14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

The Detector Control System – FERO related issues
P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
André Augustinus 16 June 2003 DCS Workshop Safety.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
1 Responsibilities & Cost ALICE DCS Review 14 Nov 05 For the DCS Team L.Jirden.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
Robert Gomez-Reino on behalf of PH-CMD CERN group.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
ALICE Electronic Logbook MEST-CT Vasco Barroso PH/AID.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
André Augustinus 16 September 2002 Safety issues.
Peter Chochula ALICE DCS Workshop, October 6,2005 DCS Computing policies and rules.
June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE End of Project 15 TH SEPTEMBER 2012 This research project has been supported by a Marie.
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
JCOP Review, March 2003 D.R.Myers, IT-CO1 JCOP Review 2003 Architecture.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
André Augustinus 21 June 2004 DCS Workshop Follow-up from last workshop.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
ALICE. 2 Experiment Size: 16 x 26 meters (some detectors >100m away from IP) Weight: 10,000 tons Detectors: 18 Magnets: 2 Dedicated to study of ultra.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
CMS – The Detector Control System
Controlling a large CPU farm using industrial tools
The LHCb Run Control System
Presentation transcript:

14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage Trainee Program at CERN

14 November 08ELACCO meeting2 About me…  Lionel Wallet, 26 y.o.  Nationality : French  Studies : Master Degree in Engineering.  Skills : Control System / Software Engineering  EST Fellow at CERN since August 2006  Integration of the Alice Controls Coordination Team

14 November 08ELACCO meeting3 Marie Curie Fellowship My work in 3 Key Words….

14 November 08ELACCO meeting4 ALICE environment ~ 55m ~ 50m BEAM HLT Control DAQ racks detectors ACR Detectors strong magnetic field Experimental cavern Counting rooms computer farms databases ALICE Control Room operator consoles

14 November 08ELACCO meeting5 18 detectors ~150 sub-systems SPDPHOFMDT0V0PMDMTIMTKZDCACOSDDSSDTPCTRDTOFHMP Controls Back-end Services Gas Electricity Cooling Magnets Access Infrastructure B-field Space Frame Environment Radiation Beam Pipe On-line Trigger DAQ HLT ECS Safety CSAM DSS External Systems Accelerator Offline Control Context

14 November 08ELACCO meeting6 System Layer counting room cavern ALICE Control Room operator LV Devices Worker Node LV OPC PVSS Ethernet worker node DIM PVSS worker node DIM PVSS Worker Node DIM PVSS Ethernet DETECTOR Worker Node HV OPC PVSS HV Devices CANbus FEE Devices Operator Node PVSS Ethernet D D D D

14 November 08ELACCO meeting7 My Contributions 3 Key Words….

14 November 08ELACCO meeting8 Coordination Small central team (ACC) collaborating with : - Alice Detector Experts & LHC experiments (JCOP) - In total ~100 people involved Coordination for the control of the devices based on OPC servers - High Voltage, Low Voltage, ELMB….around 1000 devices in total - Test of the control tools (Interfaces, OPC server, Client) - Writing guidelines - Integration of the software tools in Alice DCS (Installations / Upgrades) Achieve a homogeneous Control System

14 November 08ELACCO meeting9 Development Based on PVSS 3.6 SCADA ISEG Framework component - (Generic client for a High Voltage Device control) Custom Framework Component - (Alice VME Crate, Alice Magnet Control System) Monitoring of the Services (Bfield, MCS, NMR, VME crates) Finite State Machine custom solution for Alice users

14 November 08ELACCO meeting10 Support ISEG High Voltage Device at CERN (OPC server + PVSS Client) - Official Contact at CERN for the ISEG Company (Germany) - Centralize the Users requests at CERN - Report (or fix) the problems Devices controlled via OPC server and PVSS client in Alice - Provide help to the Users - Provide the recommended / tested versions of the software's - Fix (or report) the problems Alice DCS operator - Shifts in the control room - On call support

14 November 08ELACCO meeting11 Trainings & Publications JCOP – Joint PVSS – JCOP Framework (September 2006, 1 week, CERN) JCOP – Finite State Machine (October 2006, 3 days, CERN) English Courses LEVEL 8 (September 2006, few months, CERN) Computing School of CERN (August 2007, 2 weeks, Croatia) C++ Object Oriented programming (2008, 3 days, CERN) Matrikon OPC server workshop (coming soon, 2 days, Amsterdam / Netherlands) Trainings Conferences ICALEPCS’07 (October 2007, 1 week, Knoxville / USA) ESOF’08 (August 2008, 1 week, Barcelona / Spain)

14 November 08ELACCO meeting12 Trainings & Publications 7 presentations for the Alice DCS workshop : - Oct’06, Mar’07, July’07, Oct’07, Mar’08, July’08, Oct’08 Participation to the Poster Session at ICALEPCS’07 (USA) Participation to the Control Poster Session at CERN Presentations / Posters Papers Standard Device Control via PVSS Object Libraries in Alice. (Author) Alice Control System – Ready for the LHC operation. (co-Author)

14 November 08ELACCO meeting13 Conclusion Thank you for your attention !