PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.

Slides:



Advertisements
Similar presentations
1 jNIK IT tool for electronic audit papers 17th meeting of the INTOSAI Working Group on IT Audit (WGITA) SAI POLAND (the Supreme Chamber of Control)
Advertisements

Making the System Operational
5/30/2012. Provides a method for finding services/data on the Exchange Network – discover data. Supports User Friendly Tools Can automatically collect.
U.S. Government Printing Office Packaging and Metadata PREMIS Implementers Panel Library of Congress June 13, 2007.
Transformations at GPO: An Update on the Government Printing Office's Future Digital System George Barnum Coalition for Networked Information December.
Fedora 3: A Smooth Migration Michael Durbin. The Scenario  New versions of software promise exciting new capabilities and improvements.  They also present.
14 October 2003ADASS 2003 – Strasbourg1 Resource Registries for the Virtual Observatory R.Plante (NCSA), G. Greene (STScI), R. Hanisch (STScI), T. McGlynn.
Network Shared Services. Shared Services –Network Authentication and Authorization Services –Exchange Network Discovery Service –Universal Description.
Tools and Services for the Long Term Preservation and Access of Digital Archives Joseph JaJa, Mike Smorul, and Sangchul Song Institute for Advanced Computer.
Presented by IBM developer Works ibm.com/developerworks/ 2006 January – April © 2006 IBM Corporation. Making the most of Creating Eclipse plug-ins.
Doug Nebert Senior Advisor for Geospatial Technology CSS, FGDC Secretariat.
Meaningful Use (MU) Cancer Registry Report Validation Tool Quick Guide Andrew McCaffrey National Institute of Standards and Technology November 29 th,
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
Cyberinfrastructure Status July, NSF reverse site visit Refactoring and cleanup after review preparations Coordinating Node technology changes.
TeraGrid Information Services December 1, 2006 JP Navarro GIG Software Integration.
RUP Fundamentals - Instructor Notes
2-3 April 2009PDS MC Rapid-prototyping tools. 2-3 April 2009PDS MC Rapid-prototyping tools Legend: Gray – Existing tool effort; White – Proposed tool.
1 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
Classic Data Access Training OPC Classic Compliance Test Tool Introduction to the OPC Compliance Test for OPC Classic Server Testing Press SPACE to advance.
PDSMC November 29-30, PDS Imaging Node PDS4 Migration Lisa Gaddis (USGS) Sue LaVoie (JPL) November 30, 2012 PDS Management Council Meeting UCLA.
PDS 2010 Project Update Dan Crichton MC Face-to-Face Washington DC March 25-26, 2010.
Greg Sullivan University of Maryland Data Filtering and Software IceCube Collaboration Meeting Monday, March 21, 2005.
11 SUPPORTING APPLICATIONS IN WINDOWS XP PROFESSIONAL Chapter 9.
1 Schema Registries Steven Hughes, Lou Reich, Dan Crichton NASA 21 October 2015.
PDS4 Tool Development Strategy PDS Management Council Meeting November 18, 2014 Dan Crichton.
PDS4 and Build 5a Update Dan Crichton, Emily Law November
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
PDS4 Project Report PDS MC F2F Columbia, MD Dan Crichton April 2-3,
Atmospheres Node Report Reta Beebe Nancy Chanover Lyle Huber Lynn Neakrase Jim Murphy Irma Trejo Matias Roybal Shannon Rees.
Data Standards and Build 3b Plans Steve Hughes MC Face-to-Face UCLA, Los Angeles, CA November 28-29, 2012.
SONIC-3: Creating Large Scale Installations & Deployments Andrew S. Neumann Principal Engineer, Progress Sonic.
PDS M/C August 2012 PPI Node Report PDS Management Council August 28-29, 2012 R. J. Walker S. P. Joy T.A. King J. Mafi.
EPA’s Water Quality Exchange (WQX) National Water Quality Monitoring Conference San Jose, California Kristen Gunthardt, US EPA Curtis Cude, OR DEQ.
System Design and Deployment Status PDS Management Council Face-to-Face UCLA, Los Angeles, California November 28-29, 2012 Sean Hardman.
Copyright © 2006 Pilothouse Consulting Inc. All rights reserved. Search Overview Search Features: WSS and Office Search Architecture Content Sources and.
Validation Tool (VTool) PDS Management Council Meeting Washington, D.C. November 2006
PDS M/C November 2012 PPI Data Migration Planning PPI PDS4 Data Migration Planning PDS Management Council November 28, 2012 T. King.
© 2008 by Shawn Spiars; made available under the EPL v1.0 | March 17, 2008 Case Study – Phurnace Software and RCP Shawn Spiars Lead UI Developer Phurnace.
Data Standards Development August 29, Topics 1.Current Status 2.What was delivered for Build 2c 3.How was IPDA supported 4.What mission support.
Software Development and Deployment PDS Management Council Face-to-Face Los Angeles, California August 26-27, 2014 Sean Hardman.
Development Report Engineering Node August 2006
System/SDWG Update Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
A Technical Overview Bill Branan DuraCloud Technical Lead.
The National Grants Partnership March 11, 2008 Michael Pellegrino
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
1 Object-Oriented Analysis and Design with the Unified Process Figure 13-1 Implementation discipline activities.
WebDat: A Web-based Test Data Management System J.M.Nogiec January 2007 Overview.
Software Development and Deployment PDS Management Council Face-to-Face Berkeley, California November 18-19, 2014 Sean Hardman.
Software and Systems Division “RTMMS IHE-PCD F2F WG meeting Kansas City, MO (Cerner) National Institute of Standards and Technology (NIST) John.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
PDS4 Demonstration Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
EPA’s Water Quality Exchange (WQX) Annual Exchange Network Users’ Meeting April 18-19, 2006.
Tools Report Engineering Node March 2007
PDS4 Deployment Planning (Discussion) PDS MC F2F Columbia, Maryland Dan Crichton August 28,
PDS4 Project Report PDS MC F2F UCLA Dan Crichton November 28,
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
International Planetary Data Alliance Registry Development and Coordination Project Report 7 th IPDA Steering Committee Meeting July 13, 2012.
IPDA PDS4 Report July 17, PDS4: The Next Generation PDS PDS4 is a PDS-wide project to upgrade from PDS version 3 to version 4 to address many.
International Planetary Data Alliance Registry Project Update September 16, 2011.
PDS 2010 System Design Report MC Face-to-Face Washington, DC March 25-26, 2010.
PDS4 Update Dan Crichton August 2014.
IPDA PDS4 Report PDS Team July 2015.
PDAP Query Language International Planetary Data Alliance
Applied Software Implementation & Testing
Technical update 05 of April 2017
ELECTRONIC DOCUMENT ACCESS OPERATIONAL REQUIREMENTS COMMITTEE MEETING
Overview Activities from additional UP disciplines are needed to bring a system into being Implementation Testing Deployment Configuration and change management.
Presentation transcript:

PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman

Topics Overviews Build 3a -Summary -Operational Deployment -RFA Status Build 3b -Summary -Planned Deployment -Search Service Status -Report Service Status Build 4a and Beyond Next Steps April 2-3, 2013PDS4 Build 3b System Readiness2

Overview Build 3a -Delivered on September 30, Test and deployment to operations at the EN in occurred in October Have been running side-by-side with PDS3 system -Deployed and exercised the software at many of the Nodes Build 3b -Delivered on March 31, Test and deployment to operations at the EN to occur in April Deployment to the Nodes commencing in late April 2013 April 2-3, 2013PDS4 Build 3b System Readiness3

Build 3a Summary Validate software in place supporting validation of PDS4 labels using XML Schema and Schematron files. Initial data access and transform software in place for working with PDS4 data. Harvest and Registry software in place to support EN and Node registration of PDS3 and PDS4 data. Search software in place supporting catalog- level search. Report software in place waiting to be populated with web logs. April 2-3, 2013PDS4 Build 3b System Readiness4

Build 3a Operational Deployment April 2-3, 2013PDS4 Build 3b System Readiness5

Build 3a Node Test Deployment April 2-3, 2013PDS4 Build 3b System Readiness6

Build 3a RFA Status 11 Accepted -Planned for Build 4a delivery 11 Implemented -Included in Build 3b delivery 3 Requires Follow-up -Additional information required, if accepted planned for Build 4a delivery 3 Closed -Questions about design approaches or software behavior, responded to in RFA document April 2-3, 2013PDS4 Build 3b System Readiness7

Build 3b Summary Search added support for discovering and viewing Bundle and Collection information. Search was modified to address inconsistent results when specifying more than one term or parameter in the search criteria. Registry was modified to address performance issues. Validate, Harvest, Catalog and Search modified to keep pace with data model changes. Updates to the Data Access and Transform tools are about two weeks from being delivered. April 2-3, 2013PDS4 Build 3b System Readiness8

Build 3b Planned Deployment April 2-3, 2013PDS4 Build 3b System Readiness9

Search Service Status Added support for discovering and viewing Bundle and Collection information. -This also includes a first cut at PDS4 Context products. Added support for filtering search results based on space agency and model version. -Will include ESA/PSA data sets officially with this release. Still working out the kinks involved with supporting PDS3 and PDS4 data side-by-side. Here is what it looks like … April 2-3, 2013PDS4 Build 3b System Readiness10

April 2-3, 2013PDS4 Build 3b System Readiness11

April 2-3, 2013PDS4 Build 3b System Readiness12

April 2-3, 2013PDS4 Build 3b System Readiness13

April 2-3, 2013PDS4 Build 3b System Readiness14

April 2-3, 2013PDS4 Build 3b System Readiness15

April 2-3, 2013PDS4 Build 3b System Readiness16

Report Service Status Sawmill software installed at the EN. -Upgraded to the latest version from the vendor. Working with a few Nodes on interfaces for pulling web logs. Ready to start moving forward with population of the service. Planned operational phases: -Initiate population of the service and initial report configuration (April/May 2013). -Generate PDS-wide web log reports. (June 2013) -Generate registry-based reports. (October 2013) April 2-3, 2013PDS4 Build 3b System Readiness17

Build 4a and Beyond Continue to support data model changes. Add support for content validation. Continue to tune the search index. Add support for product-level search. Add support for additional transformations. Add support for visualization. Better integrate search results with available tools and services. April 2-3, 2013PDS4 Build 3b System Readiness18

Next Steps Work with the Nodes on Report Service population. -I promise. Work with the Nodes to deploy Build 3b software locally. -Start registering some stuff. Continue Build 4a development. -Focus on product-level support including content validation, search, transformation and visualization. April 2-3, 2013PDS4 Build 3b System Readiness19

Questions/Comments