1905 NW Thurman St Bridge
Project Location
Thurman St Bridge
1904 Oregonian Article
Balch Creek 160 ft span60 ft span
Portland’s Historic 1905 Thurman St. Bridge Oldest Bridge, National Register Eligible
Portland’s Antique Thurman St Bridge
Portland’s Handmade Thurman St Bridge
Two Lane Bridge plus sidewalks
Thurman St Bridge Structure Riveted Steel Floor Beam Timber Deck Planks Timber SidewalkTimber Stringers Steel Trusses
Sidewalk overheadRoadway Overhead Riveted Steel Floor Beam
Timber Stringers and Riveted Steel Beam in deteriorating condition
Pavement in Poor Condition
Timber Sidewalk in Poor Condition
Chain Link Rail in Ugly Condition Traffic Rail Substandard
Existing Water Line on Bridge serving Willamette Heights
Thurman Weight Restricted 40,000lbs; 60,000lbs.
Bridge Load Rating results Inadequate Timber Stringers Inadequate Riveted Steel Floor Beams Trusses are Adequate
Replace Members & Deck Keep Trusses & Towers Replace Deck & Superstructure
Replace Members & Deck
Bridge Repair Scope of Work Replace timber stringers with new steel wide flange members Replace riveted floor beam with new steel wide flange beam Replace timber deck with steel deck in-filled with asphalt Replace wood sidewalk Existing trusses satisfactory
New Bridge Superstructure
New Waterline New Traffic RailNew Pedestrian Rail New Slip Resist Sidewalk New Pavement
Bridge Closed During Construction months. Detour in effect.
Macleay Park Open during Construction
Funding Summary Local Highway Bridge Program Funding Federal Contribution$3,392, City Contribution (10.27%)$ 388, Total Project Funding$3,781,000.00