K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.

Slides:



Advertisements
Similar presentations
LINAC4 and 3 MeV test stand at CERN
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
R Scrivens, CERN, ABI Workshop, 12/2008 The Feschenko Bunch Shape Monitor User experience at CERN Developed by INR, Troitsk. High resolution bunch shape.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
Ulrich RaichLinac-4 instrumentation day May 2007 Longitudinal Bunch Shape Monitor U. Raich.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
Managed by UT-Battelle for the Department of Energy SNS MEBT : Beam Dynamics, Diagnostics, Performance. Alexander Aleksandrov Oak Ridge National Laboratory.
ESS DTL beam commissioning
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
Transverse Profiling of an Intense FEL X-Ray Beam Using a Probe Electron Beam Patrick Krejcik SLAC National Accelerator Laboratory.
Beam diagnostics in the beamlines
LINAC4 COMMISSIONING A.Lombardi BCC 8-19 Nov 09 Linac4 BCC Nov 2009Alessandra Lombardi.
Alexander Aleksandrov Oak Ridge National Laboratory
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Report from Task Force on Beam Instrumentation Stephen Molloy.
Beam Instrumentation for the HIE-ISOLDE linac Francesca Zocca ISOLDE Workshop and Users Meeting December CERN Instituto de Estructura de la.
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
Radioactive Ion Beams CW 0.5 MW (for protons) 1 GeV (for protons) p to U Chiara, Manuel, Adam, HuiMay 2011, CAS, Bilbao.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
Instrumentation and Tools for LIU and HL-LHC B. Mikulec with the invaluable input from many colleagues from ABP, OP, RF and BI HL-LHC/LIU Day 15 th of.
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
Commissioning of the PSB with Linac4 K.Hanke / CERN Review on PS Booster with Linac4 CERN, January 15-16, 2009.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
CERN, 29.January 2009Uli Raich AB/BI 3 MeV instrumentation commissioning U. Raich Linac-4 Beam Coordination Committee
SNS Beam Diagnostics A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Working Group 5 ProjectX Collaboration Meeting April 12-14, 2011 Summary Talk M. Wendt and W. Blokland Controls, Instrumentation & Protection.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
The Preparation for CSNS Accelerator Commissioning Sheng Wang June 8, 2015, Dongguan.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
ESS Front End diagnostic
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
Experience with beam instrumentation at Linac4
Performance of BI systems at HIE-ISOLDE
BE-BI Software for LINAC4
LINAC 4 source & LEBT measurement results
LINAC4 LEBT beam size and emittance diagnostics
Thermal emittance measurement Gun Spectrometer
LINAC4 commissioning plans etc.
Diagnostics overview and FB for the XFEL bunch compressors
Collective Effects and Beam Measurements in Particle Accelerators
Considerations on Beam Diagnostics Physics
Linac/BC1 Commissioning P
commissioning and measurements
Beam Commissioning at ESS
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Linac Diagnostics Commissioning Experience
DTL M. Comunian M. Eshraqi.
(Beam) Commissioning Plan
Beam Commissioning Planning
Presentation transcript:

K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical responsibility)

K.Hanke / TDR Meeting / 13 June 2006 We divide the diagnostics in two main categories: commissioning and day-to-day operation. The first will be used to find the right settings of the machine and to study the beam quality and machine performance. The second will be used to survey the machine and for fine tuning. General Remarks

K.Hanke / TDR Meeting / 13 June 2006 Commissioning source/LEBT: intensity: retractable Faraday cup and beam current transformer. emittance: scanning slit device with SEM grid (also steering, quantify sc compensation and commission pre- chopper; time resolution required) measurement in stages: source, first solenoid, RFQ input plane energy spread: temporary set-up with slit, spectrometer and SEM grid; read-out of SEM time resolved; additional FC at exit of spectrometer line. RFQ and chopper line: IPHI diagnostic line (TOF energy measurement, dipole, wire scanners, pick-ups). chopper line: two beam current transformers and BSHM

K.Hanke / TDR Meeting / 13 June 2006 Commissioning DTL tank 1, 2, 3: movable diagnostics bench (MB): transmission, transverse and longitudinal emittance, energy and energy spread, set rf phase and voltage. moving slit device (transv. emittance) energy degrader (set phase) Faraday cup time-of-flight energy measurement bunch length measurement (Feschenko monitor) CCDTL, SCL: setting-up using the permanently installed diagnostics full commissioning (only at high energy): transport the beam to a permanently installed measurement line at the exit of the linac (depending on installation schedule) energy: spectrometer dipole in the ML and time-of-flight (phase pu) in the linac bunch length measurement (Feschenko monitor)

K.Hanke / TDR Meeting / 13 June 2006 Operation source/LEBT/RFQ/chopper line: intensity: retractable Faraday cup and beam current transformer. profile: SEM grid. RFQ and chopper line: intensity: two beam current transformers permanently installed upstream and downstream of the chopper. position/phase/intensity: 3 pick-ups

K.Hanke / TDR Meeting / 13 June 2006 Operation DTL, CCDTL, SCL: position/phase/intensity: after each tank of the DTL, after each of the 8 modules of the CCDTL and after each of the 4 modules of the SCL. combined position and phase pu, which measures also the beam current within 5%. beam loss (interlock!): BLMs along the linac and transfer line. beam current: in addition “real” beam current transformers after DTL, CCDTL, SCL and in the transfer line (HEBT). beam profile (SEM grids): after tank 3 of the DTL, after modules 4 and 8 of the CCDTL and after modules 2 and 4 of the SCL.

K.Hanke / TDR Meeting / 13 June 2006 Exit of Linac and Transfer Line exit of linac: measurement line for transverse and longitudinal emittance and energy, transformer transfer line: position/phase/intensity: pick-ups, transformers and beam loss monitors.

K.Hanke / TDR Meeting / 13 June 2006 Diagnostics Overview systempositionquantity time-of-flightMB/Linac1/1 spectrometerLEBT/MEBT/ML1/1/1 phase pick-upMB/MEBT/DTL/CCDTL/SCL/HEBT1/3/3/8/4/12 beam position monitor MB/MEBT/DTL/CCDTL/SCL/HEBT1/3/3/8/4/12 beam current transf.LEBT/MEBT/MB/DTL/CCDTL/SCL/ HEBT 1/2/1/1/1/1/7 beam profile monitorLEBT/MB/DTL/CCDTL/SCL/BI1/1/1/2/2/8 moving slitMB/ML/HEBT(LBE)1/1/1 bunch length monitor MB/ML1/1 Faraday cupLEBT/MB1/1 beam loss monitorMB/linac/HEBT1/8/20

K.Hanke / TDR Meeting / 13 June 2006 Diagnostics Overview DTL DTL tank1DTL tank2DTL tank3 BLM SEM Grid Beam Loss Monitor Beam Current Transformer Position, Intensity and Phase pick-up

K.Hanke / TDR Meeting / 13 June 2006 CCDTL module1 CCDTL module2 CCDTL module3CCDTL module4 BLM Diagnostics Overview CCDTL 1-4

K.Hanke / TDR Meeting / 13 June 2006 CCDTL module5 CCDTL module6 CCDTL module7CCDTL module8 BLM Diagnostics Overview CCDTL 2-8

K.Hanke / TDR Meeting / 13 June 2006 SCL module1 SCL module2 SCL module3 SCL module4 BLM Diagnostics Overview SCL

K.Hanke / TDR Meeting / 13 June 2006 Technical Specifications Need input from AB/BI - Beam current transformer - SEM Grid - Bunch Length Monitor - Time of Flight - Spectrometer dipole - Phase, position and current pick-up - Beam Loss Monitor