cover North American sector; determine auroral breakup within 1-3s … … while THEMIS’s space-based probes determine onset of Current Disruption and Reconnection each within <10s. : Ground Based Observatory

ARTEMIS Independent Integrated Review 5 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS Mission overview Instrument I&T UCB Mission I&T UCB Encapsulation & launch BGS Operations UCB Probe instruments: ESA: ElectroStatic Analyzer (coIs: Carlson and McFadden) SST: Solid State Telescopes (coI: Larson) FGM: FluxGate Magnetometer (coIs: Glassmeier, Auster & Baumjohann) SCM: SearchCoil Magnetometer (coI: Roux) EFI: Electric Field Instrument (coI: Bonnell) Ground SST ESA EFIa EFIs FGM SCM T spin =3s Release CCAS

ARTEMIS Independent Integrated Review 6 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS Launch= X GSE Y GSE TH-B TH-C TH-D TH-E TH-A P1 P2 P3 P4 P5 First 10 months: Commissioning and Coast Phase Observations Angelopoulos, 2008 Space Sci. Rev.

ARTEMIS Independent Integrated Review 7 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS Dayside X GSE Y GSE First year baseline orbit (FY08) Dayside X GSE Y GSE TH-B TH-C TH-D TH-E TH-A P1 P2 P3 P4 P5 First year baseline orbit (FY08) Tail Tail Angelopoulos, 2008 Space Sci. Rev.

ARTEMIS Independent Integrated Review 8 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS

ARTEMIS Independent Integrated Review 9 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS All instruments functioning nominally –Cross calibration, inter-calibration performed during coast-phase Team discoveries in the news –Data collected per plan, widely disseminated –Science discoveries piling up 100 science papers during the last year Space Science Reviews volume in print (>20 papers) >20 GRL papers in special issue on THEMIS >20 JGR papers in special issue on THEMIS THEMIS in the news every AGU meeting –First tail season showed thinner tail than expected –Adjusted 2 nd tail season orbit to account for it –Second tail season results are a resounding success A dozen substorms collected: unique features Provide further insight into last years’ observations Anticipate mission completion on time, on budget by September 2009 Constellation available in good health for extended mission: FY10-12 Extended Phase Approved in Senior Review (Jun 09) thru Sep 2012 –THEMIS and ARTEMIS comprise the THEMIS Extended Phase –Extended Phase Contract expected to be signed March 09 –Two ARTEMIS peer reviews conducted already –Instruments checked out especially for low field conditions –ARTEMIS implementation is a “go” pending results from this review THEMIS Status

ARTEMIS Independent Integrated Review 10 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS THEMIS = THEMIS baseline + ARTEMIS Extended Phase Proposal: Mission Concept

ARTEMIS Independent Integrated Review 11 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS ARTEMIS (P1,P2) in FY10,11,12: Mission Concept FY10: Translunar injection FY11-12: 6mo in Lissajous orbits + 17 mo in Lunar orbits

ARTEMIS Independent Integrated Review 12 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS ARTEMIS Science Objectives, #1 In the Magnetosphere, study: –Particle acceleration: X-line or O-line? –Reconnection: 3D character; global effects –Turbulence: Drivers and effects Result: –Reveal 3D distant tail, dynamics In conjunction with: –Solar wind monitors: ACE, WIND, STEREO –Inner magnetosphere monitors: Cluster, Geotail, FAST Using the first: –Two point: dX, dY measurements –…at scales from ion gyroradius to several R E –Even single point measurements are critical in this region

ARTEMIS Independent Integrated Review 13 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS Using first of a kind: –…two point measurements at scales 1-10 R E, ideal for study of particle evolution in shocks, at foreshock and inertial range of turbulence –WIND can replace one of two probes in this study In the Solar Wind, study: –Particle acceleration at shocks –Nature and extent of elusive low-shear reconnection –Properties of inertial range of turbulence Result: –Advance our understanding of particle acceleration and turbulence in Heliosphere In conjunction with: –Other solar wind monitors: ACE, WIND, STEREO ARTEMIS is: –High-fidelity solar wind monitor –In beacon mode if requested ARTEMIS Science Objectives, #2

ARTEMIS Independent Integrated Review 14 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS At the Moon/Wake: –Study 3D structure and evolution of wake –Understand particle acceleration at wake –Understand wake refilling under various SW conditions Result: –Advance our understanding of wakes at planetary moons, plasma void refilling around large objects (Shuttle, ISS, Hubble) Using first of a kind: –…two point measurements at scales R E, ideal for two- point correlations within wake and between wake and solar wind –Comprehensively instrumented satellites have never studied wake from various vantage points, thus even single point measurements are critical. ARTEMIS Science Objectives, #3

ARTEMIS Independent Integrated Review 15 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS ARTEMIS Science Objectives Summary A cceleration, R econnection and T urbulence and E lectrodynamics of M oon’s I nteraction with the S un (ARTEMIS) will be the first Heliophysics mission to study with comprehensive instrumentation: Particle acceleration, reconnection and turbulence –In the solar wind –In the magnetosphere Wake formation and refilling –In the solar wind (supersonic) –In the magnetosheath (subsonic) ARTEMIS requires one probe (minimum) plus a solar wind monitor (ACE, WIND), but will reach full mission potential with both probes, as baselined. ARTEMIS will benefit concurrent lunar missions LADEE and LRO. ARTEMIS will also advance our understanding of planetary processes and is in-line with as well

ARTEMIS Independent Integrated Review 16 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS ARTEMIS Level 1 Requirements … 4. Baseline Mission Full success requires: collection of a 50% aggregate interval from a 24 month period of particles and fields observations on two probes; select fast rate data captures from key intervals (10% time); and a total of 10 wake crossings by one ARTEMIS probe with simultaneous observations by the other ARTEMIS probe at separation distances ranging from 0.1 to 20 R E. Adherence: Data collection will be adjusted to match nominal downlink capability by reducing cadence. Data collection will include continuous, low resolution (~ once per 3 spins) Slow Survey data, 2hrs per orbit of Fast Survey data with one burst each. Wake crossings will be part of Fast Survey schedules. This volume can be accommodated in the memory and downlinked once per 2 days. This can be accomplished in 24 months with a factor of 2 margin. 5. Minimum Success Minimum success requires collection of a 50% aggregate interval from a 6 month period of particles and fields observations on one probe, including at least 5 wake crossings by one ARTEMIS probe with simultaneous observations of the solar wind by one or more Heliophysics missions (e.g. ACE, the other ARTEMIS spacecraft, Geotail, or Cluster). Adherence: Same as above, but for one ARTEMIS probe plus another Heliophysics mission during a 6 month period. This can be accomplished in 6 months with a factor of 2 margin.

ARTEMIS Independent Integrated Review 17 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS ARTEMIS Phases Translunar injection phase (Oct ’09 – Oct ’10) No Science, just get there. Note: Orbit Raise Maneuvers (ORMs) start: July 2009, in parallel with THEMIS 2 nd dayside operations (THEMIS dayside requirements met already since 1 st dayside season) Lissajous Phase (Oct ’10 – Apr ’11) Note: First 3 months: opposite sides, Next 3 months: same side Lunar Orbit Phase (May ’11 – Sep ’12) Note: P1 retrograde, and P2 prograde, such that orbital separations and separation vectors cover full parameter space

ARTEMIS Independent Integrated Review 18 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS ARTEMIS Science Analysis Wake, Solar Wind, and Tail R1 alpha R2 delta R delta R - inter s/c distance in RL alpha - angle between the inter s/c vector and the sun-moon line hours - number of hours within region. number bins - alpha = 36, delta R = 50 (5 degrees for alpha, total hours - orbits propagated for 12,000 hours (500 days)

ARTEMIS Independent Integrated Review 19 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS ARTEMIS Science Analysis Wake only D1 D2 D1 - the distance between s/c and moon, along the sun line D2 - the distance from the s/c to the sun moon line bin size - D1/D2 = 0.25 (one quarter rl) hours - number of hours within region. total hours - orbits propagated for 12,000 hours (500 days)

ARTEMIS Independent Integrated Review 20 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS ARTEMIS: Science Instrument Utilization All instruments will be utilized in their standard Survey and Burst Modes –Magnetometer will observe lower fields than at Earth, used in most sensitive range –Search coil will be sensitive as is, in nominal operation –ESA will be in solar wind mode, designed to resolve the SW beam –SST will be in its nominal mode If Planetary decides to fund ARTEMIS to study Planetary objectives then: –SST energy bins will be adjusted to provide better dE/E in a smaller E-range Instrument operations will be similar (if not identical) to present because: –The near-equatorial, 26hr period orbits during lunar phase and the planned downlink schedule of once per 2 days provides the same shadow, power, data through-put and thermal environment as at Earth –Instrument have already operated and tuned in the solar wind environment, the magnetosheath and magnetotail environment and are known to perform nominally Science operations (modes) will be similar (if not identical) to now since: –Slow Survey will accomplishing science requirements at low cadence –Fast Survey can accomplish pre-planned, time-based “conjunction” science peri-selene, wake crossings, or 2-probe wake crossings Opportunity science, when in SW –Bursts can accomplish high cadence science in interesting times Current triggers (Bz, Ni) expected to work to capture reconnection, wake events Sufficient flexibility exists in triggers to capture other event types if necessary (shocks, CMEs).

ARTEMIS Independent Integrated Review 21 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS ARTEMIS: Summary ARTEMIS is a robust mission, extending P1, P2’s life in a familiar environment ARTEMIS orbits are benign and science optimization has already been done –Current L1 minimum requirements drive minimally mission design and operations –Current L1 baseline requirements benefit from 3 years of mission optimization, and have been built into a “natural” baseline design that is also operationally optimal ARTEMIS instruments can do the job –Have been studying the same environment successfully for just over 2 years –Can be commanded to perform Survey and Burst captures in familiar methods ARTEMIS rates and volumes are commensurate with proposed science –Expecting 1/4 of data volume per data downlink capability and a Survey cadence that can fit continuous coverage, there is a factor of 2 margin that can be used to benefit low cost operations.