Project Review of P09271 Aaron Heyman Abe Taleb Adam Cook Jose Rodriguez Spring 2009 DISTRIBUTION CAPACITY ANALYSIS AND PROCESS IMPROVEMENTS AT.

Slides:



Advertisements
Similar presentations
1 Distribution Capacity Analysis P09721 MSD II Final Presentation Distribution Capacity Analysis P09721 MSD II Final Presentation Aaron Heyman – Lead Jose.
Advertisements

WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
Business Mentors Leadership and Business Development Summit April 28, 2011 Presented By: David Ellings The Sajzel Group, Inc. LEVERAGING YOUR LEADERSHIP.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
Computer Engineering 203 R Smith Project Tracking 12/ Project Tracking Why do we want to track a project? What is the projects MOV? – Why is tracking.
Aditya Manjrekar Industrial and Systems Engineering KGCOE, RIT.
25 Mar 10 – WDM 204 – Session Two. Cape Area Management Program (CAMP) Sponsored by the Cape & Islands Workforce Investment Board.
Process Improvement Ideas Abe Taleb José G. Rodríguez.
Transportation and Warehouse Planning Systems Byron Flores Bus M. 462 April 12, 2010.
Mid-Quarter Design Review April 7, 2009 Aaron Heyman Adam Cook.
Process Improvement Ideas Abe Taleb José G. Rodríguez.
Chapter 6 Prototyping, RAD, and Extreme Programming
Meet the Team Aaron Heyman  5 th Year Industrial Engineer  Team Lead Adam Cook  5 th Year Industrial Engineer Jose Rodriguez  5 th Year Industrial.
Distribution Capacity Analysis P09721 MSD 1 Project Review Aaron Heyman – Lead Jose Rodriguez Adam Cook Abraham Taleb Sponsor: CooperVision.
Hilton Maher Selto. Activity-Based Management McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
Validating and Improving Test-Case Effectiveness Author: Yuri Chernak Presenter: Lam, Man Tat.
Meet the Team Abraham Taleb  4 th Year Industrial Engineer Jose Rodriguez  5 th Year Industrial Engineer Aaron Heyman  5 th Year Industrial Engineer.
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
1/9/09 System Level Design Review January 16, 2009 Aaron Heyman – Lead Adam Cook Jose Rodriguez Abraham Taleb.
Readiness Index – Is your application ready for Production? Jeff Tatelman SQuAD October 2008.
Value Stream Mapping.
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
1. Learning Outcomes At the end of this lecture, you should be able to: –Define the term “Usability Engineering” –Describe the various steps involved.
Property Custodian Meeting July 10, Review of USM Internal Auditor Findings  Excerpt from the USM Internal Auditors report dated May 31, 2012:
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Project Management Week 2 Day 2.
Operations and Supply Chain Management
S/W Project Management
IntelliTrack ® WMS An Overview and Approach Powerful, Full Featured, Affordable.
Managing the development and purchase of information systems (Part 1)
Group 8: Shenanigans Mike Ostrowski Josh Patsey Michelle Boomer Tom Parks Levent Niazi.
© Copyright 2010 Dresser-Rand Gasket Cell Relocation [Revision: May, 2011] Team Members: Cody Willmart, Aaron Marcotte, Jacky Li, Daniel Swol, Tyler Borden.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Site Networking Anna Jordan April 28, 2009.
1 ADVANCED MICROSOFT EXCEL Lesson 9 Applying Advanced Worksheets and Charts Options.
As Class Convenes l Find your team’s table and have a seat l Pick up Team’s Modeling Folder l Remove Chapter 1 Assignment l Place your Chapter 2 Assignment.
5-1 D M A C I efine: This stage lays out the goals of a process improvement project that are consistent with both the organization and the customer’s needs.
S9k Production Floor System Ingredient Inventory Production Inventory Production Dashboard.
Chapter 6 Prototyping, RAD, and Extreme Programming Systems Analysis and Design Kendall & Kendall Sixth Edition.
CMSC 345 Fall 2000 Requirements Overview. Work with customers to elicit requirements by asking questions, demonstrating similar systems, developing prototypes,
Chapter 10 Verification and Validation of Simulation Models
1 LSSG Green Belt Training Improve: How do we get there?
Verification & Validation. Batch processing In a batch processing system, documents such as sales orders are collected into batches of typically 50 documents.
Multi-company Project Management applied to Manufacturing Improvement
Requirements Validation
PROJECT NAME EMPIRE BELT(S) Month Day, Year. 2 Agenda Lean Overview Introduction to the Project & Team The Process Next Steps.
Inaccurate Cycle Billing Records in OMD - Northeast Black Belt: Jim Palmer Division: Operations/Northeast BU – Steering Comm Presentation.
Project Chiron SMU TEAM ALCON
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Continual Service Improvement Methods & Techniques.
44222: Information Systems Development
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Best Practices Consortium
TM 720: Statistical Process Control DMAIC Problem Solving
Six-Sigma : DMAIC Cycle & Application
Best Practices Consortium
Analytical Tools for Process Analysis and Improvement
Best Practices Consortium
Chapter 10 Verification and Validation of Simulation Models
DMAIC Analyze, Improve, Control
Project Chiron SMU TEAM ALCON
CHAPTER 10 METHODOLOGIES FOR CUSTOM SOFTWARE DEVELOPMENT
Advanced Product Quality Planning 2nd Edition
Project Chiron SMU TEAM ALCON
King Saud University College of Engineering IE – 462: “Industrial Information Systems” Fall – 2018 (1st Sem H) Introduction (Chapter 1) part.
TIME BASED COMPETITION
Advanced Product Quality Planning 2nd Edition
Presentation transcript:

Project Review of P09271 Aaron Heyman Abe Taleb Adam Cook Jose Rodriguez Spring 2009 DISTRIBUTION CAPACITY ANALYSIS AND PROCESS IMPROVEMENTS AT

Agenda Background Needs and Specs Review of MSD II Goals Capacity Analysis Tool Execution & Validation Results Process Improvement Lessons Learned

Overview Capacity & Labor Analysis Process Improvements

4 Project Description Problem Statement: What is the maximum # of orders/lines/units this facility can process in a given time period based on the current equipment/software? Processes In Scope: Receiving > Put Away > Replenishment > Picking > Packing > Shipping Pick and pack were the areas of focus

5 Customer Need # ImportanceDescriptionComments/Status CN15The time required to train users is minimal.Met CN25The computer tool is user friendly.Met CN33 The computer tool is able to be upgraded and/or modified in the future. Met CN45The computer tool represents the real world.Met CN53The computer tool identifies invalid data inputs.Met CN61The computer tool executes commands quickly.Met CN73 The computer tool alerts the user when a given demand input is not realizable given actual capacity. Met CN83 The computer tool allows the user to visualize all the information on a single screen. Met CN93 The computer tool provides the option to print a report of the output. Met Customer Needs Importance Scale: 5= Must Have 3= Nice To Have 1= Preferential

6 Metrics & Specifications Engineering SpecificationsMetrics 1The training time is less than 30 minutes.Training Time 2The computer tool is user friendly.Ease of use 3The computer tool is able to be upgraded and/or modified in the future.Flexibility 4The system represents the real world.Validity Test 5The system identifies invalid data inputs.Ease of use 6The system executes a command in no more than 0.25 minutes.Execution Time 7The system alerts the user when a given demand input is not realizable given actual capacity.Validity Test 8The computer tool allows the user to visualize all the information on a single screen.Validity Test 9The computer tool provides the option to print a report of the output.Validity Test Table 1.1 Relationship of customer needs to metrics Target Specifications Metrics Need Nos.Importance Units Ideal ValueMarginal value 1Training Time15Minutes<30<60 2Ease of use2,55Subjective53 3Flexibility33BinaryYes 4Validity Test4,7,8,91BinaryPass 5Execution Time61Minutes Table 1.2 Target Specifications Importance Scale: 5= Must Have 3= Nice To Have 1= Preferential Binary: Pass or Fail.

Review of MSD II Goals from MSD I Add Pack area to computer tool Validate computer tool through historical data and on floor trials Turn computer tool over to customer for implementation Identify process improvement opportunities and present to customer Implement desired process improvement projects

What did we do? Capacity Analysis Tool (CAT) rev 3.4 Calculates the labor hours needed to process a given demand for Pick and Pack Within 1% and 2% respectively Calculated current maximum throughput for facility Approximately 114,000 lines Current demand is around 55,000 lines

Execution of Plan Week 1Week 2Week 3Week 4Week 5Week 6Week 7Week 8Week 9Week 10 Get Pack data Add Pack to ModelRevise Pack Model OVERALL CAPACITY Pack Formulas Model Complete Turn over to CV Validate Model On Floor Trials Revisions, Validate PackValidate Pack Identify Opportunities Document Ideas, Present to CustomerRevisions Implementation if desired Mid Quarter Presentation 75% Tech PaperIMAGINE RIT Final Presentation

Pack Labor & Individual Capacity Analysis Added pack labor hour calculations Unable to use Mean Time Between Failure, Mean Time to Repair due to lack of data Upper Bounds on Throughput based on maximum number of workers per area Used Excel Solver to maximize capacity, given the constraint on FTE’s

Verification and Validation How did we know the CAT was accurate? Used historical data Expert opinion from customer Pack was more difficult due to recent implementation of WFM

Results and Conclusions Pick Validation: Labor hours within 1% Pack Validation: Shrinking gap over past four weeks of data, currently within 2% Ability to determine needed labor for any given demand for facility Determined maximum orders that the Henrietta facility can process in its current state

Process Improvements

ADM Kaizen Initial meeting April 17, :00 am People present Inventory control Replenishment personnel ADM operators Pick Supervisors RIT Students Meeting was very productive, everyone contributed with good suggestions and critiques.

Ideas Discussed Ideas discussed Single label with color coding, and barcode included Two labels: one with barcode and another with three digits and colors

Ideas Discussed Re-slotting carton flow racks Incorporate a flag system v.s.

Meeting Conclusions Single label with barcode Re-slotting carton flow racks, not agreed The benefits obtained from this are not so large when compared to the effort to be invested Flags are to be incorporated only for the high movers as having 500 flags will drive operators crazy

Final Label Design Two sizes, one for ADM and one for carton flow racks If white background is allowed next to barcode, number of colors can increase

Cost/Benefit Analysis Assumptions Define a defect as replenishing a slot in the ADM with wrong product. Considered only locations with <95% accuracy Sample cycle counted is representative of the state of whole system Labor costs $10/hr Assume 920 slots currently being used

Cycle Count ADM - Results # of locations<95% accurate# of Locations <95% Nov %147.2 Dec %156.4 Jan %184 Feb %303.6 Total defects791.2 Costs - Results Number of defects (1)792 Number of hours per defect (2)0.4 Cost of labor hour (3) $ Total cost of defects (1x2 x3) $ 3, Time spent on a single defect Time (mins) 2Packing defect recognition 3Packing notifies the search and rescue team 12Fill out form and travel to and from ADM to pick the right product 2Repack the order 5Check the slot that contained the wrong product potentially remove items that are not supposed to be there. TOTAL minutes per defect 24 Cost of labels $ 1, Cost of defects $ 3, Payback period (months)4.55 Cost/Benefit Analysis

Implementation Plan If approval is not obtained within timeframe, transition document will be developed. If approval is obtained in time and product is received before Thursday may 14th, the implementation will be executed. To minimize potential errors, no two stickers will be removed at the same time.

ADM Replenishment Flags Solution that all parties want but difficult to implement Other Solutions involved showing the current levels of all channels Idea for spring activated flag was generated but mechanics are difficult Advantage would be flag would only show when current channel needed product. Refilling channels before they become empty would increase productivity

Current Prototype

Shipping Conveyor Kaizen Event The Shipping Conveyor Kaizen was attended by representatives from packing, shipping and engineering. Quick decision was made to add Spring-loaded bottoms to re- sort bins, especially in light of the recent injuries. Discussion of mechanical solution lead to mostly dead ends. Most solutions have been tried before (Adding chutes instead of rollers, speeding up/down conveyors).

Shipping Conveyor Kaizen Event The final discussion focused on boxes being placed on the conveyor incorrectly Lisa defended that it is difficult to place the box correctly every time with the expectation to ship so many orders per hour Solution was generated to remind packers at weekly meetings to place boxes label side up and vertically oriented

Shipping Conveyor Today Spring bottoms have arrived and installed in the re-sort bins UPS blue bins will be switched out of those locations and replaced with either red or green bin Labeling has also been designed for bin stating “DO NOT REMOVE” Movement of MTO to a spot on the shipping conveyor will go a long way to reduce the number of packed boxes that need resorted.

Lessons Learned Keep track of assignments in a long term way to make sure work is evenly distributed Because we are all IE’s and able to handle all the work if needed No real division of skills Project Manager was also a full contributor Difficult to establish timeline because of fluidity of project and time cushion Required a lot of feedback from customer, which led to some delays Split up into sub-teams during MSD I for better execution

Acknowledgements Sarah Pittman John Kaemmerlen Andres Carrano Jim Fiorino Jim Della Valle Mike Sixby Participants in the Kaizen Events