A second Thyristor Controlled Static Var Compensator for SPS

Slides:



Advertisements
Similar presentations
© ABB Group May 1, 2015 | Slide 1 Large scale integration of Offshore Wind Power Design Considerations Peter Sandeberg /ABB, EOW 2009,
Advertisements

Voltage Demonstration Steven Gough Innovation and Low Carbon Network Engineer
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
New Orleans, LA July 8, 2004 John Zemanek Vice President, Transmission Entergy Transmission Planning Summit.
Presented by: Bikram Choudhury Regd. No. : Department of Electrical And Electronics Engineering FACTS Devices For Smart Grid 2 July 2015.
© ABB Group August 7, 2015 | Slide 1 Variable Shunt Reactors Optimize Transmission Systems Dr. Claes Bengtsson, Global Product Manager, Reactors. PowerGen.
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
Power Converters and Power Quality Karsten KAHLE, CERN CAS Power Converters 2014, Baden (CH) 2.
ET2105 Electrical Power System Essentials
Electrical power distribution in experiments W.Iwanski.
PSB Main Power Supply Serge Pittet Jean-Paul Burnet, Karsten Kahle, Fulvio Boattini, Max Chamiot-Clerc TE-EPC Serge PITTET LIU-2011 Event, 25/11/2011.
F. Ferrandis_SP_ALPHA 2_BLOCK 2_Paper 35_Presentation Barcelona May POWER FACTOR CORRECTION WITHIN INDUSTRIAL SITES EXPERIENCES REGARDING.
POWER FACTOR CORRECTION
HomeNextPrevious I. INTRODUCTION II. WIND TURBINE GENERATOR MODEL III. STATCOM MODEL IV. SIMULATION RESULT CONTENTS OF TOPIC V. CONCLUSION Previous HomeNextHomePreviousNextHome.
Svc. Transformer A step-down transformer is usually placed between the AC system bus-bar and the low voltage bus-bar to which the thyristor valves are.
Preliminary Studies of the Electric Power Distribution for CLIC
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
THYRISTOR BASED FACTS CONTROLLER
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Circuit Master Circuit Master™ uses three PROVEN technologies* – Capacitor (reduces DEMAND) – Harmonic Filter (harmful frequencies) – Surge Protection.
Trieste (IT), 20 may 2008POPCA A novel 60 MW Pulsed Power System based on Capacitive Energy Storage for CERN PS machine Jean-Paul BURNET CERN, European.
Page 1J. Hourtoule, Electricity contract: scope and forecasted consumption, 16/07/2015 © ITER Organization Electricity Supply Contract: For the ITER Site.
1 POWER QUALITY -- Bhanu Bhushan -- April, Simple examples around us : Ceiling fan regulators Tube lights Lap-tops & peripherals Domestic inverters.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Clemson University Electric Power Research Association CHANDANA BOMMAREDDY CLEMSON UNIVERSITY DG VOLTAGE CONTROL IN AN ISLANDING MODE OF OPERATION.
May 2015 MAJOR INDUSTRIES and PRODUCTS. Frequency converters, Softstarters, Rectifiers for Drive Applications Proton-Electrotex Parts Used: IGBT (HS Code.
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Jean-Paul BURNET, AB/PO ATC-ABOC days, 22 January 2007 PS Main Power System: What has been done from June 2006? What will be the situation in 2007? PS.
Control, monitoring and safety aspects of electrical distribution in the Atlas experiment W.Iwanski PH/ESE-BE.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Power Quality Karsten KAHLE Electric Power Converter Group (TE-EPC) High Power Converter Section Review of CERN’s Electrical Power Network October.
Static Var Compensator Status (SVCs for Booster and SPS) Situation in 2009 Karsten KAHLE, TE-EPC ATOP days March 2009.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
THE NEW STATIC VAR COMPENSATOR FOR SPS – COMMISSIONING RESULTS based on the CIRED2003 conference paper from K. Kahle, J. Pedersen (CERN) and T. Larsson,
REACTIVE POWER COMPENSATION
LARSSON SE Session 2 – Block 2 Barcelona May The new 150 Mvar, 18 kV SVC at CERN – background, design and commissioning K. Kahle, J Pedersen,
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
POWER QUALITY AND NETWORK DISTURBANCES in CERN’s electrical network K. KAHLE, TS-EL Diploma students R. Sternberger, M. Neubert 1 st TS Workshop Archamps,
The history of BALTIC WIND SOLUTIONS growth 2 Experience Quality Safety Accepting the challenge 3 What is BALTIC WIND SOLUTIONS?
POPS: Power for PS A novel 60 MW Pulsed Power System based on Capacitive Energy Storage Jean-Paul Burnet June 2010.
André Augustinus P2 events & perturbations 07 May 2010 ALICE Technical Coordination Meeting.
Study of Line-used Magnetically Controlled Reactor(MCR) Zhanfeng Deng China Electrical Power Research Institute.
Presentation CERN SPAIN | ITALY | FRANCE | GERMANY | MEXICO | USA | BRAZIL | UAE | QATAR | OMAN | SAUDI ARABIA jema.es.
Roberto Saban/TSPS&SPS Days – January 2005 the background Following a request by the DG and after a comprehensive tour of the responsibilities of the Department,
© ABB Group October 1, 2016 | Slide 1 DynaPeaQ ® SVC Light ® with Energy Storage FACTS.
 The common type of wind power generators are squirrel cage induction generator (SCIG),doubly fed induction generator (DFIG)  For more secure and.
A Project Review On POWER QUALITY IMPROVEMENT IN GRID USING STATECOM
Situation of the Static Var Compensators at CERN.
SUB-STATIONS.
FACTS BY SVC, FLEXIBLE AC TRANSMISSION
SIMULATION AND IMPLEMENTATION OF FC-TCR
IG BASED WINDFARMS USING STATCOM
Development of a Marx-Generator for the drive beam electron gun
the CERN Electrical network protection system
SPS activities during LS2 TE-EPC (Power Converter Group)
Transmission Solutions
POPS Strategy for Restarting & Repairing
Business opportunities related to CERN electrical network
UNIFIED POWER QUALITY CONDITIONER
Connecting the London underground to the public grid: solutions for safeguarding of power quality R Grünbaum, M Noroozian, A Palesjö, ABB Presented by.
Grid integration and stability of 600MW windfarm at Kriegers Flak
Static VAR Compensator (SVC)
FACTS BY SVC, FLEXIBLE AC TRANSMISSION
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

A second Thyristor Controlled Static Var Compensator for SPS TS Workshop, Archamps 24. – 26.5.2005 A second Thyristor Controlled Static Var Compensator for SPS Karsten KAHLE, TS-EL 1. TS Workshop, Archamps 2004

A second Thyristor Controlled Static Var Compensator for SPS TS Workshop, Archamps 24. – 26.5.2005 A second Thyristor Controlled Static Var Compensator for SPS 1. Introduction 2. Purpose of SVC 3. SPS Electrical Network 4. Project description 5. Planning / Budget 6. Conclusions Karsten KAHLE, TS-EL 1. TS Workshop, Archamps 2004

1. Introduction History: Renovation of BE substation (2001) Installation of new SVC2 (2001) now: SVC3 (1976) is obsolete and needs replacement SVC3: - Existing SVC3 is based on Saturated Reactor technology new SVC3 will be Thyristor Controlled Reactor (TCR) company ABB Sweden (contractual Option for second TCR) Intro. Purpose Network Project Planning Conclusions 1. TS Workshop, Archamps 2004

1. Introduction Existing installation SVC3 Intro. Purpose Network Project Planning Conclusions 1. TS Workshop, Archamps 2004

1. Introduction Obsolete Saturated Reactor Intro. Purpose Network Project Planning Conclusions 1. TS Workshop, Archamps 2004

1. Introduction Future Thyristor Controlled Reactors Reactors HV Thyristors Intro. Purpose Network Project Planning Conclusions 1. TS Workshop, Archamps 2004

2. Purpose of SVC Voltage stabilization 18 kV (400kV) * disturbances due to pulsating load Harmonic filtering * harmonics generated by power converters Compensation of Reactive Power taken from 400 kV grid * reactive power consumed by power converters / magnets Purpose Intro. Network Project Planning Conclusions 1. TS Workshop, Archamps 2004

2. Purpose of SVC without SVC with SVC Voltage variation 18 kV: 14 % 0.75 % Harmonics (>50 Hertz): 20 % 0.5 % Reactive Power variation: 90 Mvar 10 Mvar Without SVC - SPS cannot operate - CERN would disturb 400 kV European Network Purpose Intro. Network Project Planning Conclusions 1. TS Workshop, Archamps 2004

3. SPS Electrical Network 2007 400 kV T1 T2 T3 18 kV SPS SPS SVC3 SVC1 SVC2 Year 1974 Year 2001 (Year 1976) Year 2006 Network Intro. Purpose Project Planning Conclusions 1. TS Workshop, Archamps 2004

3. SPS Electrical Network 2008 400 kV T1 T2 T3 18 kV SPS SPS SVC3 SVC1 SVC2 SVC1 SVC3 Year 1974 Year 2001 Year 2006 Intro. Purpose Network Project Planning Conclusions 1. TS Workshop, Archamps 2004

4. Project description - dismantling of Saturated Reactor dismantling of building, modif. concrete platform (CE) new pre-fabricated building (ABB) Thyristor Controlled Reactors (ABB) cooling water supply for thyristors (CV) new outdoor filter installation (TS-EL) controls, protection, optical fibres etc. (TS-EL) Project Intro. Purpose Network Planning Conclusions 1. TS Workshop, Archamps 2004

4. Project description Dismantling of reactor building Project Intro. Purpose Network Planning Conclusions 1. TS Workshop, Archamps 2004

4. Project description filter capacitors Recuperation of Capacitors (value 1 MCHF) and Civil Engineering (500 kCHF) Intro. Purpose Network Project Planning Conclusions 1. TS Workshop, Archamps 2004

4. Project description busbars filter resistors filter reactors Recuperation of busbar system (value 200 kCHF) busbars filter resistors filter reactors Intro. Purpose Network Project Planning Conclusions 1. TS Workshop, Archamps 2004

Budget for SVC Project: 6 Mio.CHF 5. Planning / Budget Q1 / 2005 Start of project Q1 / 2007 SVC3 ready for SPS operation Q4 / 2007 Modification of BE substation (inversion) Q1 / 2008 SVC’s and BE substation ready ??? Dismantling of second Saturated Reactor Budget for SVC Project: 6 Mio.CHF Planning Conclusions Intro. Purpose Network Project 1. TS Workshop, Archamps 2004

6. Conclusions 2007: SPS Network Ready for LHC Era First new SVC and BE substation for SPS in 2001 Now: second SVC, ready for 2007 (identical Option, ABB) replacement of obsolete Saturated Reactor then: 2 identical modern SVC’s for SPS SVC2 and SVC3: proven technology, industrial solution high reliability, fast repair 2007: SPS Network Ready for LHC Era Conclusions Planning Intro. Purpose Network Project

Questions ? Thank you. Conclusions Planning Intro. Purpose Network Project 1. TS Workshop, Archamps 2004