US Planck Data Analysis Review 1 Peter MeinholdUS Planck Data Analysis Review 9–10 May 2006 LFI Integration and Test Support.

Slides:



Advertisements
Similar presentations
Network Systems Sales LLC
Advertisements

Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Status update of ASM on Swarm Charlie Swarm 4th DATA QUALITY WORKSHOP 2 December 2014 GFZ Potsdam Jean-Michel Léger.
Software Defined Radio Testbed Team may11-18 Members: Alex Dolan, Mohammad Khan, Ahmet Unsal Adviser: Dr. Aditya Ramamoorthy.
Manufacturing Productivity Solutions Management Metrics for Lean Manufacturing Companies Total Productive Maintenance (T.P.M.) Overall Equipment Effectivity.
© Paradigm Publishing, Inc Chapter 10 Information Systems Chapter 10 Information Systems.
Solar-B FPP 1 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS The TRACE Model for Operations Ted Tarbell
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
T24 Wireless Telemetry Advanced Intelligent Instrumentation.
© 2005 by Prentice Hall Chapter 4 System Testing & Implementation Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F. George Joseph.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
 QUALITY ASSURANCE:  QA is defined as a procedure or set of procedures intended to ensure that a product or service under development (before work is.
ENVIRONMENTAL DATA MANAGEMENT & SHALE GAS PROGRAMS INTERNATIONAL PETROLEUM ENVIRONMENTAL CONFERENCE NOVEMBER 14, 2013.
LSU 10/09/2007System Design1 Project Management Unit #2.
NVLAP Overview and Accreditation Process March 2006.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
November 2009 Network Disaster Recovery October 2014.
REDCap Overview Institute for Clinical and Translational Science Heath Davis Fred McClurg Brian Finley.
26-28 th April 2004BioXHIT Kick-off Meeting: WP 5.2Slide 1 WorkPackage 5.2: Implementation of Data management and Project Tracking in Structure Solution.
Bringing your technology to life…
Smart Monitoring © 2008 Applera Corporation and MDS Inc.
Hall D Online Data Acquisition CEBAF provides us with a tremendous scientific opportunity for understanding one of the fundamental forces of nature. 75.
LIGO-G E ITR 2003 DMT Sub-Project John G. Zweizig LIGO/Caltech Argonne, May 10, 2004.
Water | Slide 1 of Water for Pharmaceutical Use Part 3: Operational considerations Supplementary Training Modules on Good Manufacturing Practice.
Plenary meeting 2015 – Chania - Crete CASCADE Data Services Yusuf Yigini, Panos Panagos, Martha B. Dunbar Joint Research Centre - European Commission.
Computing Fundamentals Module Lesson 19 — Using Technology to Solve Problems Computer Literacy BASICS.
Planck, an ESA mission scheduled for launch in 2007, is the third generation of CMB anisotropy space mission planned to fully map the sky emission with.
US Planck Data Analysis Review 1 Peter MeinholdUS Planck Data Analysis Review 9–10 May 2006 Where we need to be 2 months before launch- Instrument view.
Module 7 Session 7.3 Visual 1 Module 7 Planning and Scheduling with the Critical Path Method Session 7.3 The computer and project management.
9,825,461,087,64 10,91 6,00 0,00 8,00 Information and Communication Networks HiPath ProCenter Compact.
1 Experience-Driven Process Improvement Boosts Software Quality © Software Quality Week 1996 Experience-Driven Process Improvement Boosts Software Quality.
LIGO-G9900XX-00-M ITR 2003 DMT Sub-Project John G. Zweizig LIGO/Caltech.
Description of Work Objectives WP 8 serves to define the technical content of the VI for contact thermometry. It will contain a selection of guides to.
US Planck Data Analysis Review 1 Christopher CantalupoUS Planck Data Analysis Review 9–10 May 2006 CTP Working Group Presented by Christopher Cantalupo.
Portable Broadband Seismic Stations - Checking Data Quality Cairo, Egypt November, 2009 Noel Barstow Bruce Beaudoin Marcos Alvarez.
The Role of Data Quality in S5 Burst Analyses Lindy Blackburn 1 for the LIGO Scientific Collaboration 1 Massachusetts Institute of Technology, Cambridge,
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
REDCap Overview Institute for Clinical and Translational Science Heath Davis Fred McClurg Brian Finley.
DPC SGS-IR – ESTEC – January 2007 Luca Stringhetti – IASF Bologna On behalf of LFI Instrument Operation Team And On Behalf of G. Morgante – IASF.
Planck Science Team – UniMi-Milano – 02 – 04 November 2005 Andrea Zacchei / Davide Maino Planck ST #25 – UniMi, November 2005 Inputs from: SISSA,
Toward a Multi-State Consensus on Rural Intersection Decision Support: Objectives u Gain understanding of issues involved with national rural intersection.
11 Mayview Regional Service Area Plan (MRSAP) Tracking: Supporting Individuals in the Community June 18, 2008.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
The Planck Satellite Hannu Kurki-Suonio University of Helsinki Finnish-Japanese Workshop on Particle Cosmology, Helsinki
Web-Based Delivery of the First Course in Power Electronics Amman – Jordan December Issa Batarseh School of Electrical Engineering and Computer Science.
Installation and Maintenance of Health IT Systems Unit 8b Troubleshooting; Maintenance and Upgrades; and Interaction with Vendors, Developers, and Users.
Communications Plan: Ji Young Kim, Chul Han Song, Saewung Kim, and Jim Crawford.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Library Online Resource Analysis (LORA) System Introduction Electronic information resources and databases have become an essential part of library collections.
SSC Support for Sim #3 Archived MOC Data Products, and distributed via web. –Level-0 telemetry files organized by year and month –SPICE orbit and attitude.
16 February 2011Ian Brawn1 The High Speed Demonstrator and Slice Demonstrator Programme The Proposed High-Speed Demonstrator –Overview –Design Methodology.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
Installation and Maintenance of Health IT Systems Unit 8a Troubleshooting; Maintenance and Upgrades; and Interaction with Vendors, Developers, and Users.
Using Technology to Solve Problems Unit 2 Mod 2 SO 7.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
V7 Foundation Series Vignette Education Services.
EKT 313 ELECTRONICS COMMUNICATION Lecturer: MOHAMAD SUHAIZAL BIN ABU HASSAN Contact #: / Office: Bilik.
REDCap General Overview
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
Chapter 6: Database Project Management
Fundamentals of Information Systems, Sixth Edition
Workshop.
Atmospheric phase correction for ALMA
Computer Literacy BASICS
PSS verification and validation
Instrument Overview Larry Springer HMI Program Manager
Maria Teresa Capria December 15, 2009 Paris – VOPlaneto 2009
Presentation transcript:

US Planck Data Analysis Review 1 Peter MeinholdUS Planck Data Analysis Review 9–10 May 2006 LFI Integration and Test Support

2 US Planck Data Analysis Review 9–10 May 2006Peter Meinhold 2 LFI Radiometer Hardware Flow

3 US Planck Data Analysis Review 9–10 May 2006Peter Meinhold 3 US team Rodrigo Leonardi-UCSB –Summary(final) analyses of 30, 44 and 70 GHz RCA tests, QM and FM –Development of dedicated IDL tools for instrument characterization –Testing of ‘LIFE’ software and contributions to LIFE modules –Testing of KST with RCA and RAA data. PRM-UCSB –Chairing 70 GHz ‘support tiger team’- technical support team –Critical analyses of all phases of test data –Test set and radiometer troubleshooting (remote and on site in Helsinki, JBO and Milan) –Primary contact with European instrument team. Todd Gaier-JPL –RF devices, export issues, NGST contacts –RCA troubleshooting Michael Seiffert-JPL –Detailed RCA modeling –Test analyses –LFI System analyses and debugging/systematic effects

4 US Planck Data Analysis Review 9–10 May 2006Peter Meinhold 4 Achievements past year The US role has been to provide experience and scientific input to the nuts and bolts of the Radiometer test campaigns. Our contributions focus on –Making sure test campaigns cover critical measurements:developing test procedures. –Developing analysis tools and metrics to determine radiometer performance –Cross checking test data sets independently –Diagnosing and helping solve problems with radiometers and test systems: Thermal, Electrical, RF and software. –Assisting onsite at JBO, Ylinen electronics and Laben in RCA and RAA test campaigns Built a simulator using test data for developing real-time analysis tools and daily reports, demonstrated KST capabilities for some LFI data analysis, participated in testing and development of LIFE analysis tools Developing detailed summary of final test data for LFI Instrument Model- input to Level S and pipeline We identified and helped solve a number of major problems at QM and FM, RCA and RAA levels, some samples: –Noise resolution issues with 30/44 GHz QM and particularly with the 70 GHz FM RCA test campaigns –Debugging of initial LFI RAA data streams, filtering errors and EMC. –Investigation into ‘spikes’ in 70 GHz RCA RM and RAA QM data sets. –Oscillation problem 44 GHz Back End Modules. Publications on LFI I+T campaigns (Bersanelli et al, Menella et al, Tomasi et al) include US team.

5 US Planck Data Analysis Review 9–10 May 2006Peter Meinhold 5 European connections Major advances in the past year in interfaces within LFI –Multiple visits to Laben, Helsinki, JBO –Use of common tools (LIFE) across LFI to analyze common data sets –Readily available data from all test campaigns via FTP –Weekly telecons, web logs and active communications Large increase in sophistication of the whole LFI instrument team –Multiple analyses of current data sets occur (typically Bologna, UCSB, Helsinki) –Distribution of instrument experience around the team (Torsti Poutanen, Maura Sandri, Luca Terenzi, Francesco Cuttaia, Paola Battaglia, Mikko Laaninen...many more.)

6 US Planck Data Analysis Review 9–10 May 2006Peter Meinhold 6 Plans for Next Year Support LFI FM RAA campaign about to start in Laben. –PRM to spend 1-2 weeks, RL hopefully much more –Near real time remote analysis at both JPL and UCSB, primarily noise performance estimation and troubleshooting. –Development of tools for realtime reporting, to be extended for flight operations. We will support the Alcatel test phase as well in similar fashion. Analysis of ground test database –Some anomalies still being investigated. –Critical analysis of bandpasses particularly 70 GHz) and calibration –Development of a complete integrated picture of the instrument, for the instrument model and pipeline analysis. –Work with Italian team to develop CPV phase plans and inflight tuning methods Parallel effort to integrate instrument experience in LFI pipeline development –Systematic errors, Calibration issues, Polarization calibration, offsets etc –Instrument model –Reporting and simulation Significant effort to maximize overlaps with US HFI instrument team