To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 12 Enterprise Resource Planning.

Slides:



Advertisements
Similar presentations
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Advertisements

Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management - 6 th Edition Chapter.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Chapter 15 Resource Planning. Lecture Outline Material Requirements Planning (MRP) Capacity Requirements Planning (CRP) Enterprise Resource Planning (ERP)
Principles of Operations Management
Materials Requirements Planning
4. Production and Material Planning
Materials Requirements Planning. Collins Industries  Largest manufacturer of ambulances in the world  International competitor  12 major ambulance.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management - 6 th Edition Chapter.
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
Material Requirement Planning (MRP)
Material Requirements Planning
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management - 5 th Edition Chapter.
Production and supply chain process MIS2101: Management Information Systems Based on material developed by C.J. Marselis.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management - 5 th Edition Chapter.
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
Aggregate Planning and Resource Planning Chapters 13 and 14.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 13 Material Requirements Planning.
Resource Planning Chapter 14. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
1 Material Requirement Planning (MRP) Chapter 16 Feb 9, 2006.
Week #14-2 Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Sales and Operations Planning
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
1 Example: MRP Schedule LocoMopeds is a manufacturer of off-road mopeds. The following product structure diagram represents the bill of materials for.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Operations Management Material Requirements Planning
Chapter 16 Inventory Systems for Dependent Demand
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Resource Planning Lecture Outline   Material Requirements Planning (MRP)   Capacity Requirements Planning (CRP)   Enterprise Resource Planning.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Materials Requirements Planning
Chapter 15 MRP and ERP.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
1DSCI4743 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Structure of the MRP System MRP by period report MRP by date report Planned orders report Purchase requirements Exception reports MRP Programs Master.
1 Operations Management MRP Lecture 22 (Chapter 14)
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management Chapter 15 Roberta Russell.
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
Materials Requirements Planning. Collins Industries  Largest manufacturer of ambulances in the world  International competitor  12 major ambulance.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management - 6 th Edition Chapter.
Materials Requirements Planning
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 12 Enterprise Resource Planning.
Copyright 2009 John Wiley & Sons, Inc. Resource Planning Operations Management - 6 th Edition Chapter 15 Roberta Russell & Bernard W. Taylor, III.
BUAD306 MRP.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management - 6 th Edition Chapter.
Inputs and Outputs to Aggregate Production Planning
Facility Inventory Old Facilities Modern Facilities Classroom Size
BUAD306 MRP/ERP.
Resource Planning Systems
Beni Asllani University of Tennessee at Chattanooga
CHAPTER 14 MRP and ERP.
Material Requirement Planning (MRP)
Material requirements planning
Material Requirement Planning (MRP)
Operations Management
Inputs and Outputs to Aggregate Production Planning
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 12 Enterprise Resource Planning To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved.

Enterprise Resource Planning (ERP) Organizes and manages a company’s business processes by sharing information across functional areas Organizes and manages a company’s business processes by sharing information across functional areas Connects with supply-chain and customer management applications Connects with supply-chain and customer management applications

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. ERP Modules

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. ERP Modules Figure 12.1

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. ERP’s Central Database Finance & Accounting Sales & Marketing Human Resources Production & Materials Management ERP Data Repository Figure 12.2

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. ERP Implementation First step is to analyze business processes First step is to analyze business processes Which processes have the biggest impact on customer relations? Which processes have the biggest impact on customer relations? Which process would benefit the most from integration? Which process would benefit the most from integration? Which processes should be standardized? Which processes should be standardized? Use of Internet portals can aid implementation Use of Internet portals can aid implementation

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Customer Relationship Management (CRM) Plans and executes business processes that involve customer interaction Plans and executes business processes that involve customer interaction Changes focus from managing products to managing customers Changes focus from managing products to managing customers Point-of-sale data is analyzed for patterns used to predict future behavior Point-of-sale data is analyzed for patterns used to predict future behavior

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Supply Chain Management Supply chain planning Supply chain planning Supply chain execution Supply chain execution Supplier relationships Supplier relationships Distinctions between ERP and SCM are becoming increasingly blurred Distinctions between ERP and SCM are becoming increasingly blurred

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Collaborative Product Commerce (CPC) New product design and development and product life cycle management New product design and development and product life cycle management Integrates customers and suppliers in the design process though the entire product life cycle Integrates customers and suppliers in the design process though the entire product life cycle

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Collaborative Product Commerce (CPC) Customer Relationship Management (CRM) Enterprise Resource Planning (ERP) Collaborative Product Commerce (CPC) Supply Chain Management (SCM) Time to Market Time to Customer Customers Product Design Suppliers Collaborative Design Manufacture & Delivery Collaborative Manufacture DFMA Figure 12.3

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Connectivity A very difficult problem A very difficult problem Enterprise Application Integration (EAI) solutions Enterprise Application Integration (EAI) solutions EDI is being replaced by XML EDI is being replaced by XML A continuing issue A continuing issue

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. ERP and MRP MRP (material requirements planning) was the precursor to ERP MRP (material requirements planning) was the precursor to ERP Primarily a production planning and control system Primarily a production planning and control system MRP evolved to MRP II (manufacturing resource planning) MRP evolved to MRP II (manufacturing resource planning) ERP and ERP II continue to extend the links through all business processes ERP and ERP II continue to extend the links through all business processes

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Material Requirements Planning Computerized inventory control & production planning system Computerized inventory control & production planning system Schedules component items when they are needed - no earlier and no later Schedules component items when they are needed - no earlier and no later

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. When to Use MRP Dependent and discrete items Dependent and discrete items Complex products Complex products Job shop production Job shop production Assemble-to-order environments Assemble-to-order environments

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Demand Characteristics Week – – – – No. of tables Continuous demand M T W Th F M T W Th F – – – – No. of tables Discrete demand Independent demand 100 tables Dependent demand 100 x 1 = 100 tabletops 100 x 4 = 400 table legs Figure 12.4

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Material Requirements Planning

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Material Requirements Planning Material requirements planning Planned order releases Work orders Purchase orders Rescheduling notices Item master file Product structure file Master production schedule Figure 12.5

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Master Production Schedule Drives MRP process with a schedule of finished products Drives MRP process with a schedule of finished products Quantities represent production not demand Quantities represent production not demand Quantities may consist of a combination of customer orders & demand forecasts Quantities may consist of a combination of customer orders & demand forecasts Quantities represent what needs to be produced, not what can be produced Quantities represent what needs to be produced, not what can be produced

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Master Production Schedule PERIOD MPS ITEM12345 Clipboard Lapdesk Lapboard Pencil Case

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Product Structure Tree Clipboard Level 0 Level 1 Level 2 Spring (1) Bottom Clip (1) Top Clip (1) Pivot (1) Rivets (2) Clip Ass’y (1) Pressboard (1) Figure 12.6

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Product Structure Tree Top clip (1)Bottom clip (1) Pivot (1)Spring (1) Rivets (2) Finished clipboardPressboard (1) Clipboard Figure 12.6

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Indented Bill of Material Clipboardea Clip Assemblyea Top Clipea Bottom Clipea Pivotea Springea Rivetea Press Boardea1 LEVELITEMUNIT OF MEASUREQUANTITY

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Specialized BOMS Phantom bills Phantom bills Transient subassemblies Transient subassemblies Never stocked Never stocked Immediately consumed in next stage Immediately consumed in next stage K-bills K-bills Group small, loose parts under pseudo-item number Group small, loose parts under pseudo-item number Reduces paperwork Reduces paperwork

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Specialized BOMS Modular bills Modular bills Product assembled from major subassemblies & customer options Product assembled from major subassemblies & customer options Modular bill kept for each major subassembly Modular bill kept for each major subassembly Simplifies forecasting & planning Simplifies forecasting & planning X10 Automobile example X10 Automobile example 3 x 8 x 3 x 8 x 4 = 2,304 configurations 3 x 8 x 3 x 8 x 4 = 2,304 configurations = 26 modular bills = 26 modular bills

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. 4-Cylinder (.40)Bright red (.10)Leather (.20)Grey (.10)Sports coupe (.20) 6-Cylinder (.50)White linen (.10)Tweed (.40)Light blue (.10)Two-door (.20) 8-Cylinder (.10)Sulphur yellow (.10)Plush (.40)Rose (.10)Four-door (.30) Neon orange (.10)Off-white (.20)Station wagon (.30) Metallic blue (.10)Cool green (.10) Emerald green (.10)Black (.20) Jet black (.20)Brown (.10) Champagne (.20)B/W checked (.10) X10 Automobile EnginesExterior colorInteriorInterior colorBody (1 of 3)(1 of 8)(1 of 3)(1 of 8)(1 of 4) Modular Bills of Material Figure 12.7

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Item Master File DESCRIPTIONINVENTORY POLICY ItemPressboardLead time1 Item no.734Annual demand5000 Item typePurchHolding cost1 Product/sales classCompOrdering/setup cost50 Value classBSafety stock 0 Buyer/plannerRSRReorder point39 Vendor/drawing07142EOQ316 Phantom codeNMinimum order qty100 Unit price/cost1.25Maximum order qty500 PeggingYMultiple order qty LLC1Policy code3 Table 12.4

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Item Master File PHYSICAL INVENTORYUSAGE/SALES CODES On hand100YTD usage/sales1100 LocationW142MTD usage/sales75 On order100YTD receipts1200 Allocated75MTD receipts0 Cycle3Last receipt8/25 Last count9/5Last issue10/5 Difference-2 Cost acct Routing00326 Engr07142 Table 12.4

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Basic MRP Processes 1.Exploding the bill of material 2.Netting out inventory 3.Lot sizing 4.Time-phasing requirements

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. The MRP Matrix Gross Requirements Derived from MPS or planned order releases of the parent Scheduled Receipts On order and scheduled to be received Projected on Hand Beg Inv Anticipated quantity on hand at the end of the period Net Requirements Gross requirements net of inventory and scheduled receipts Planned Order Receipts When orders need to be received Planned Order Releases When orders need to be placed to be received on time ITEM NAME OR NO.LLC - LOW LEVEL CODEPERIOD LOT SIZE QTY MADE INLY - LEAD TIME12345 Table 12.5

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. School Mate Products Master Production Schedule Clipboard Lapdesk Example 12.1 Item Master File CLIPBOARDLAPDESKPRESSBOARD On hand On order175 (Period 1)00 (sch receipt) (sch receipt) LLC001 Lot sizeL4LMult 50Min 100 Lead time111

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. School Mate Products Example 12.1 Product Structure Record Clipboard Lapdesk Pressboard (2) Trim (3’) Beanbag (1) Glue (4 oz) Level 0 Pressboard (1) Clip Ass’y (1) Rivets (2) Level 1

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. School Mate Products Example 12.1 ITEM: CLIPBOARDLLC: 0PERIOD LOT SIZE: L4LLT: Gross Requirements Scheduled Receipts175 Projected on Hand25 Net Requirements Planned Order Receipts Planned Order Releases

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. School Mate Products Example 12.1 ITEM: CLIPBOARDLLC: 0PERIOD LOT SIZE: L4LLT: Gross Requirements Scheduled Receipts175 Projected on Hand25115 Net Requirements0 Planned Order Receipts Planned Order Releases ( ) = 200 units available ( ) = 115 on hand at the end of Period 1

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. School Mate Products Example 12.1 ITEM: CLIPBOARDLLC: 0PERIOD LOT SIZE: L4LLT: Gross Requirements Scheduled Receipts175 Projected on Hand Net Requirements00 Planned Order Receipts Planned Order Releases 115 units available ( ) = 20 on hand at the end of Period 2

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. School Mate Products Example 12.1 ITEM: CLIPBOARDLLC: 0PERIOD LOT SIZE: L4LLT: Gross Requirements Scheduled Receipts175 Projected on Hand Net Requirements00100 Planned Order Receipts100 Planned Order Releases units available ( ) = -100 — 100 additional Clipboards are required Order must be placed in Period 2 to be received in Period 3

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. School Mate Products Example 12.1 ITEM: CLIPBOARDLLC: 0PERIOD LOT SIZE: L4LLT: Gross Requirements Scheduled Receipts175 Projected on Hand Net Requirements Planned Order Receipts Planned Order Releases Following the same logic Gross Requirements in Periods 4 and 5 develop Net Requirements, Planned Order Receipts, and Planned Order Releases

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. School Mate Products Example 12.1 ITEM: LAPDESKLLC: 0PERIOD LOT SIZE: MULT 50LT: Gross Requirements Scheduled Receipts Projected on Hand20 Net Requirements Planned Order Receipts Planned Order Releases

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. School Mate Products Example 12.1 ITEM: LAPDESKLLC: 0PERIOD LOT SIZE: MULT 50LT: Gross Requirements Scheduled Receipts Projected on Hand Net Requirements04050 Planned Order Receipts5050 Planned Order Releases5050 Following the same logic, the Lapdesk MRP matrix is completed as shown

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. School Mate Products Example 12.1 ITEM: PRESSBOARDLLC: 0PERIOD LOT SIZE: MIN 100LT: Gross Requirements Scheduled Receipts Projected on Hand150 Net Requirements Planned Order Receipts Planned Order Releases ITEM: CLIPBOARDLLC: 0PERIOD LOT SIZE: L4LLT: Planned Order Releases ITEM: LAPDESKLLC: 0PERIOD LOT SIZE: MULT 50LT: Planned Order Releases5050

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. School Mate Products Example 12.1 ITEM: PRESSBOARDLLC: 0PERIOD LOT SIZE: MIN 100LT: Gross Requirements Scheduled Receipts Projected on Hand150 Net Requirements Planned Order Receipts Planned Order Releases ITEM: CLIPBOARDLLC: 0PERIOD LOT SIZE: L4LLT: Planned Order Releases ITEM: LAPDESKLLC: 0PERIOD LOT SIZE: MULT 50LT: Planned Order Releases5050 x2 x2 x1 x1 x1

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. School Mate Products Example 12.1 ITEM: PRESSBOARDLLC: 0PERIOD LOT SIZE: MIN 100LT: Gross Requirements Scheduled Receipts Projected on Hand Net Requirements Planned Order Receipts Planned Order Releases ITEM: CLIPBOARDLLC: 0PERIOD LOT SIZE: L4LLT: Planned Order Releases ITEM: LAPDESKLLC: 0PERIOD LOT SIZE: MULT 50LT: Planned Order Releases5050

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. School Mate Products Example 12.1 Planned Order Report PERIOD ITEM12345 Clipboard Lapdesk5050 Pressboard

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. MRP Outputs Planned orders Planned orders Work orders Work orders Purchase orders Purchase orders Changes to previous plans or existing schedules Changes to previous plans or existing schedules Action notices Action notices Rescheduling notices Rescheduling notices

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Planned Order Report Table 12.6 Item#2740Date On hand100Lead time2 weeks On order200Lot size200 Allocated50Safety stock50 SCHEDULEDPROJECTED DATEORDER NO.GROSS REQS.RECEIPTSON HANDACTION AL AL GR SR Expedite SR CO GR GR GR Release PO Key:AL= allocatedWO= work order CO= customer orderSR= scheduled receipt PO= purchase orderGR= gross requirement

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. MRP Action Report Table 12.7 Current date ITEMDATEORDER NO.QTY.ACTION # ExpediteSR10-01 # Move forwardPO10-07 # Move forwardPO10-05 # Move backwardPO10-25 # De-expediteSR10-30 # ReleasePO10-13 # ReleaseWO10-24

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Capacity Requirements Planning (CRP) Computerized system that projects load from material plan Computerized system that projects load from material plan Creates load profile Creates load profile Identifies underloads and overloads Identifies underloads and overloads

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Capacity Usually expressed as standard machine hours or labor hours Capacity= (no. machines or workers) x (no. shifts) x (utilization) x (efficiency)

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Capacity Terms Load profile Load profile Compares released and planned orders with work center capacity Compares released and planned orders with work center capacity Capacity Capacity Productive capability; includes utilization and efficiency Productive capability; includes utilization and efficiency Utilization Utilization % of available working time spent working % of available working time spent working

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. More Capacity Terms Efficiency Efficiency Load Load The standard hours of work assigned to a facility The standard hours of work assigned to a facility Load percent Load percent The ratio of load to capacity Load % = (load/capacity)x100% The ratio of load to capacity Load % = (load/capacity)x100%

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Capacity Requirements Planning MRP planned order releases Routing file Capacity requirements planning Open orders file Load profile for each machine center Figure 12.8

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Determining Loads and Capacities 2 copiers, 2 operators 5 days/wk, 8 hr/day 1/2 hr meals, 1/2 hr maintenance per day Efficiency= 100% Utilization= 7/8 = 87.5% Daily capacity= 2 machines x 2 shifts x 8 hours/shift x 100% efficiency x 87.5% utilization = 28 hours or 1,680 minutes Example 12.2

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Determining Loads and Capacities Example 12.2 JOBNO. OFSETUPRUN TIME NO.COPIESTIME (MIN)(MIN/UNIT) TOTAL TIME (500 x 0.08) = , (1,000 x 0.10) = , (5,000 x 0.12) = , (10,000 x 0.14) =1, , (2,000 x 0.10) = min Load percent = 2,385.7 / 1,680 = 1.42 x 100% = 142% Add another shift: Daily capacity= 2 machines x 3 shifts x 8 hours/shift x 100% efficiency x 87.5% utilization = 42 hours or 2,520 minutes Revised load percent = 2,385.7 / 2,520 = x 100% = 94.67%

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Initial Load Profile Figure 12.9 Hours of capacity Time (weeks) Normalcapacity – – – – – – – – – – – – 0 0 –

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Remedies for Underloads 1.Acquire more work 2.Pull work ahead that is scheduled for later time periods 3.Reduce normal capacity

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Remedies for Overloads 1.Eliminate unnecessary requirements 2.Reroute jobs to alternative machines or work centers 3.Split lots between two or more machines 4.Increase normal capacity 5.Subcontract 6.Increase the efficiency of the operation 7.Push work back to later time periods 8.Revise master schedule

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Adjusted Load Profile Figure Hours of capacity Time (weeks) Normalcapacity – – – – – – – – – – – – 0 0 – Pull ahead Push back Overtime Work an extra shift

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Relaxing MRP Assumptions Material is not always the constraining resource Material is not always the constraining resource Lead times can vary Lead times can vary Not every transaction needs to be recorded Not every transaction needs to be recorded JIT can be used with MRP JIT can be used with MRP The shop floor may require a more sophisticated scheduling system The shop floor may require a more sophisticated scheduling system

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Manufacturing Resource Planning (MRP II)

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Manufacturing Resource Planning (MRP II) Forecast Aggregate production plan Customer orders Feasible? Master production schedule Material requirements planning Capacity requirements planning Feasible? Purchase orders Work orders Inventory Shop floor control Manufacture No Yes Feedback No Yes Figure 12.11

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Manufacturing Resource Planning (MRP II) Forecast Aggregate production plan Customer orders Feasible? Master production schedule Material requirements planning Capacity requirements planning Feasible? Purchase orders Work orders Inventory Shop floor control Manufacture No Yes Feedback No Yes Figure Forecast Aggregate production plan Customer orders Feasible? Master production schedule No Yes

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Manufacturing Resource Planning (MRP II) Forecast Aggregate production plan Customer orders Feasible? Master production schedule Material requirements planning Capacity requirements planning Feasible? Purchase orders Work orders Inventory Shop floor control Manufacture No Yes Feedback No Yes Figure Master production schedule Material requirements planning Capacity requirements planning Feasible? Yes No

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Forecast Aggregate production plan Customer orders Feasible? Master production schedule Material requirements planning Capacity requirements planning Feasible? Purchase orders Work orders Inventory Shop floor control Manufacture No Yes Feedback No Yes Manufacturing Resource Planning (MRP II) Figure Inventory Shop floor control Manufacture Purchase orders Work orders

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Manufacturing Resource Planning (MRP II) Forecast Aggregate production plan Customer orders Feasible? Master production schedule Material requirements planning Capacity requirements planning Feasible? Purchase orders Work orders Inventory Shop floor control Manufacture No Yes Feedback No Yes Figure 12.11