CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.

Slides:



Advertisements
Similar presentations
TYPE TEXT HERE On July 4, 2012, scientists at CERN announced the discovery of an essential part of the Standard Model of particle physics: the Higgs.
Advertisements

Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Highest Energy e + e – Collider LEP at CERN GeV ~4km radius First e + e – Collider ADA in Frascati GeV ~1m radius e + e – Colliders.
The Large Hadron Collider By Kathleen McKay. What is the LHC? The most powerful particle accelerator in the world. A synchrotron (ring-shaped particle.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
ATLAS experiment Paula Eerola ATLAS presentation Prof. Paula Eerola Division of High Energy Physics Fysiska institutionen,Professorsgatan 1,
The Finnish CMS Collaboration Helsinki Institute of Physics S. Czellar, A. Heikkinen, J. Härkönen, V. Karimäki, H. Katajisto,R. Kinnunen,T. Lampén, K.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
John Womersley Particle Physics in CCLRC John Womersley Director of Particle Physics, CCLRC Zeuthen May 2006.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
03/27/'07T. ISGC20071 Computing GRID for ALICE in Japan Hiroshima University Takuma Horaguchi for the ALICE Collaboration
The Large Hadron Collider at CERN: Entering a new era in unravelling the mystery of matter, space and time Tsinghua, Beijing April 2009 Felicitas Pauss.
July CMS experiment at LHC Geoff Hall Imperial College London Geoff Hall.
1 Some predictions and experiment prospects of the heavy ion physics at LHC C. Kobdaj, Y. Yan and K. Khosonthongkee School of Physics, Institute of Science.
HPS – ECal Detector - TECHNICAL PARAMETERS The experimental apparatus includes two main detectors: a silicon vertex tracker (SVT) for precise momentum.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Particle Physics Quiz EPPOG Hands on Particle Physics Masterclasses 2011.
HPS – ECal Detector - TECHNICAL PARAMETERS The experimental apparatus includes two main detectors: a silicon vertex tracker (SVT) for precise momentum.
The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.
Search for a Z′ boson in the dimuon channel in p-p collisions at √s = 7TeV with CMS experiment at the Large Hadron Collider Search for a Z′ boson in the.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
CMS Status Report 8 th CERN-Korea Committee Meeting CERN October Guido Tonelli University of Pisa/INFN/CERN Our physics goals. The CMS Experiment.
Silicon Module Tests The modules are tested in the production labs. HIP is is participating in the rod quality tests at CERN. The plan of HIP CMS is to.
Discovering the Higgs Boson J. Pilcher Talk for Graduate Students January 9, 2004.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINE upgrade workshop, CERN 3– 5 March, 2014.
Outline  Introduction  Higgs Particle Searches for Origin of Mass  Grid Computing Effort  Linear Collider Detector R&D  Conclusions A Quest for the.
MICE CMPB Alain Blondel 1 Highlights on MICE.
Fribourg, 30 June – 2 July 2014 Proton - Proton LHC Switzerland contributes to the ATLAS, CMS and LHCb experiments of the LHC. This involvement.
India in DØ Naba K Mondal Tata Institute, Mumbai.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 1 Exploded view of CMS ECAL Tracker HCAL 4T solenoid Muon chambers Total weight: 12,500 t Overall diameter:
Large Hadron Collider BY: DARSHAN MISTRY, ALEX GUMBRELL, CHRISTINE AUCIELLO, PATRICK DUNGOG.
Sep/19/2008 Su Dong Stanford Student Orientation: Accelerator based Particle Physics1 Accelerator Based Particle Physics Su Dong Stanford Student Orientation.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
M. Garcia-Sciveres July 2002 ATLAS A Proton Collider Detector M. Garcia-Sciveres Lawrence Berkeley National Laboratory.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
PERG Seminar Warsaw University of Technology, Collaboration of particle physicists with electronics engineers Grzegorz Wrochna Soltan Institute.
Argonne’s Rôle in ZEUS José Repond Argonne National Laboratory DOE Visit, Germantown, March 11 th, 2004.
Monday, Nov. 8, 2010PHYS 3446, Fall 2010 Andrew Brandt 1 PHYS 3446 – Lecture #17 Monday, Nov. 8, 2010 Dr. Andrew Brandt Particle Detection Calorimeter.
LAPP Introduction Catherine ADLOFF for Yannis KARYOTAKIS.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Collaborative Research Projects in Australia: High Energy Physicists Dr. Greg Wickham (AARNet) Dr. Glenn Moloney (University of Melbourne) Global Collaborations.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
LHC Science Goals & Objectives
PANDA Muon Group Meeting, Protvino 7 June 2011 G
The LHCb Installation Story
Resolution Studies of the CMS ECAL in the 2003 Test Beam
China at LHC Institutional participation Resources of Fund
CMS muon detectors and muon system performance
@tarashears.
LHCC referees’ questions, comments, requests
LHC DATA ANALYSIS INFN (LNL – PADOVA)
Kevin Burkett Harvard University June 12, 2001
CMS Goal of the experiment
by M. Della Negra, P. Jenni, and T. S. Virdee
Commissioning of the ALICE-PHOS trigger
AMICI WP1 – Management, coordination and dissemination
Plans for the 2004 CSC Beam Test
Presentation transcript:

CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of 14 TeV. The main goal of the experiment is the search for the Higgs boson and for the super- symmetric partners of known particles. The scientific program includes also detailed studies of the top quark and precision measurements of CP violation parameters in the b-system. The physics of heavy ion collisions, and, in particular, the clear identification of a new state of matter as the quark-gluon plasma will also be addressed. 2.Physics achievements in 2002 The experiment is still in construction, therefore no physics result has been achieved in Important results have been obtained from the R&D activity carried on for all sub-detectors including computing. The main goal of this phase of the experiment is a successful commissioning of the main detector components. 3.INFN contribution to the experiment in terms of manpower and financial support INFN researchers are involved in the following sub-detectors: Solenoidal Magnet, Tracker, Electromagnetic Calorimeter, Muon System and Computing. The total number of physicists and engineers working in CMS in 2002 is 252. They come from 13 INFN Laboratories and account for about 16% of the total number of CMS collaborators. Technicians are not included in these figures. The INFN financial support to CMS deliverables amounts to about 63.9 MCHF over an estimated total cost of the experiment around 500 MCHF. The overall INFN financial support to CMS for the year 2002 is 8141KEuro, including travel expenses and consumables.

4.Number of publications in refereed journals ~ 40 5.Number of talks at conferences (from INFN) ~ 20 6.Number of undergraduate and doctoral theses on the experiment 15 undergraduate and 8 doctoral theses 7.Leadership role in the experiment - Lorenzo Foa‘ : Chairman of the Collaboration Board - Rino Castaldi: Deputy Project Leader (Tracker) - Fabrizio Gasparini: Project Leader (Muon) - Cristiana Peroni: Finance Board - Guido Tonelli: Management Board and Finance Board 8.Innovative instruments 4T magnet; large area RPC’s; radiation-hard silicon detectors and read-out electronics; analog optical links; new crystals and APDs; new approach on trigger, data handling and computing. 9.Competing experiments ATLAS for the entire physics program. CDF and LHC-B for part of the program; ALICE for Heavy Ions physics. 10.International committees which have reviewed the experiment The most important one is the LHC Committee at CERN that monitors continuosly the progress of activities.

Milestones 2002 MUONS 8 MB3 May Further 8 MB3 October Production lines in Torino ready September Assembly test of the first mini-crateOctober RPC Decision on mass production January Production and test of the front end chips February Production stations 2 and 3 CW June HV system prototype readyJuly Production and test of all FE boards September Production station 1 CWOctober ECAL Quality check on 2000 crystalsJune* Quality check on 6000 crystals (20% of the total)December* Assembly and test of 5 modulesJune* Assembly and test of 12 modules (15% of the total)December* Test of 12 HV boardsJune Test of 36 HV boards (25% of the total)December Production of 26 gridsJune Production of 52 grids (36% of the total) *These items are subject to the delivery in time of parts (like crystals or photo-detectors) supposed to be delivered by other Institutions.

Milestones 2002 TRACKER 40 modules M200 produced January System test (6 modules in a string) March Final specifications optical hybridMay Start-up of module productionJune Final specifications Power SupplyOctober 400 modules producedDecember Layer 1 mechanical structure December MAGNET Impregnated prototype ready January Module CB-2 impregnated April Module CB-1 impregnatedJuly Module CB0 impregnatedOctober COMPUTING All sites operationalMarch One half of the sites working in integrated modeApril Test of Data Base distribution within sitesJune 4 Tier2 initial prototypes readyOctober MC production of 20% of the events needed by CMSDecember

Milestones 2003 DT First MB4 chamber assembled in TorinoMarch Start mass assembly of minicratesJune Test of chambers and of the trigger system on 25ns beamJune Assembly line in Torino working at planned production rateJuly Installation of the central wheelOctober 18 MB3 chambers ready (35 since the beginning)December RPC Protocol and test system with cosmic rays frozenJanuary All assembly and test sites in operationMarch Production and test of 100 W-O stationsApril Production and test of 100 W-1 stationsDecember Pre-production of the HV/LV system December ECAL Cooling system for SM1 designedJune QC of 9600 crystals (15600 since the beginning) December Assembly and test of 24 modules (36 since the beginning)December Test of 36 HV boards December Production of 52 grids (104 since the beginning)December Production of 16 superbasketsDecember Test of SM1December

Milestones 2003 TRACKER 200 TIB modules assembled and testedFebruary System test of the TIB DS layersApril First TID disk manufactured June Tender for the Power Supply System July 1400 TIB-TID modules assembledDecember TIB/TID structural parts readyDecember MAGNET CB-1 module impregnatedApril CB-0 module impregnated July CB+1 module impregnatedSeptember CB+2 module impregnatedDecember COMPUTING 50% GRID sites enabled April Production prototypes for LCG (Tier1+Tier2) readyJune New analysis environment for CMS installed and workingJune 50% Sites operational with the new software October Participation of Tier1and of 50% of Tier2 to the 5% Data ChallengeDecember