ISOLDE: Status report building 508 70th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.

Slides:



Advertisements
Similar presentations
LS1 & Buildings 115, 507 and 601. Building 601 Building 601 (kitchen & entrance): Power has been cut and disconnected (Patrick Gallay EL) All items removed.
Advertisements

Heating, Ventilating, and Air-Conditioning
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
DUBAI STAR WORK PROGRESS DATE 23 JULY Material At Site.
Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
27 Feb 2012 Erwin Siesling 1 TSR Max Planck Institute Heidelberg Hie-Isolde LOI endored Jan 2011 TDR submitted Jan.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
DER – Before, During and After: A Homeowner’s Perspective.
Design of HVAC systems for bld 3862 – LHCb control room and for bld 2885 – LHCb new workshop.
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
ROOFING MATERIALS, INSULATION, AND HOUSING SYSTEMS.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution Wayne Salter / Vincent Doré.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
B508 and 275 Magdalena Kowalska. b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
ISOLDE Physics Coordinator Report Schedule Access to the hall Visits b275 and b508 Magdalena Kowalska.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
2 Workshop 2014 Status of the Project Klaus Blaum, MPI for Nuclear Physics, Heidelberg for the Collaboration CERN, Geneva,
NA62 CV activities Piero Valente 5 th September
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
Status of AWAKE Installation and Integration Presented 9/3/2016 at the AWAKE Collaboration Meeting Ans Pardons, for the AWAKE CP4 team.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
SCX5 – Proposed New Intermediate floor over existing CMS Rack Room J.Osborne CEMESTE 20 Feb 2008.
St Chad’s Catholic Primary School. January 2004 St Chad’s Catholic Primary School Phase Two new junior classrooms added.
Plans and schedule for the Long Shutdown LS1 Hie Isolde Physics Coordination Group CERN, 1 March 2012 Hie-Isolde Erwin Siesling.
Task # 3 Task # kW Target Station Layout proposal Presented by L.Bruno CERN AB Experimental Areas, Targets and Secondary Beams Group.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Installation at Isolde (and costs) TSR at Isolde workshop CERN, 29/30 October 2012 Isolde Erwin Siesling.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
Update on the PSB Cooling and Ventilation Systems
Demineralised water cooling system
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Objective 6.02 part 2: Recognize components of construction
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
Proposed New CMS Conference Room on first floor of SHL
Heating, Ventilating, and Air Conditioning
SPS cryogenic proximity equipment and SM18 validation
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Target and Horn status report
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
Heating, Ventilating, and Air-Conditioning
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska

2 Outline Status new building 508: –Progress on the construction –Building layout –Progress on infrastructure –Costs and timeline

3 New user facilities building 508 (replacing 507, 115, 601) Target zone and separators area ISOLDE experimental hall Reserved for TSR 508 New ISOLDE Control Room, 1 st floor 508 Present ISOLDE Control Room, basement 197 water station New building 508

4 Construction progress Progress since the 69 th ISCC (31 March ‘14): -Roof finished and tight -All windows, outer doors, stairs and inner walls installed -Openings and windows towards the Isolde hall in place -Outdoor concrete ramp and stairs done -Drainage and piping sanitaria ongoing March 2014

5 Construction progress

6 Layout 508 Ground floor B508: Controlled Access 508 ground floor and Isolde hall Access st floor Access st floor Access hall

7 Layout 508 1st floor B508: Access 1 st floor Courtesy Eliseo Perez-Duenas GS/SE

8 Infrastructure 508 Electricity: - User needs: 200kW - Cooling& Ventilation needs (re-designed): 130, 170, or 220kW - 40kW Equipment cooling: - New building, new rules.. Negotiating with HSE to use eau brut as before (with future change to a closed, chilled water, system) -User needs: COLLAPS, CRIS each: 50kW -> 20l/min, 3 wks/yr running (Total 2 x 1.2m3/hr x 24hrs x 7days x 3wks = m3 (about 1500chf))

9 Infrastructure 508 Cooling and ventilation: The proposed solution by the contractor was two HVAC (Heating Ventilation and Air Conditioning) systems based on a refrigerant liquid => too expensive and a new design was required: -General ventilation: fresh air to all rooms -Heating: through electrical radiators -Labs air-conditioning: -For the laser labs SSP, COLLAPS and CRIS labs fan-coils (4x7kW using existing ISOLDE chilled water) -For the SSP lab a separate refrigerant airco system (27kW)

10 Total costs building 508 (incl. services): estimate 2MCHF (staying within with adapted CV systems) Timeline: -Building ready April > May -ready since May -to do inside: doors, sanitaria, false ceiling & walls (waiting for CV/EL) -Infrastructure ready June > September -Re-design caused substantial delay (3 mnts) -EL and CV to start asap -Asphalt & metal passage structure this month -Installation controlled access June > July -Tourniquet and fences installation -Installations users as of July > As soon as possible -Emphasis on COLLAPS (SSP & CRIS workaround) -Move of the ICR during shutdown 2014/15 -ISOLDE Milestones: Protons to Isolde 10 July 2014; physics ISOLDE start 21 July physics from 508 start.. Costs and Timeline