U.S. Section International Boundary and Water Commission Rio Grande and Tijuana River Flood Control Projects Programmatic EIS.

Slides:



Advertisements
Similar presentations
Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
Advertisements

LOWER SALMON RIVER Tributary Protection and Enhancement.
Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
Identify Problems, Planning Objectives and Constraints.
US Army Corps of Engineers BUILDING STRONG and Taking Care of People! Ecosystem Restoration Along the Los Angeles River: Creativity within Concrete Dan.
Environmental Compliance Negotiating our way through the process…
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
The Role of State, Local and Tribal Governments in the Federal NEPA Process Presented by Susan E. Bromm Director, Office of Federal Activities United States.
1 Planning and Environment Linkages: Case Studies Michael Culp and John Humeston FHWA November 2, 2006.
Presented by: Terri Gaines DWR FESSRO February 28, 2014 Regional Permitting for the CVFPP.
Coastal Zone Federal Consistency The most powerful permitting program you’ve probably never heard of…
Historical Background to NEPA Early 60’s – Congress starts to consider growing pollution problem Early 60’s – Congress starts to consider growing pollution.
Watershed Management in MA The Deerfield River Watershed Action Plan Kate Crawford, River Corridor Management, October 10, 2005
NHPA, Section 106, and NEPA Highlights and Misconceptions.
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Forest Plan Revision Using the 2012 Planning Rule Process Overview Steps and Expectations (I don’t know….but I’ve been told…if the horse don’t pull….you.
Connecticut Department of Transportation Bureau of Policy & Planning.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
1 Cooperating Agency and Coordination Training Washington State Association of Counties Friday, November 22, 2013 Victoria Barr, Oregon/Washington State.
MassDOT P3 Project Overview. MassDOT Project Mobility.
US FOREST SERVICE REGIONAL ROUNDTABLE Planning Rule Revision Photographer: Bill Lea.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
What does an Environmental Professional Do?
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
Buckhorn Mountain EIS Project August Buckhorn Mountain Exploration Project Echo Bay Exploration is seeking federal and state authorization for.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
1 Environmental Planning in the Army Corps of Engineers Ch 2 Mod 5 Relationship of the NEPA to Principles & Guidelines
CHAPTER 1 FOUNDATION. 1.1 National Environmental Policy Act (NEPA) “An act to establish a national policy for the environment, to provide for the establishment.
MMS Alternative Energy Program November 28, 2007.
Integrated Regional Watershed Management Plan Presentation – March 12, 2013 HLVRCD.
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Flood Risk Management Cosgrove Creek Section 205 Planning Basics.
Streamlining NEPA for Reusable Launch Vehicles Federal Aviation Administration Associate Administrator for Commercial Space Transportation October 2004.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
Effects Analysis and Comparison. Objectives Accurately determine which impacts need to be evaluated in the land use plan. Develop a matrix comparing the.
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
RIO GRANDE WATERSHED FEDERAL COORDINATING COMMITTEE (RGWFCC) BACKGROUND: Congressman Sylvestre Reyes formed the RGWFCC in response to the need for improved.
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
Managing the Environmental & Project Development Process Presented by the Ohio Department of Transportation NEPA&CEQ.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
In the ideal world… Transportation planning addresses NEPA principles. Collaboration/involvement starts in transportation planning. Planning leads to early.
United States Department of Interior Bureau of Land Management Winnemucca District Draft Resource Management Plan and Draft Environmental Impact Statement.
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
Executive Order Environmental Stewardship and Transportation Infrastructure Project Reviews Priority Issues.
National Environmental Policy Act An established US national policy Draft Year: 1969 Amendment Years: Section amended May 27, 1986 “Environmental.
Integration of National Environmental Policy Act (NEPA) and National Historic Preservation Act (NHPA) NEPA and NHPA A Handbook for Integrating NEPA and.
Environmental Planning in the Army Corps of Engineers Relationship of the NEPA to Principles & Guidelines 1 Ch 2 Mod 5
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
Willow Meadows Civic Club Meeting September 13, 2011
ACA Conference - September 2017
Overview What is the CEQA environmental review process?
National Environmental Policy Act of 1969 (NEPA)
National Environmental Policy Act (NEPA)
National Environmental Policy Act of 1969 (NEPA)
IS YOUR LOCAL GOVERNMENT PREPARED
NEPA Assignment Program Overview
Presentation transcript:

U.S. Section International Boundary and Water Commission Rio Grande and Tijuana River Flood Control Projects Programmatic EIS

USIBWC Flood Control Projects u USIBWC intends to prepare a Programmatic Environmental Impact Statement (PEIS) for management activities of flood control projects in the U.S. portions of the Rio Grande and Tijuana Rivers u Management activities may include: u Structural activities (construction) u Non-structural activities (maintenance) u Collaboration with other agencies and landowners

Why a Programmatic EIS? u Council on Environmental Quality (CEQ) Encourages a Tiered Process: u Per CFR u Coverage of a program or plan in a broader EIS is called a Programmatic EIS (PEIS) u Subsequent narrower EAs or EIS’s for specific projects

Recent USIBWC EIS’s u PEIS and EIS Relationship u Incorporate information already developed u Status of Canalization EIS u Record of Decision

NEPA Process - PEIS Identification of Stakeholders Public Notification Scoping Meetings Development of Alternatives Draft PEIS Public Hearings Respond to and Incorporate Comments Final PEIS Record of Decision S c o p i n g P r o c e s s Public Participation Proposed Agency Action Stakeholders

USIBWC Projects u USIBWC manages four flood control projects along the Rio Grande u Canalization Project – Percha Dam to American Dam u Rectification Project – El Paso to Ft. Quitman u Presidio-Ojinaga Project u Lower Rio Grande Project – From Peñitas to the Gulf of Mexico u USIBWC manages the Tijuana River Flood Control Project (U.S. portion)

USIBWC Projects

Program Purpose and Need u The purpose of the proposed federal action is to: u Identify and evaluate alternatives for the management of existing projects u Assist USIBWC to comply with its mandate for flood protection, water deliveries, and/or boundary stabilization u Identify opportunities to enhance environmental resources u Coordinate with other entities in the development of recreational opportunities

Alternatives Formulation

Alternatives are organized around different themes Flood Control Water Supply Rip Hab Recrea. Water Quality FloodControl Flood Control Aquatic Hab Rip Hab Recrea- tion Wat Qual Recreation Fl Control Water Sup Riparian Habitat Recrea. Wat Qual Habitats Aquatic Habitat Flood Control Water Supply Aquatic Habitat Recrea- tion Riparian Habitat Water Quality Alternatives Restoration Strategies Method

Formulation process 1. Identify objectives and performance measures u Flood control u Water supply u Environmental enhancement u Recreational opportunities u Implementability (cost, social impacts) u Inter-agency cooperation

Formulation process 2. Identify ‘concepts’ organized by objective u Flood control and water deliveries: levee improvements, sediment control u Environmental enhancement: native vegetation management, diversify habitat u Recreational opportunities: coordination with adjacent parks, trails u Implementability: cost, acceptance u Interagency cooperation: Border Patrol activities

Formulation process 3. Initial screening of concepts based on fatal flaw analysis 4. Identify flood control issues/problem areas u U.S. Army Corps of Engineers levee survey u Previous hydraulic modeling u Previous alternative formulations & analyses u USIBWC experience

Formulation process 5. Identify water delivery issues/problem areas u USIBWC experience u Sediment control 6. Divide river into ‘River Management Units’ or similar concept 7. Identify environmental enhancement and recreational opportunities by RMU

Formulation process 8. Formulate alternatives based on: u Flood control issues and needs u Water supply issues and needs u Environmental enhancement opportunities u Recreational opportunities 9. Evaluate alternatives based on objectives and performance measures

Environmental Impacts

Environmental Resource Categories u Biological Resources u Water Resources u Air Quality u Land Use / Agricultural Issues u Urban / Energy Issues u Recreational Resources u Cultural Resources u Indian Tribal Lands u Environmental Justice u Visual Resources u Regional Economics u Public Health / Environmental Hazards

Types of Environmental Impacts u Direct u e.g., vegetation removal u Indirect u e.g., increase in water temperature u Short-term u e.g., fugitive dust from construction u Long-term u e.g., promote native vegetation u Cumulative u resulting from proposed and other actions in project area

Impacts on Biological Resources u Assess Impacts to u Habitats –Aquatic –Riparian –Terrestrial u Species –Ecologically important –T&E –State special concern

Impacts on Biological Resources u Assess Impacts from u Water Quality u Water Quantity u Sediment/Soil Quality u Habitat Loss/Degradation –Construction –Vegetation removal –Sedimentation u Invasive/Exotic Species

Next Steps u Complete Scoping Process – Early 2005 u Preparation of Draft PEIS – Most of 2005 u Public/Agency Review of Draft PEIS – Late 2005 u Public Hearings – Late 2005 u Final PEIS – Early 2006 u Record of Decision – Early 2006

THANK YOU