Michał Matusiak Sławomir Wronka

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Progress on Target Design Chris Booth Sheffield 2 nd August 2004.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Compressor status AWAKE Technical Board meeting 19 May 2015.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Target Design – Status and Plans Chris Booth Sheffield 12 th January 2005.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Linac Marx Modulator Update Trevor Butler 10/29/2014.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
VNIIA neutron generators for thermonuclear research
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.Funding is available to purchase magnets. 2.Comment during presentation of attached slides: 180.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
C. Schnappinger & J. Ziegler 1/06/2006 # 1 E-Zapper Support Electronics Note: Cabinets may be separated into two pieces (sideways), but vertical components.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
HIGH VOLTAGE UNION Vacuum Circuit Breaker 110 kV VRS-110 Series ВЫСОКОВОЛЬТНЫЙ СОЮЗ
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
Treatment Machines for External Beam Radiotherapy
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
S A Griffiths CM42 June 2015 Electrical & Control.
Report Technical Director Storage-Ring-Installation Completed
Areal RF Station A. Vardanyan
High efficiency work and MBK development for accelerators
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
ELENA installation and commissioning status
CLEX* Status and Plans CTF3 complex CLEX
ELENA – Electron Cooler
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Target and Horn status report
DC Injector and Space Charge Simulation Status
BEPCII RF POWER SOURCE AND INPUT COUPLER
Figure 18.1 Typical port fuel-injection system, indicating the location of various components. Notice that the fuel pressure regulator is located on.
Injector Performance Requirements Conventional Facilities Update
LCLS Injector: Introduction D. H
Teleconference ACS – FREIA 20th February 2018
Electron Source Configuration
ATF 120 Hz Photocathode RF Gun Injection System Design Studies
Advanced Research Electron Accelerator Laboratory
Ion Source and LEBT control system topology, Interlock strategy
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Teleconference ACS – FREIA 19th June 2017
Generation of Magnetized Bunched Electron Beam for MEIC Cooler
Presentation transcript:

Michał Matusiak Sławomir Wronka GBAR Linac Michał Matusiak Sławomir Wronka

ACCELERATOR IN THE GBAR PROJECT Main supply Electric cabinet Klystron cooling system Accelerator cooling system

ACCELERATOR-HEAD 9MV accelerating structure Beam control system: YAG Screen, current transformer (DCCT FCT) Vacuum system: target and external valve, the valve to the pump, ion pump Thermal stabilization system Circulator (isolator 4-port), waveguide system Solenoid, Triplet

YAG SCREEN 3D DRAWING

CURRENT TRANSFORMER

GATE VALVE SERIES 48-SPECIFICATIONS

GATE VALVE SERIES 48-SPECIFICATIONS

GATE VALVE SERIES 48-SPECIFICATIONS

GATE VALVE SERIES 48-SPECIFICATIONS

ACCELERATOR-HEAD

All cavities manufactured Tuning in progress

KLYSTRON AND MODULATOR

COOLING SYSTEM FOR HEAD AND OTHER COMPONENTS Thermal stabilization of: accelerating structure and circulator Cooling of: klystron modulator, klystron, solenoid, solenoid structures Water requirements for klystron modulator

COOLING SYSTEM FOR HEAD AND OTHER COMPONENTS

ACCELERATOR CIRCUIT

KLYSTRON MODULATOR CIRCUIT

CIRCULATOR

CIRCULATOR

PARAMETERS OF CIRCULATOR

PARAMETERS OF CIRCULATOR

PARAMETERS OF CIRCULATOR

DOCUMENTATION OF SOLENOID

PARAMETERS OF SOLENOID Focus coil - All coil windings =242 - section Cu=22.4mm2 - height coil acc. dwg.= 24mm - All coil windings =1044 - current =7,5 A - height coil acc. dwg.=609mm - quantity ampere-turn = 1815 - current =50A - density current = 2,1 A/mm2 - quantity ampere-turn =52200 - resistance coil in temp.20°C= 0,69 Ω - density current =2,3 A/mm - voltage = 5,2 V - resistance coil in temp.20°C=048 Ω - power coil =39 W - voltage in temp.20°C =24 V -power coil in temp.20°C=1135W Corrective coils -16 ps. quantity scrolls in each coil = 120 Compensate coil : resistance coils=10,3Ω. - section Cu=3,53mm

DOCUMENTATION OF TRIPLET

PARAMETERS OF TRIPLET Focus coil Corrective coil - section Cu=0,50mm - All coil windings = 400,00 - All coil windings =318,00 - height coil =25,00mm - current =1,50 A - quantity ampere-turn = 600,00 - quantity ampere-turn =477,00 - density current =3,00 A/mm2 - resistance coil in temp.20°C = 1,21 Ω - resistance coil in temp.20°C =0,73 Ω - voltage in temp.20°C = 1,82 V - voltage in temp.20°C =1,10 V - power coil in temp.20°C= 2,73 W - power coil in temp.20°C=1,64W

DESICION ABOUT VERTICAL POSITION OF THE LINAC HAS BEEN TAKEN

Construction of the Linac support is finished and is currently under mechanical stress simulations Design includes target chamber, linac can be regulated +/-8mm in each direction with possibility for additional, small tilt Magnetic transporter must be verified due to collision with the bunker

Klystron localisation ? „By choosing a different IGBT 3,3kV rating instead of 1,7kV rating the IGBT will withstand Neutron radiation. We have several systems installed operating for long time with neutrons without failing.” Still, it is known that high dose of radiation will discolor the optical fibers and it can degenerate some sensitive microprocessors and memories. Keeping the radiation level low is therefore always a good idea to ensure longlife operation without any defects.

ELECTRONICS CABINET Control system based on PLC Siemens Power system for solenoid Vacuum control system AFC system

PARAMETRS MODULATOR OF KLYSTRON electrical specifications

Time schedule Delay in construction of the bunker and linac –vertical position of the linac decided in end of June Delay in the offer for klystron (finally achieved in June) Then stacked in our purchasing dept. Klystron modulator ordered – delivery in April 2016 First tests possible on our klystron (lower power), but full integration will take place in May 2016.