Modification: 0479 - Inclusion of email as a valid UNC communication Allowing email as a valid form of UNC communication in specific circumstances.

Slides:



Advertisements
Similar presentations
Force Majeure & payment of Exit Charges Jeff Chandler - 6 th October 2011 Transmission Workgroup - Elexon 1.
Advertisements

Application of User Pays Principles to Existing Service Lines 22nd November 2006.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
User Admission Steps Legal Opinion Obtain copy of Uniform Network Code
1 Addendum Fall 2006 Limited-Term RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. September 11, 2006.
Mod 0479 – Inclusion of as a valid code communication NGN to provide a view on legal status of , a definition of what is an e- mail communication.
Proposer: Colette Baldwin – E.ON Panel Date: 21 st August A: Mod Title: Inclusion of as a valid UNC communication.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
NEC Network Emergency Exercise - Exercise Prelude.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
User Emergency Contact Details Simon Trivella –28 th May 2009 Distribution Workstream.
UP presentation Transmission wstream Jan 08 1 user pays services implementation January 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Project Nexus Workgroup – Invoicing 11 th August 2014.
EBCC Update SCR impacts Mark Cockayne 4 th November 2013.
© Energy UK April 2012 Modification 435 Workgroup Alternative approaches to NDM Compensation 19 February 2013
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
“Invoicing Arrangements For Late Payments” Distribution Workstream – 28th August 2008 Erika Melen UNC Modification Proposal 0220.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
Industry Dialogue on xoserve Services 14 th September 2007.
Legal Text Production Options for Discussion. Legal Text Production 2 Issues with current approach Issues with the current approach to legal text production.
Connected System Exit Points Options for strategic regime change Chris Warner.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
IGT and Shipper Workgroup meeting 28 th February 2011.
SoS Report PAC – 13th December 2016.
FGO: ASA Service Line Review
Shipper Termination Rules
User Pays Funding – Potential Licence Mechanism
UNC NOMINATION & ELECTION PROCESSES
Introduction of Code Contingency Guidelines Document
PN UNC Workgroup Invoicing 4th October 2011.
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
UNC User Representatives Process
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
COR1072 Enduring Transfer and Trade Arrangements
Force Majeure & Emergencies: Communications by
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Introduction of Code Contingency Guidelines Document
Modification Proposal 0474: Inclusion of the guidelines relating to the “Customer Settlement Error Claims Process” within UNC governance.
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
User Pays Invoicing Type 1
UNC User Representatives Process
Gemini Code Contingency Review
Implementation Approach Distribution Workgroup – June 2014
Modification 440 Project Nexus iGT Single Service Provision
Modification 0621 / GB Charging Project DSC Change Management Committee update June 2018.
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Capacity Access Review
Presentation transcript:

Modification: Inclusion of as a valid UNC communication Allowing as a valid form of UNC communication in specific circumstances.

2 Why Change? has superseded fax as a more efficient and common form of business communication Precedents have been set in the energy industry: − Gas Industry: UNC Modification Proposal 033, ‘Notification to Users of Emergency Incidents – Impacts on Code Communications’ extended allowable forms of communication to include internet and within the Shipper Incident Communication Procedure (SCIP) and was implemented in − Electricity Industry: Modification Proposal P133, ‘ Communication under the Code’ allowed general communication given by the Balancing and Settlement Code Committee (BSCCo) to all parties simultaneously to be sent by .

3 Why Change? There is scope for positive change: − A 2011 Transmission Workgroup on Force Majeure and payment of Exit Charges discussed the reliability of faxes and questioned whether may be a more appropriate alternative. − Several areas of the UNC that dictate specific forms of communication or contact details have never been looked at with regards . − Appendix 5 of the UK Link Manual can be reviewed for potential amendments.

4 Solution Examples of UNC amendments: − UNC TPD S3.4.5 (Invoice and Payment) and UNC TPD V3.4.7 (Code Credit Limits) dictate the information Users shall provide to Transporters to allow communication on Transportation Charges and Invoicing. Currently they only dictate the inclusion of a single telephone number, address and facsimile number. These proposals will amend the references to include a single address. − UNC TPD V2.1.2 (Admission Requirements) states that in order to become a Shipper User in relation to a System or a Trader User in relation to the NTS a person must provide the address, telephone and facsimile numbers of the Applicant User. This will be amended to include a single address to improve communications. Appendix 5 of the UK Link Manual is being reviewed by NGN and will be presented to the Workgroup for discussion and to consider additional potential areas for inclusion of . We would also welcome suggestions from Workgroup members on possible areas of the Code that could be included in this proposal to be amended to allow communication.

5 Governance Arrangements When an should be deemed to have been received by Parties? An should be deemed to have been received one hour after it has been successfully send. If the conclusion of this hour falls after 5p.m., the shall be deemed to have been received at 9 a.m. the following day. The party is responsible for checking and reading the in the same way as with post and fax. What happens if an system fails? The responsibility to maintain a fully functional system necessarily lies with the Party who owns it. However, the UK link manual will still allow for conventional means of communication, so if an fails we can use letter or fax.