WP4-CHOPPER coordinated by A. Lombardi HIPPI yearly meeting, sep28-sep COSENERS HOUSE- Abington Hosted by CCLRC
General info Contributors : RAL : C. Prior, M. Clarke-Gayther, G. Bellodi, C. Plostinar RAL : C. Prior, M. Clarke-Gayther, G. Bellodi, C. Plostinar CERN : M. Paoluzzi, F. Caspers, M. Morvillo, L. Bruno, K. Hanke, E. Sargsyan, J.B. Lallement, M. Hori, A. Lombardi CERN : M. Paoluzzi, F. Caspers, M. Morvillo, L. Bruno, K. Hanke, E. Sargsyan, J.B. Lallement, M. Hori, A. Lombardi WEB site : Yearly meeting : april 2005 joint with WP5
Publications CARE Conf HIPPI (PAC05) Michael A. Clarke- Gayther “Fast-Slow” Beam Chopping for Next Generation High Power Proton Drivers CARE/HIPPIDocument M. Paoluzzi Status of cern chopper driver and the solid state alternative CARE/HIPPI Document M. A. Clarke- Gayther HIPPI Work Package 4 (WP4): The RAL†Fast Beam Chopper Development Programme Progress Report for the period: January 2004 – June 2005
Task (original) compare two different approaches to building and integrating in a matching line a device able to remove micro-bunches with a time duration of few nsec both approaches make use of electrostatic field across two parallel plates placed longitudinally in the beam line and driven by a fast amplifier the difference between the two approaches is in the amplifier design, in the range of duty cycle that it can cover and in the integration of the chopper in the beam line.
Tasks
WBS #Title Original begin date (Annex 1) Original end date (annex1) Estimated Status Revised end date 4.1Chopper structure A (CERN) 4.1.1Pre-prototype constructionJanuary 2004June 2004FinishedJune Pre-prototype testingJuly 2004November 2004 Combined with task December Driver construction & testingJanuary 2004December % 4.1.4Full scale prototype designJanuary 2005June 2005Finished 4.1.5Full scale prototype constructionJanuary 2005December % 4.2Chopper line (CERN) 4.2.1Dump designJanuary 2004June 2004Finished 4.2.2Dump constructionJanuary 2005June %December Chopper structure B (RAL) 4.3.1Pre-prototype design and testJanuary 2004June 2005Finished 4.3.2Prototype designJanuary 2005December %
changes CERN : Driver conceptionDriver conception Skip the phase of pre-prototypeSkip the phase of pre-prototype RAL : Beam dynamics (frequency,energy)Beam dynamics (frequency,energy) Chopping mechanism (localised dump, quad)Chopping mechanism (localised dump, quad)
Achievements
the deliverables WBS #TitleDue date in Annex 1StatusRevised delivery date 4.1.1Chopper A design reportJune 2005delayedDecember Intermediate test reportMarch 2005 Waiting for task March Dump design reportJune 2005pendingOctober Chopper B intermediate reportJune 2005Delivered July2005
Collaboration 1. Activity at RAL re-design of the chopper line optics - based on the idea of ‘amplification’ of chopper beam deflection with a downstream defocusing quadrupole. This is an example of a CERN based idea influencing the RAL design effort. 2. Activity at RAL regarding the modification to the design of RAL slow wave structure C, to enable it to fit into the bore of a quadrupole - prompted by the possibility of testing on the CERN front-end test facility. An example of a CERN based requirement influencing RAL design. 3. Activity at CERN regarding the design of the new FET based bipolar pulser. This approach came about as a result of the cross fertilisation of ideas between CERN and RAL. Example of RAL helping the CERN effort. 4. Activity during the last HIPPI meeting at Abingdon (and subsequently), regarding a meeting between J. Hares (Director & Chief Designer, Kentech Instruments Ltd, UK), CERN and RAL representatives with the purpose of discussing the possibility of alternative pulse generator designs for the CERN chopper. This activity has also (subsequently) involved discussions with Bill Foster regarding a Fermilab linac upgrade scheme. This is an example of a RAL based connection with a specialist manufacturer being utilised by a CERN based collaborator (and a FERMILAB based colleague).
Ingredients of the working package Chopper (plates and drivers) Chopper (plates and drivers) Beam dynamics Beam dynamics Beam lines Beam lines
today’s program Status of the CERN chopper (25’+5’) - M.Paoluzzi Status of the RAL ‘Fast-Slow’ beam chopper development programme (25’+5’) - M. Clarke-Gayther The FETS: Front End Test Stand (15’+5’) – D. Findlay Beam dynamics studies and design options for the RAL FETS chopper line (10’+5’) - G.Bellodi Status of the CERN Chopper line (10’+5’) - A.Lombardi Design of a rebunching cavity for the RAL FETS chopper line (10’) - C. Plostinar