Common Deficiencies observed in the Project Proposals received at NRRDA.

Slides:



Advertisements
Similar presentations
PREPARATION AND SCRUTINY OF DETAILED PROJECT REPORTS AS PER NEW TEMPLATE Prof. B.P. Chandrasekhar Technical Advisor to APSRRDA GoAP.
Advertisements

Commissioning, Maintenance, and Troubleshooting
Financial Monitoring Techniques
Managing Construction Risks
Doc.: IEEE /1190r2 September 2014 Submission Kaiying Lv (ZTE) Frame Exchange Control for Uplink Multi-user transmission Slide 1 Date:
Rawdon Trust Land 220 acres Development partner sought Entered into 2012 SHLAA LCC entered parts of the land into the 2011 SHLAA Harrogate Rd Emmott Arms.
CHAPTER 21 Inferential Statistical Analysis. Understanding probability The idea of probability is central to inferential statistics. It means the chance.
Administrative Review Requirements September 17, 2014.
Proposal for Revised Timesheet and Status Report Entry Process Process Flow Charts Prepared by Werecat System Consultants
1 Southern Connecticut State University Graduate Council Academic Standards Committee Procedures for Southern Connecticut State University.
Software Engineering CSE470: Requirements Analysis 1 Requirements Analysis Defining the WHAT.
INTERNAL AUDITS OF LABORATORIES Sanjay S Shetgar 1.
Correlation & Regression
Status Report on Standard Specifications and Codes of Practice Department of Transport RPF November 2004.
Bridge Management New Bridge or Existing? New Design Conceptual Design Detailed Design Tender Preparation and Advertisement Construction Rehabilitation.
Integrated District Health Planning Madhya Pradesh.
CHE 165 Plant Design Introduction. Greensheet Review  Target is Study –Reported Verbally and in Text –Consists of Various Components  Most are submitted.
Software Quality Assurance Activities
Vu Pham Refereeing and Discussant Guidelines Susan Godlonton AGRODEP AIEN III Workshop Dakar, Senegal 4 th June, 2014.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
Exposure Definition and Measurement in Observational Comparative Effectiveness Research Prepared for: Agency for Healthcare Research and Quality (AHRQ)
Managing Council’s Road Network for Better Outcomes Storm Damage Experience Ian de Bruyne Manager Program Planning & Delivery IPWEA Regional Forum 15 May.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
NORTHERN MSBO Pupil audit compliance issues Financial audit issues Federal audit compliance issues.
Topic1b: Project Life Cycle
MiCase SIS System. Agenda Philosophy of TSDL Challenges Involved Documentation Available Preparation Steps Generating Files.
Referrals, Consults, Co-management General: for all patients PCMH Neighbor Prepare patient – Use of referral guidelines where available – Patient/family.
Chapter 3 Definitions, Goals, and Objectives. Maintenance Defined Airline: “Those actions required for restoring or maintaining an item in a serviceable.
ISO NON-CONFORMANCE, CORRECTIVE AND PREVENTIVE ACTION.
Statistics and the Verification Validation & Testing of Adaptive Systems Roman D. Fresnedo M&CT, Phantom Works The Boeing Company.
Improving Data Quality Tuscaloosa County School System STI Office/District, McAleer PR.
Archival Workshop on Ingest, Identification, and Certification Standards Certification (Best Practices) Checklist Does the archive have a written plan.
Pradhan Mantri Gram Sadak Yojana (PMGSY)
Module 13: Monitoring Resources and Performance. Overview Using Task Manager to Monitor System Performance Using Performance and Maintenance Tools to.
Linear Prediction Correlation can be used to make predictions – Values on X can be used to predict values on Y – Stronger relationships between X and Y.
06/01/20161 Benny Hoff TÜV NORD Sweden AB AFS 2002:1 Use of pressure equipment.
Child and Adult Care Food Program (CACFP) Administrative Review Requirements.
Preparing a Business Office Procedures Manual for Your School District PREPARED BY: John Crafton, MASBO Leadership Preparation & Training Coordinator.
High Rise Design High Rise Design (Notes prepared by A. Hira – modified by N. Haritos) Department of Civil and Environmental Engineering, The University.
CFN 609 Principals’ Meeting December 6, 2012 Providing Effective Feedback Domain 1: Planning and Preparation Component 1e: Designing Coherent Instruction.
Lec. 19 – Hypothesis Testing: The Null and Types of Error.
Submission doc.: IEEE /0085r1 January 2016 Woojin Ahn, Yonsei Univ.Slide 1 Congestion control for UL MU random access Date: Authors:
FIMS Data Quality FIMS Annual Training May 10-12, 2016 Prepared by: Mark Gordy and Gayle Smith.
Dillon: CSE470: ANALYSIS1 Requirements l Specify functionality »model objects and resources »model behavior l Specify data interfaces »type, quantity,
Initial Teaching Practice & Drill Review Test PowerPoint can be used to teach new ideas and concepts to students. The presentation must be clear and.
Traffic Simulation L3b – Steps in designing a model Ing. Ondřej Přibyl, Ph.D.
Road Investment Decision Framework
AIRPORT SURVEYS.
SEC 340 Week 3 DQ 2 What are two proposals for reducing property crime? Do you feel these are effective? Why? Check this A+ tutorial guideline at
BSHS 452 Complete Class Program Design and Proposal Writing Version 2 Check this A+ tutorial guideline at 452/BSHS-452-Complete-Class.
BIS 220 Week 2 Individual Information Systems Proposal Check this A+ tutorial guideline at 220/BIS-220-Week-2-Individual-Information-
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Pharmaceutical Quality Control & current Good Manufacturing Practice
Financial Management of Parliament Bill
عمل الطالبة : هايدى محمد عبد المنعم حسين
Workshop on the Validation of Waste Statistics
آشنايی با اصول و پايه های يک آزمايش
Common Errors committed by the officers during the investigation & preparation of documents. – Discussion on relevant case laws.
What is software quality?
REVERSE ENGINEERING Footer Text 1/1/2019.
ચાલો માટી વિશે જાણીએ All About Soil.
An economics-based road classification system for South Africa
What is software quality?
Chapter 24 Comparing Two Means.
Submission Title: IEEE Potential TG3b MAC Project
Chapter One Data Collection
What is Software Engineering?
Chapter One Data Collection
LOGO.
Presentation transcript:

Common Deficiencies observed in the Project Proposals received at NRRDA

Deficiencies in Project Selection Errors in the preparation of Core Network. Errors in the preparation of Core Network. Disproportionate allocation to the Districts. Disproportionate allocation to the Districts. Deficiency in the Preparation of CNCPL/CUPL. Deficiency in the Preparation of CNCPL/CUPL. Inadequacy in the consultative process. Inadequacy in the consultative process. Deviations from CNCPL/ CUPL in the roads selected. Deviations from CNCPL/ CUPL in the roads selected.

Deficiencies in the Design. Inadequate investigations. Inadequate investigations. Failure to check correlations in the soil properties. Failure to check correlations in the soil properties. Inaccurate estimation of Design Parameters. Inaccurate estimation of Design Parameters. Non adherence to the provisions of RRM for Pavement Component Design. Non adherence to the provisions of RRM for Pavement Component Design. In adequate Geometric Design. In adequate Geometric Design. Failure to identify cost aberrations in the components. Failure to identify cost aberrations in the components. Inappropriate location and design of CD Works. Inappropriate location and design of CD Works. Provisions beyond permissible as per guidelines. Provisions beyond permissible as per guidelines. Deficiency in checking the Schedule of Rates, Maintenance Cost. Deficiency in checking the Schedule of Rates, Maintenance Cost. Failure to investigate alternate designs for optimality. Failure to investigate alternate designs for optimality.

Deficiencies in Reporting Incompatibility of data on connectivity status. Incompatibility of data on connectivity status. Incomplete data entry on OMMAS. Incomplete data entry on OMMAS. Failure to clear the proposals on - line at STA Level. Failure to clear the proposals on - line at STA Level. Incomplete data in Format “C”. Incomplete data in Format “C”. Failure to give specific remarks on individual project proposal and submission of consolidated reports by STAs. Failure to give specific remarks on individual project proposal and submission of consolidated reports by STAs.