Gas Regional Initiative – North West Region Paris Workshop 11 May 2007 Workshop on Interconnections & Primary Capacity Market Kick-off Meeting on IP 14.

Slides:



Advertisements
Similar presentations
Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Advertisements

BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Gas Regional Initiative North West Region - Short Term Capacity GRI NW SG Meeting Brussels – 26 November 2010.
15 th September 2013 Enagás and TIGF Information to NRAs.
RCC Meeting 13 December 2007 Interconnections: primary market IP Taisnières / Blaregnies / Quévy IP Taisnières / Blaregnies / Quévy IP Obergailbach / Medelsheim.
Capacity Project – C1 Interconnection points Blaregnies / Taisnières Medelsheim / Obergailbach Gas Regional Initiative – North West Region Capacity Day.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure.
GRI North West – RCC Meeting on 28 August Day Ahead – status and legal issues Background Day Ahead pilot project was launched within the ERGEG.
Gas Regional Initiative – North West Region Bonn 28 April 2009 Fiete Wulff Capacity Project C1 Short-Term Capacity (STC) Operators’ Group Update.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
RWE Transportnetz Gas 04/28/2009PAGE 1 ERGEG Gas Regional Initiative NW Short-term Capacity Project (C1) Comments by TSOs regarding different models discussed.
ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market Interconnection Point Oude Statenzijl H-gas Kick-off Meeting.
Gas Regional Initiative – North West Region London 14 November 2008 Chair: Joachim Gewehr Capacity Project C1 Short-Term Capacity (STC) Initial findings.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
6th RCC Meeting – Region South-South East 30th March 2007, Milano.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
Gas Regional Initiative – North West Region IG meeting The Hague – 25th March, 2009 Open Seasons Coordination Marie-Claire AOUN – CRE
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Welcome to the Workshop on Interconnection Points: Welcome to the Workshop on Interconnection Points: Taisnières / Blarégnies / Quévy Oude Statenzijl /
Gas Regional Initiative – North West Region Pierre-Marie Cussaguet (CRE) Dr. Stefanie Neveling (BNetzA) Bonn Workshops 8 and 9 Feb Workshop: Interconnections.
Gas Regional Initiative North-West Gas Balancing Dublin Workshop 24 th April 2007 Steve Pownall.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
Bonn Workshops 8 and 9 Feb Balancing workstream.
1 Day Ahead Auctions Making progress, Jour Fixe Day Ahead Auctions pilot 14 th of September 2007 Jour Fixe The Hague Conclusions and homework Chair DTe.
Gas Regional Initiative – North West Region Governmental Meeting 6 May 2010 – The Hague Secondary capacity markets Project update Betsy ANNEN – CRE Bernhard.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
Transmission Transparency Workshop European Strategy and Environment 10 July 2008.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
Directie Toezicht Energie 1 Gas Regional Initiative North West Maya van der Steenhoven Programme Office 28 April, 2009 Bonn.
1 GTE Transparency Platform GIE Annual Conference Madrid, 22/23 November 2007 Paolo Mosa GTE Vice President.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Coordination of Capacity Products Meinhard Janssen GTE ExCom Member GTE+ Workshop on GTE+ Work Programme 24 June 2008.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
6th Stakeholder Group meeting Stockholm – 26 November 2009 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer,
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
© 2007Slide 1 Solution Outline for Day-ahead Capacity Trading at Interconnection Points Marco Wettig Dublin, April 24th 2007.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
European Developments Transmission Workgroup 3 rd May 2012.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
Congestion Management
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
2009 TSO Transparency Gas Regional Initiative North-West
GRI NW TRANSPARENCY PROJECT
29th April 2014 Teleconference
Presentation transcript:

Gas Regional Initiative – North West Region Paris Workshop 11 May 2007 Workshop on Interconnections & Primary Capacity Market Kick-off Meeting on IP 14 A, B, C (Oude Statenzijl; H-Gas) GTS <> BEB; EGT; WTKG

2 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl Map: GTE I. Status Quo GTE map 2005 Former IP # 13A - D

3 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl I. Status Quo GTE map 2006 New IP # 14A - C

4 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl I. Status Quo Availability of Data / Confidentiality Problems (cf. report pages 65ff) Data on Oude Statenzijl GTSEGTWTKGBEB Technical Capacity 2005 confid. for Entry from EGT and WTKG yes partly Utilisation Rates 2005* confid. for Entry from EGT and WTKG yes confid. for Entry partly Rates of Subscription 2007 Most data confid. for BEB, partly for entry from WTKG, exit to EGT yes Amount seized by UIOLI 2005 yes Instructions for adjacent TSOs: Please bring missing data to the meeting. confid. = data labelled (at least partly) confidential *utilisation rates: In the questionnaire it was asked for min/max utilisation rates (flow as percentage of total technical capacity). Delivered by GTS, BEB was the min/max contractual allocation in m³/h and kWh/h. EGT & WTKG delivered physical net flow as percentages (WTKG as percentage of booked firm!))  Therefore, no final statement on existence of physical congestion possible!

5 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl I. Status Quo Main Problems identified in the report (cf. pages 65ff) IssueGTSEGTWTKGBEB Congestion Mismatch of technical capacities At least contractual congestion at all points Utilisation ratesVariation between 2 and 300 % CAMno coordinated CAM, only FCFS Products and booking procedures (e.g. timing) No auctions, no bundled/harmonised products, different booking deadlines and lead time, no coordinated booking CMP No strict and coordinated UIOLI Other... Confidentiality Conf. Suggestions by TSOs Stimulate investments Improve CAC methods implement auctions

6 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl I. Status Quo Booking situation at IP 14A (GTS  EGT) GTS website: No firm entry from EGT available until end of 2012 Until 2008/09/ % of firm exit to EGT available, thereafter technical capacities mainly confidential, but a substantial amount of firm exit still available EGT website: Until 2007/09/30 no firm entry nor exit capacity available Further data not yet available, due to new calculation of technical capacities in the EGT-system

7 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl I. Status Quo Booking situation at IP 14B (GTS  WTKG) GTS website: No firm entry from Wingas available until end of 2012 Until 2008/09/ % of firm exit to WTKG available, afterwards technical & booked capacities mainly confidential, but a large amount of firm exit still available WTKG website: Until 2010/03/31 >70% WTKG exit capacity to GTS available 22% entry until 2007/09/30 available, afterwards until 2010/03/31 52% available Similar situation as IP 14A

8 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl I. Status Quo Booking situation at IP 14C (GTS  BEB) GTS website: Until end of 2009 no firm entry capacity from BEB available Until end of Sept. 2009: 58% – 75% firm exit to BEB available BEB website: Until end of 2009 no firm entry nor exit capacity available

9 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl I. Status Quo GTS Entry partly confidential Mismatch of technical capacities EGT net flow max. 53% GTS contractual flow Technical Cap. and maximum utilisation 2005 at IP 14A Contractual Flows Net Flows

10 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl I. Status Quo Mismatch of technical capacities Note: GTS tech. capacity calculated flexibly! Low max. GTS Exit Utilisation (allocation) Technical Cap. and maximum utilisation 2005 at IP 14A Contractual Flows

11 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl I. Status Quo Mismatch of technical capacities GTS partly confidential Full util. in Oct. Variation in balanced flows between GTS/EGT due to Ref. GCV? Technical Cap. and net flow in 2005 at IP 14A

12 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl I. Status Quo GTS Entry capacity confidential GTS Entry utilisation partly confid. No complete evaluation possible Technical Cap. and maximum utilisation 2005 at IP 14B

13 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl I. Status Quo WTKG Entry max. physical utilisation partly confidential and at low level (max. 43%) GTS Exit low max. util. (contractual, not net flow) Mismatch of technical capacities No complete evaluation of flows possible Technical Cap. and maximum utilisation 2005 at IP 14B

14 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl I. Status Quo Technical Cap. and maximum utilisation 2005 at IP 14C Both Con- tractual Flows BEB Entry max. utilisation partly not available (Why?) Mismatch of technical capacity

15 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl I. Status Quo Capacity partly n.a. (Why?) GTS Entry and BEB Exit utilisation (allocation) highly exceeding techn. capacity and diverting BEB remark: physical (balanced) flow shows no physical congestion Technical Cap. and maximum utilisation 2005 at IP 14C

16 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl I. Status Quo BEB 9-12: physical (balanced) flow shows no physical congestion (max. 44% util. in Sept) Data for 2006 BEB  GTS needed Difference in balanced flows between GTS/BEB due to Ref. GCV? Technical Cap. and balanced flow in 2005 at IP 14C

17 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl I. Status Quo: additional detailed information Summary of results: GTS-WTKG (report – double click for full details)

18 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl Summary of results: GTS-E.ON GT (report – double click for full details) I. Status Quo: additional detailed information

19 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl Summary of results: GTS-BEB (report – double click for full details) I. Status Quo: additional detailed information

20 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl II. Implementation Goals: Proposal by BNetzA / DTe Impl. Goal DescriptionReasonRemedies / ToDo‘sDeadline 1 Capacities: Maximise available capacity Promote secondary market Increased capacity availability will facilitate competition. Contractual congestion seems to be the main problem. TSOs: Submit missing data on technical capacity, subscription, flows for (2004), 2005, 2006, in order to facilitate further specification of problems (2 weeks) Explain low utilisation and temporal over-utilisation (4 weeks) Identify possible ways to maximise capacity (4 weeks) Strictly enforce UIOLI Buy-back capacities Ensure that capacity trading platforms are running and interlinked Incumbents: Engage in secondary market Sell back capacities to TSO Newcomers: Place requests for capacity on trading platform Assess situation and inform NRAs NRAs: Ensure legal requirements are upheld Investigate into further options 29 Aug 07 2 Transparency: Resolve transparency / confidentiality issues Transparency is essential TSOs: Comply with all transparency requirements (2 months) Incumbents: Critically question your own need for invoking three-minus NRAs: Critically examine three-minus applications 29 Aug 07 3 New investment and CAM Physical congestion?Planned capacity increase CAM for new capacities 21 Dec 07

21 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl II. Implementation Goals: Proposal by BNetzA / DTe (cont‘d) Impl. Goal DescriptionReasonRemedies / ToDo‘sDeadline 4 Products: Bundle or harmonise products, including harmonisation of booking Competition and trade are being hampered because transporting gas is highly complex. TSOs: Identify scope and limits for establishing a harmonised/bundled framework Coordinate with the goal of facilitating booking procedures, especially with respect to spot markets Shippers: Clearly define what is needed for efficient access on IPs NRAs: Ensure regulatory framework to facilitate efforts by TSOs 11 April 08 (5) Nomination / re- nomination / matching

22 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl II. Implementation Goals: Proposal by TSO(s) [xxx] Impl. GoalDescriptionReasonRemedies / ToDo‘sDeadline 1 29 Aug Dec April 08 (4) Instructions for adjacent TSOs: Please fill in the table together with connected TSOs. Do you agree with the findings of the report or are there other experiences? Is there any other issue of importance? Please use the following slides to specify on each implementation goal and its respective remedies.

23 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl II. Implementation Goal: Maximisation of Capacity TSO(s) should present answers to the following questions: Which specific measures you can reasonably implement to improve capacity situation? Reasons for low capacity utilisation rates Role and feasibility of stricter and more frequent application of UIOLI Room for improvements Role of investments Role and feasibility of auctions Can improvements be achieved within a reasonable timeframe?

24 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl II. Implementation Goal: Transparency TSO(s) should present answers to the following questions: which specific measures you can reasonably implement? Role, scope and feasibility of measures of improvement Room for improvement reasonable timeframe

25 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl II. Implementation Goal: Products TSO(s) should present answers to the following questions: which specific measures you can reasonably implement? Role, scope and feasibility of measures of improvement Room for improvement reasonable timeframe

26 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl II. Implementation Goal: xxx TSO(s) should present answers to the following questions: which specific measures you can reasonably implement? Role, scope and feasibility of measures of improvement Room for improvement reasonable timeframe

27 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl II. Implementation Goals: Proposal by Stakeholder(s) [xxx] Impl. GoalDescriptionReasonRemedies/ ToDo‘sDeadline 1 29 Aug Dec April 08 (4) Instructions for stakeholders: Please fill in the table (where possible together with other stakeholders). Do you agree with the findings of the report or are there other experiences? Is there any other issue of importance? Where you need additional space for your response, please use extra slides.

28 GRI – NW: Paris Workshop on Interconnections: Primary Market, 11 May 2007 Oude Statenzijl III. Way forward Details on Implementation Goal [1] :Responsibility (TSO1/ TSO2/ EG/ etc.) DeadlineDeliverable (e.g.: Action, report,...) 1.) Short Description of task 1 NRAsOne week before next meeting assess legal situation Including data exchange 2.) Short Description of task 2 TSOsOne week before next meeting provide data on: Technical booked available capacity; nominated contractual and net flows on daily basis 3.) Short Description of task 3 TSOs, EG, stakeholdersOne week before next meeting Proposal with concrete measures Report (early) results to RCC, lead regulators, lead TSOs 5 Sept. 07 Decision on the agenda: detailed next steps and deadlines for implementation goal increase available capacity Instructions for all meeting participants: This table is to be filled in at the meeting. Other tasks: EG: Report outcome of kick-off meeting to RCC by 18 May 07 Next meeting: [15 or 28 june], [hannover], [BEB]