PIC port d’informació científica DateText1 November 2009 (Elena Planas) PIC Site review.

Slides:



Advertisements
Similar presentations
Pennsylvania Banner Users Group 2008 Fall Conference IUP Banner Server Environment Jeff Montgomery.
Advertisements

Computing Infrastructure
IWR Ideen werden Realität Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Institut für Wissenschaftliches Rechnen Status of Database Services.
Chris Brew RAL PPD Site Report Chris Brew SciTech/PPD.
© 2010 VMware Inc. All rights reserved Confidential Performance Tuning for Windows Guest OS IT Pro Camp Presented by: Matthew Mitchell.
Computer Cluster at UTFSM Yuri Ivanov, Jorge Valencia.
SUMS Storage Requirement 250 TB fixed disk cache 130 TB annual increment for permanently on- line data 100 TB work area (not controlled by SUMS) 2 PB near-line.
Denny Cherry MVP, MCSA, MCDBA, MCTS, MCITP.
Database Hardware Resources at Tier-1 Sites Gordon D. Brown Rutherford Appleton Laboratory 3D/WLCG Workshop CERN, Geneva 11 th -14 th November 2008.
0 AdvOSS is a Canadian company and a developer and vendor of different high technology solutions for Communications Service Providers. 0 Target Markets.
Introduction to DoC Private Cloud
1 RAL Status and Plans Carmine Cioffi Database Administrator and Developer 3D Workshop, CERN, November 2009.
BNL Oracle database services status and future plans Carlos Fernando Gamboa RACF Facility Brookhaven National Laboratory, US Distributed Database Operations.
THE QUE GROUP WOULD LIKE TO THANK THE 2013 SPONSORS.
Castor F2F Meeting Barbara Martelli Castor Database CNAF.
Database Services for Physics at CERN with Oracle 10g RAC HEPiX - April 4th 2006, Rome Luca Canali, CERN.
Technology Expectations in an Aeros Environment October 15, 2014.
Fermilab Oct 17, 2005Database Services at LCG Tier sites - FNAL1 FNAL Site Update By Anil Kumar & Julie Trumbo CD/CSS/DSG FNAL LCG Database.
CERN - IT Department CH-1211 Genève 23 Switzerland t The High Performance Archiver for the LHC Experiments Manuel Gonzalez Berges CERN, Geneva.
ASGC 1 ASGC Site Status 3D CERN. ASGC 2 Outlines Current activity Hardware and software specifications Configuration issues and experience.
Luca Canali, CERN Dawid Wojcik, CERN
Service Review and Plans Carmine Cioffi Database Administrator and Developer 3D Workshop, Barcelona (ES), April 2009.
CERN - IT Department CH-1211 Genève 23 Switzerland t Tier0 database extensions and multi-core/64 bit studies Maria Girone, CERN IT-PSS LCG.
NCICB Systems Architecture Bill Britton Terrapin Systems LPG/NCICB Dedicated Support.
Indiana University’s Name for its Sakai Implementation Oncourse CL (Collaborative Learning) Active Users = 112,341 Sites.
Databases at TRIUMF Andrew Wong CANADA’S NATIONAL LABORATORY FOR PARTICLE AND NUCLEAR PHYSICS Owned and operated as a joint venture by a consortium of.
Hosting on a managed server hosted by TAG  No technical support required  Full backup of database and files  RAID 5 system means that if a hard drive.
ScotGRID:The Scottish LHC Computing Centre Summary of the ScotGRID Project Summary of the ScotGRID Project Phase2 of the ScotGRID Project Phase2 of the.
CASTOR Databases at RAL Carmine Cioffi Database Administrator and Developer Castor Face to Face, RAL February 2009.
JLab Scientific Computing: Theory HPC & Experimental Physics Thomas Jefferson National Accelerator Facility Newport News, VA Sandy Philpott.
RAL Site Report Andrew Sansum e-Science Centre, CCLRC-RAL HEPiX May 2004.
Manchester HEP Desktop/ Laptop 30 Desktop running RH Laptop Windows XP & RH OS X Home server AFS using openafs 3 DB servers Kerberos 4 we will move.
D0 Taking Stock 11/ /2005 Calibration Database Servers.
Architecture and ATLAS Western Tier 2 Wei Yang ATLAS Western Tier 2 User Forum meeting SLAC April
ITEP computing center and plans for supercomputing Plans for Tier 1 for FAIR (GSI) in ITEP  8000 cores in 3 years, in this year  Distributed.
CERN - IT Department CH-1211 Genève 23 Switzerland t Oracle Real Application Clusters (RAC) Techniques for implementing & running robust.
The DCS lab. Computer infrastructure Peter Chochula.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Implementation of a reliable and expandable on-line storage for compute clusters Jos van Wezel.
HEP Computing Status Sheffield University Matt Robinson Paul Hodgson Andrew Beresford.
CERN Database Services for the LHC Computing Grid Maria Girone, CERN.
1 D0 Taking Stock By Anil Kumar CD/LSCS/DBI/DBA June 11, 2007.
ClinicalSoftwareSolutions Patient focused.Business minded. Slide 1 Opus Server Architecture Fritz Feltner Sept 7, 2007 Director, IT and Systems Integration.
Cloud Servers. What is a Cloud Server?  A Server that is accessed via the internet.
Drupal Service: Infrastructure Update 2 Marek Salwerowicz Sergio Fernandez ENTICE Meeting
GridKa Cloud T1/T2 at Forschungszentrum Karlsruhe (FZK)
BNL Oracle database services status and future plans Carlos Fernando Gamboa, John DeStefano, Dantong Yu Grid Group, RACF Facility Brookhaven National Lab,
Maria Girone CERN - IT Tier0 plans and security and backup policy proposals Maria Girone, CERN IT-PSS.
BaBar Cluster Had been unstable mainly because of failing disks Very few (
CNAF Database Service Barbara Martelli CNAF-INFN Elisabetta Vilucchi CNAF-INFN Simone Dalla Fina INFN-Padua.
LHC Logging Cluster Nilo Segura IT/DB. Agenda ● Hardware Components ● Software Components ● Transparent Application Failover ● Service definition.
FroNtier Stress Tests at Tier-0 Status report Luis Ramos LCG3D Workshop – September 13, 2006.
PIC port d’informació científica Luis Diaz (PIC) ‏ Databases services at PIC: review and plans.
Ismayilov Ali Institute of Physics of ANAS Creating a distributed computing grid of Azerbaijan for collaborative research NEC'2011.
Evangelos Markatos and Charalampos Gkikas FORTH-ICS Athens, th Mar Institute of Computer Science - FORTH Christos.
Database Project Milestones (+ few status slides) Dirk Duellmann, CERN IT-PSS (
BNL dCache Status and Plan CHEP07: September 2-7, 2007 Zhenping (Jane) Liu for the BNL RACF Storage Group.
PADME Kick-Off Meeting – LNF, April 20-21, DAQ Data Rate - Preliminary estimate Tentative setup: all channels read with Fast ADC 1024 samples, 12.
Database Requirements Updates from LHC Experiments WLCG Grid Deployment Board Meeting CERN, Geneva, Switzerland February 7, 2007 Alexandre Vaniachine (Argonne)
Sql Server Architecture for World Domination Tristan Wilson.
Towards Dynamic Database Deployment LCG 3D Meeting November 24, 2005 CERN, Geneva, Switzerland Alexandre Vaniachine (ANL)
Brief introduction about “Grid at LNS”
Cluster Status & Plans —— Gang Qin
Cluster Active Archive
HIGH-PERFORMANCE COMPUTING SYSTEM FOR HIGH ENERGY PHYSICS
NGS Oracle Service.
Scalable Database Services for Physics: Oracle 10g RAC on Linux
Oracle Storage Performance Studies
Scalable Database Services for Physics: Oracle 10g RAC on Linux
Cloud Computing Architecture
Presentation transcript:

PIC port d’informació científica DateText1 November 2009 (Elena Planas) PIC Site review

PIC port d’informació científica Review Hardware resources –Servers –Storage 3D Databases –Storage distribution –General info Plans DateText2

PIC port d’informació científica Hardware resources for DB services DateText3 Produccion Servers –9 nodes hosting oracle databases : Linux RedHat bits Fujitsu siemens: Primergy Advanced Blade Ecosystem BX600 8 G RAM QuadeCore intel CPU 1,6GHz –1 DIRAC mysql server : Scientific Linux CERN SLC release 4.6 (Beryllium) ‏ Dell 1850 QuadeCore Intel(R) Xeon(TM) CPU 3.20GHz 4 G RAM –1 FroNTier & Squid server : Scientific Linux SL 5.2 (Boron) 64 bits Power Edge SC Intel Xeon CPUs 3,2GHz 4 G RAM

PIC port d’informació científica Hardware resources for DB services Storage –20TB on NetApp fas3040 for data LUNs Redundant FC connections Failover between two controllers 70 disks of 280GB 6 spare disks + 4 parity disks + 4 double parity disks Efective space  12,4TB –13TB on fas270 for backup LUNs 21 disks of 621GB 2 spare disks + 2 parity disks + 2 double parity disks Efective space  7,7TB DateText4

PIC port d’informació científica 3D databases - Space distribution DateText5

PIC port d’informació científica 3D Databases DBRAC Nodes Oracle Version ASM Data diskgroup UsedASM Backup diskgrou p Used ATLAS ,5TB9%4,2TB30% LHCb ,5TB1%2TB40% LFC GB10%400GB75% FTS GB50%500GB60% DateText6

PIC port d’informació científica Plans Hardware plans –During 2009/2010, there is no plan to upgrade any cluster yet. –The actual performance is good. We are monitoring the servers and if we detect some increase of CPU or Memory usage, we’ll plan to add more resources. FroNTier server load is being reviewed to assess the need of moving the service to another server. Other plans –For security reason, we’ll change ATLAS listener port from 1521 to another. –We are evaluating different options to allocate 3TB to 5TB for a TAGS DB creation. DateText7