Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR 13.09.2013.

Slides:



Advertisements
Similar presentations
ICAO TEM/NOSS Symposium November 2005
Advertisements

Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
LSSIP Objective AOP01.2.
Objective ITY-COTR ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective NAV03 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
The European Organisation for the Safety of Air Navigation Objective AOP04.1.
LSSIP Objective AOP04.2.
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Dr. Barry Kirwan, EUROCONTROL Safety Culture Seminar introduction.
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Nigel Makins EUROCONTROL
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Visit of Mr Griffiths, DG CAA UK - 20 December 2007 EUROCONTROL.
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
Objective ATC 07.1 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Eurojust cases involving crimes against children
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Ag.no. 15 Lessons from the 2015 A65 exercise
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP04.1.
Objective ATC 02.7 ESSIP Plan 2015 Ingrid FEIJT DPS/PEPR
Ag.no.16 A65 country manuals and country assessments
State of play Article 5 reports
Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Programme adoptions Cohesion Policy:
Ag.no. 15 Lessons from the 2016 A65 exercise
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
LSSIP Objective AOP03.
Update on implementation WG F 27 April 2010 Maria Brättemark
Update on legal issues Strategic Coordination Group 23 February 2010
DG Environment, Unit C.2 Marine Environment and Water Industry
Presentation transcript:

Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR

2 Comprehensive Explanation  Implementation of Arrival MANager (AMAN) (metering, sequencing and advisory tool) (AMAN)  Scope: Multi-National (changed in ESSIP Plan ed to match the reports provided by individual ANSPs in the LSSIP 2012 exercise)  Applicability Area: AT / BA / BE / CH / CZ / DE / DK / ES / FI / FR / HR / IE / IT / LU / LV / MAS / NL / NO / PL / PT / RO / SE / UA / UK  Additional States have implemented basic AMAN functions (sequencing and metering without advisory tool) Detailed functionalities:  AMAN calculates the a/c sequencing for the concerned airport based on the  flight predicted trajectory,  environmental data (i.e. holding patterns),  declared airport capacity transferred into separation criteria (time) and  ATM separation criteria within TMA/CTR. AMAN provides strategic advise as to how to establish the calculated airport arrival sequence (delay on airway, flight in holding) Requirement: Initial Basic AMAN requires appropriate presentation of airport arrival sequence (arrival list) to the ACC and APP planning controllers. ESSIP Plan 2013 / Objective ATC 07.1

3 What is new or has changed in ESSIP Plan ed  SCOPE changed from ECAC to Multi-N ESSIP Plan 2013 / Objective ATC 07.1

4 Link to European ATM Master Plan  [TS-0102] - Basic Arrival Management Supporting TMA Improvements (incl. CDA, PRNAV) – ESSENTIAL ESSIP Plan 2013 / Objective ATC 07.1

5 Most important SLoA  ASP04 - Implement AMAN with advisory tool (ASP01 only refers to AMAN function concerning the sequencing and metering).  ASP02 & ASP03 - Definition, validation and implementation of ATC procedures for an operational use of AMAN tool, including the changes in the TMA organisation (SID/STAR and adapted holding patterns). Note: The implementation scope has to be defined locally, depending on the complexity of concerned TMAs ESSIP Plan 2013 / Objective ATC 07.1

6 Finalisation Criteria and Closed Questions  Ensure AMAN is part of new systems, or:  implemented during upgrade of current system.  AMAN can be implemented as a stand alone system; providing advice to arrival management using a separate system trajectory and presentation facility (  stand-alone Controller Working Position (CWP) for AMAN function)  AMAN initial basic in operational use?  Basic AMAN implemented? ESSIP Plan 2013 / Objective ATC 07.1

7 Supporting Material  The relevant Operational Requirements Document (ORD) and functional specification were produced by EATCHIP in 1997/1998. Note: These documents have not been revised since.  EROCONTROL Arrival Manager Implementation Guidelines and Lessons Learned Edition ESSIP Plan 2013 / Objective ATC 07.1

8 ESSIP Report 2012  This objective exists since 1995 and very slow progress has been recorded in the last 18 years.  At December 2012, 10 (out of 21) States declared the objective as Completed  No delay reported for the implementation of this objective. This is mainly due to the postponement of its Full Operational Capability date, which in 2011 (ESSIP Plan ed. 2012) was changed from 12/2010 to 12/2015. ESSIP Plan 2013 / Objective ATC 07.1

9 Links and contacts  Objective Coordinator: Dell’Orto Luca,  EUROCONTROL Objective Expert(s): Paul Conroy Predrag Terzioski, ESSIP Plan 2013 / Objective ATC 07.1