Nuclear Phase Transition Diagram Mar 1 2010RHIC Monday Meeting T. Satogata1 2007 DOE NSAC Long Range Plan … a whole page! (one out of 14)

Slides:



Advertisements
Similar presentations
Brookhaven Science Associates U.S. Department of Energy Todd Satogata 1 Fri May RHIC FY03 Deuteron-Gold Performance n RHIC Deuteron-Gold Performance.
Advertisements

Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
Experience and Projections for Low-Energy RHIC Operations Todd Satogata, Collider-Accelerator Department Workshop on Future Prospects in High Energy QCD.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
Machine - Experiments January 12, 2005 Machine status.
Machine-Experiments January 19, 2005 Machine status.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Low Energy operation of RHIC AGS low energy extraction performance N. Tsoupas et. al. BNL.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Parameter [units]Tune-up beam"low" chargehigh currenthigh charge Kin. injection energy [MeV]2.0 – Maximum beam energy [MeV]16 –
Prospects for RHIC Low-Energy Operations Todd Satogata (W. Fischer, T. Roser, A. Fedotov, N. Tsoupas, M. Brennan, C. Montag, and others) “Can We Discover.
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
RHIC Run14 Time Meeting. Run14 Status – June 24 Run14 He3-Au physics declared on 6/20 with Fill #18460; stochastic cooling is ON for Au beam, longitudinal.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
RHIC Low-Energy Au Test Run Summary Todd Satogata L. Ahrens, M. Bai, J.M. Brennan, D. Bruno, J. Butler, B. Christie, A. Drees, A. Fedotov, W. Fischer,
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 10 Start-up Status
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Experience and Projections for Low-Energy RHIC Operations Todd Satogata, Collider-Accelerator Department June 9, 2006 Motivated by discussions at the “Can.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
Turnaround time in modern hadron colliders & store-length optimization
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Alternative/complementary Possibilities
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Summary of Week 16 G. Arduini, J. Wenninger
FFAG Accelerator Proton Driver for Neutrino Factory
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
LHC (SSC) Byung Yunn CASA.
LHC Beam Operations Past, Present and Future
Summary Thursday h21: Stable beams fill #1303.
Another Immortal Fill….
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
MEIC New Baseline: Part 7
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Nuclear Phase Transition Diagram Mar RHIC Monday Meeting T. Satogata DOE NSAC Long Range Plan … a whole page! (one out of 14)

Apr Time Meeting T. Satogata2 Low Energy Parameters Au nom injection Au Au 2008/10 Au 2010  s NN [GeV] Baryochemical potential μ B [MeV] Beam energy [GeV/u] Beam kinetic energy [GeV/u] Relativistic  Relativistic  Momentum [GeV/c] Rigidity B  [T-m] RF harmonic number RF frequency [MHz] Max beam size (95%) [mm] Beam/ring time available--27/30.5h(1-2d?)4wks(2wks) Luminosity [x10 23 cm -2 s -1 ](20-80) (~10)(~30) RHIC full aperture at  max is 113 mm; at 7.7 GeV this is ±3.3 σ max (95%)  B from Andronic, Braun-Munzinger, Stachel, Nucl Phys A 772, 2006)

7.7 GeV Low Energy Program Schedule  Sun Apr 18 eve: AGS E=3.85 GeV/u setup (on synchro) Mon Apr 19: RHIC TPL, checkoff list in progress  Thu Apr 22 08:00  s NN =7.7 GeV start 12h+ maintenance: Q7/defoc sext reversals, RF work, etc First collisions seen early Fri Apr 23  ~Sat Apr 26: Start  s NN =7.7 GeV physics (4 weeks) Limited APEX: no RHIC beam above E~5 GeV/u Collisions at both STAR/PHENIX (h=369) Expected refills every ~20 min; event rates of “a few Hz” Will be using collimators for first time in low energy ops Will use refill time, # bunches, intensity to optimize lumi  Mon Apr 28: Resolve PHENIX DAQ clock problem Allows PHENIX to use all data, faster store turnaround Apr Time Meeting T. Satogata3

7.7 GeV Beam Intensity and Collisions Apr Time Meeting T. Satogata4 compressed air failure Yellow QLI Accidental hysteresis; Blue QLI Injection tuning

(Some) 7.7 GeV Low Energy Challenges  Tandem and Injectors High Tandem, injector availability/uptime required Tandem foils in MP7 were changed/refreshed in March Leaves little time for tuning, lowering losses, maxing lumi  Loss monitoring and radiation safety Will monitor losses daily, adjust operations as necessary Regular meetings to review, ensure that operations are localized and within safety limits  Luminosity monitoring Very low rates; clean collision signals from both detectors  Apertures, apertures, apertures AGS longitudinal, transverse emittances, collimation  No spring storms! Apr Time Meeting T. Satogata5

For Your Consideration…  Lower beta* Calculations indicate that 6-8m beta* might be feasible May give 20-40% integrated luminosity improvement Have to balance against beam losses in controlled areas  Moving to even shorter stores May give us 30-50% integrated luminosity improvement Requires loss review, impact evaluation by RSC  Collimation strategy is evolving Balance between injection efficiency, loss localization Perhaps a 10-20% integrated luminosity effect  Optimizing store turnaround time Shortening AGS cycle, minimize refill tuning Apr Time Meeting T. Satogata6