KSC Ground Operations Timeline. KSC CGSE TIM A Technical Interchange Meeting regarding the Cryo Ground Support Equipment was held at KSC November 1 st.

Slides:



Advertisements
Similar presentations
SHUTTLE PROCESSING (Before Flight Activities Rarely Seen By The General Public) DISCOVER --- DISCOVERY.
Advertisements

APOLLO 13 Safety Message Bob Sieck Odyssey Spacecraft NASA Project Engineer April 1970.
Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 DELTA CDR Permanent Magnet Avionics Changes Summary May 4, 2010 Timothy J. Urban / ESCG /
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Review of Helium Venting Analyses
ER-2 Briefing. ER-2 Specifications ER-2 Typical Flight Profile.
C2V2 Technical Requirements and Constraints
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Launch Procedures No-Go Criteria 1.Winds exceeding 10 knots steady from any direction 2.Cloud ceiling below 10,000 ft AGL 3.Data acquisition systems not.
Leland D. HillAMS-02 Phase II Flight Safety Review - May AMS-02 Safety Summary.
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
5-1 Constellation Space Suit System Government Capabilities and Facilities Crew and Thermal Systems Division.
GSFC 5 Space Technology “Tomorrow’s Technology Today” ST5 PDR June 19-20, 2001 Launch Vehicle Services Section 18.0 Clyde Woodall Launch Vehicle Manager.
1 AMS-02 Integration & Test Plans & Status Trent Martin 24 January, 2007.
Overview of AMS-02 Changes due the addition of the Permanent Magnet
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
SPHERES ISS Flight Preparation & Hardware Status 08 July 2002 Steve Sell Stephanie Chen
1 Observatory I&T and Launch Campaign Flow Greg Jones May 20, 2009 JWST-PRES
Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 Phase III PSRP / SRP Electronics Summary January 12, 2010 Timothy J. Urban / ESCG / Barrios.
May 21, 2009John MacKenty, STScI1 WFC3 SM4 Events and Current Status.
External Tank Arrives by Barge from MS. Vertical Assembly Building External Tank.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
1 AMS-02 Integration & Test Plans & Status Ken Bollweg/NASA John Heilig/JS Robert Becker/MIT 12 January, 2007 AMS JSC.
Proprietary BalloonWinds Update Author: Ivan Dors – UNH Presented By: Michael Dehring -- MAC 28 June 2006.
Mission Operations –Launch February 15, 2000 at 22:02:15 UTC = 14:02:15 PST –41 Days IOC and antenna deployment period –2 year science mission operations.
AMS-02 Integration Cables Status and Electrical Integrated Testing Status Tim Urban / ESCG January 10, 2007 Alpha Magnetic Spectrometer.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Payload Safety Review Plan and Issues Leland D. Hill.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Ground Safety Status.
AMS-02 Delta CDR Structural Analysis and Certification Process Carl Lauritzen Structural Analysis Lead Jacobs Engineering
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
Permanent Magnet Impacts to STS/ISS/MOD Chris Tutt 5 May 2010.
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Mission Integration OZ2/Winston J. Reid/(281) Page No. 1 International Space Station Alpha Magnetic Spectrometer-02 AMS-02 Ops TIM - Ops Assessment.
1 AMS-02 POCC & SOC MSFC, 9-Apr-2009 Mike Capell Avionics & Operations Lead Senior Research Scientist ISS: 108x80m 420T 86KW 400km AMS: 5x4x3m 7T 2.3+KW.
AMS-02 Ground Safety (Permanent Magnet) AMS-02 Design TIM May 5, 2010.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama BRIC-17 TIR Overview Aug 28, 2012 Tony Cox EO20.
CIR FOMA Calibration Crew 9/24/08 1:30 PRO-CIR ACT-CMD FOMA-BTL-CAL 1 CMD PRO-CIR DEACT-CMD 274 watts 402 watts274 watts This sequence powers CIR and correlates.
Johnson Space Center, Houston TX Assembly and Disassembly Training Urine Monitoring System (UMS) 1 Familiarization Material for Assembly Task Training.
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
MSG Seal Replacement Mission Scenario Pre-Pack List (SOC OCR – ULF 1.1) MSG Front Window Exchange MSG Glove Rings & Feed- through Install MSG.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
Robonaut Setup and Taskboard Training 5/2/2013 Curtis Kershner/ ER Dennis Bentson/
Chip Scale Atomic Clock Contact Info: Captain Ruiz Perez (281) John Merk (617) Paige McClung (281)
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
CPCG-HM Overview POIWG July 26, 2012 Brittney Macon 1.
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
LCLS-II Technical Requirements
C50 Cavity pair Assembly Changes
SHUTTLE PROCESSING DISCOVER --- DISCOVERY
AVIATION 325 ELECTRICAL SYSTEM.
Presentation transcript:

KSC Ground Operations Timeline

KSC CGSE TIM A Technical Interchange Meeting regarding the Cryo Ground Support Equipment was held at KSC November 1 st through 3 rd, 2006 Numerous items were discussed and clarified including: –Both Off-line and On-line activities will be performed in the SSPF –Generation of preliminary timeline for KSC Ground Operations

Off-line Processing Overview of Off-line processing: –Unpack, –Mate upper/lower USS –Install EVA Interface Panel –Attach grapple fixtures and EVA handrails –Install Umbilical Mechanism Assembly (UMA) –Install Remotely Operated Electrical Umbilical (ROEU) and foldable arm –Cryo top-off (Restricted access/no integration activities) –Magnet Checkout –Avionics Systems checkout –Perform EBCS alignment w/ Lower USS

On-line Processing Overview of On-line processing (ISS Interfaces): –Installation into Cargo Element Work Station (CEWS) with 12 degree tilt –Mate ACASS to Payload Attach System (PAS) UMA active half to passive UMA (verify alignment) –Validate interfaces (command, telemetry, power) with Payload Rack Checkout Unit (PRCU)

STS Interfaces Shuttle Interface verification will need to be performed during the End to End test on the Pad –Facilities for checkout in SSPF have been being disassembled for some time –This includes all verification through ROEU

Initial Processing On-Dock at SSPF (L-14 weeks) Off-line ProcessingOn-line Processing L-10 weeksL-7 weeks L-49 days Canister loading Move to Canister w/ other Cargo Move to Vertical Processing Facility L-32 days

Processing Flow Vertical Processing Facility (VPF)

L-32 days L-30 days AMS in canister at VPF, Rotate Vertically, and Transfer to PCR STS Rollout to PAD and verification L-27 days L-24 days Weekend AMS Install Into PLB Weekend AMS Nominal Ground Ops (2000W via PDS, W to Vent Pump 1553 (C&C) + RS422) L-20 days S0024 Hazardous Prop Load AMS Power-down Weekend AMS Power-up AMS Nominal Ground Ops L-13 days L-6 days SFHe Top-off L-88 hours Weekend SFHe Top-off Complete L-80 hrs Cryo GSE Disconnected And removed (Clear PCR for PLBD Close) AMS Nominal Ground Ops L-30 min AMS to minimum Power (Monitor SFHe Status only, Cryocoolers/ Vacuum Pump off) L-9 min AMS Power-off L-9 days Ordinance Install (AMS powered) L/O Pre-launch Activity AMS End to End Test

Scrub Turnaround Planned Launch (L 1 ) L+1 hour (we may do Better) T0 Power On AMS Nominal Ground Ops Vacuum Pump and Cryocoolers On L/O L hr L-30 min L hr (estimated) AMS to minimum Power (Monitor SFHe Status only, Cryocoolers/ Vacuum Pump off) L-9 min AMS Power-off This scenario can be repeated up to 96 hours from first launch attempt (L 1 ) Typically, a maximum of four launch attempts are made prior to re-servicing, so one day may be maintained At AMS Nominal Ops without attempting a launch.

Scrub Turnaround (Recycle) De-Tank the Shuttle TSTS T S + 1 hr AMS Power Cryocoolers and Vacuum Pump on T S + 2 days PLBD Open T S + 2 days 8 hr PCR Access, Attach Cryo GSE And perform Top-off T S + 9 days L-88 hours Return to Pre-launch Activity Timeline