WP4-CHOPPER coordinated by A. Lombardi HIPPI yearly meeting, sep28-sep30 2005 COSENERS HOUSE- Abington Hosted by CCLRC.

Slides:



Advertisements
Similar presentations
Every Child Matters: Change for Children
Advertisements

MEBT Design Considerations The beam energy in the MEBT is sufficiently low for the space charge forces to have a considerable impact on the beam dynamics.
RAL Front End Test Stand Overview, Status and Plans RAL 12 th January 2005 Alan Letchford, ISIS Injector Group.
D.S. proposal 18/12/2003 R. Garoby 1 PROTON DRIVER ACTIVITY Present work program: IPHI-SPL collaboration HIPPI Joint Research Activity [CARE] Proton driver.
H. Haseroth July 26 – August 1, 2004 NuFact04, Osaka 1 The 3 MeV H - Test Stand at CERN - The first part of the SPL - H. Haseroth on behalf of the SPL.
Queue Reform at the Midwest ISO NARUC February, 2008.
CSC, Status of HIPPI – September 2006 Maurizio Vretenar Alessandra Lombardi.
CSC, , A. Lombardi. 1 Status of HIPPI – April 2007 Maurizio Vretenar Alessandra Lombardi.
Task Force on Project X for Muon Collider Keith Gollwitzer Accelerator Division Fermilab.
UK Funding PPRP Meeting on Monday 30 th June Accepted need for urgent work this year –no discussion on this –but also no indication of the level of funds.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
UKNF OsC RAL – 21 & 22 June 2010 UKNF achievements & milestones J. Pozimski.
M. A. Clarke-GaytherRAL/ASTeC/HIPPI SPG development Beam Chopper R & D for Next Generation High Power Proton Drivers Michael. A. Clarke-Gayther RAL / ASTeC.
M. A. Clarke-Gayther RAL/FETS/HIPPI UK-NF 16 th September 2008 Beam Chopper Development for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Chopping Simulations Results M. Garcia Tudela, JB. Lallement, PA. Posocco, A. Lombardi, G.Bellodi, M. Eshraqi, E. Sargsyan, L. Hein 1 17/06/2010.
August 27, 2006R. Garoby Introduction 5 GeV version of the SPL Scenarios for accumulation and compression Conclusion SPL-BASED 5 GeV PROTON DRIVER.
Proton driver front end test stand Plans and organisation for 2004–05 David Findlay ISIS Accelerator Division STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
PHIN JRA Status PHIN collaboration CARE SC meetingParis February 2004.
HIPPI 05, Abingdon, Introduction to HIPPI05 -Few words on the life of HIPPI -A new HIPPI Management… -HIPPI 05 organization -Mandate for the.
The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
FETS Progress UKNF OsC 21 st June 2010 Dan Faircloth Faircloth.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
CARE 05, CERN, HIPPI Activities -HIPPI Structure Highlights -ESAC Report -Planning and deliverables Maurizio Vretenar, CERN.
CARE 06, Frascati, HIPPI in HIPPI Objectives Activities -ESAC Report -Planning and deliverables Maurizio Vretenar, CERN.
M. A. Clarke-GaytherRAL/ASTeC/HIPPI SPG development Beam Chopper R & D for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther RAL / ASTeC.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
CHARGES TO THE ESAC The External Scientific Advisory Committee for the HIPPI JRA inside CARE has been nominated to analyse the work done and planned in.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
CERN openlab Phase 5 Preparation (Technical) Alberto Di Meglio CERN openlab CTO office.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
M. A. Clarke-Gayther RAL/FETS/HIPPI HIPPI th October 2008 Beam Chopper Development for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther.
CSC, Status of HIPPI – September 2008 M. Vretenar, A. Lombardi.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department Rutherford Appleton Laboratory HIPPI-05, Cosener’s.
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
M. A. Clarke-GaytherRAL/FETS/HIPPICARE-07 October 30 th 2007 Beam Chopper Development for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
Project X RD&D Plan 325 MHz Linac including High Intensity Neutrino Source (HINS) Program Bob Webber AAC Meeting February 3, 2009.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
Linac4 DTL Beam Dynamics 1Jean-Baptiste Lallement – Mini-workshop on DTL design - 13/09/2011 Mini-workshop on DTL design – 13 September 2011 JB Lallement,
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
EUROnu Review: 14 th April 2011 Summary of WP3 J. Pozimski.
M. A. Clarke-GaytherRAL/FETS/HIPPICARE-07 October 30 th 2007 Beam Chopper Development for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther.
UK Neutrino Factory Conceptual Design
Status of HESR 18th March Gießen Dieter Prasuhn.
Safety Department Fire Drills.
Linac4 Beam Characteristics
Status of the CERN chopper.
Superbeams with SPL at CERN
The SPL-based Proton Driver at CERN
High Energy High Intensity Hadron Beams
Front End Test Stand (F.E.T.S.) Engineering Progress Report
Presentation transcript:

WP4-CHOPPER coordinated by A. Lombardi HIPPI yearly meeting, sep28-sep COSENERS HOUSE- Abington Hosted by CCLRC

General info  Contributors : RAL : C. Prior, M. Clarke-Gayther, G. Bellodi, C. Plostinar RAL : C. Prior, M. Clarke-Gayther, G. Bellodi, C. Plostinar CERN : M. Paoluzzi, F. Caspers, M. Morvillo, L. Bruno, K. Hanke, E. Sargsyan, J.B. Lallement, M. Hori, A. Lombardi CERN : M. Paoluzzi, F. Caspers, M. Morvillo, L. Bruno, K. Hanke, E. Sargsyan, J.B. Lallement, M. Hori, A. Lombardi  WEB site :  Yearly meeting : april 2005 joint with WP5

Publications CARE Conf HIPPI (PAC05) Michael A. Clarke- Gayther “Fast-Slow” Beam Chopping for Next Generation High Power Proton Drivers CARE/HIPPIDocument M. Paoluzzi Status of cern chopper driver and the solid state alternative CARE/HIPPI Document M. A. Clarke- Gayther HIPPI Work Package 4 (WP4): The RAL†Fast Beam Chopper Development Programme Progress Report for the period: January 2004 – June 2005

Task (original)  compare two different approaches to building and integrating in a matching line a device able to remove micro-bunches with a time duration of few nsec  both approaches make use of electrostatic field across two parallel plates placed longitudinally in the beam line and driven by a fast amplifier  the difference between the two approaches is in the amplifier design, in the range of duty cycle that it can cover and in the integration of the chopper in the beam line.

Tasks

WBS #Title Original begin date (Annex 1) Original end date (annex1) Estimated Status Revised end date 4.1Chopper structure A (CERN) 4.1.1Pre-prototype constructionJanuary 2004June 2004FinishedJune Pre-prototype testingJuly 2004November 2004 Combined with task December Driver construction & testingJanuary 2004December % 4.1.4Full scale prototype designJanuary 2005June 2005Finished 4.1.5Full scale prototype constructionJanuary 2005December % 4.2Chopper line (CERN) 4.2.1Dump designJanuary 2004June 2004Finished 4.2.2Dump constructionJanuary 2005June %December Chopper structure B (RAL) 4.3.1Pre-prototype design and testJanuary 2004June 2005Finished 4.3.2Prototype designJanuary 2005December %

changes  CERN : Driver conceptionDriver conception Skip the phase of pre-prototypeSkip the phase of pre-prototype  RAL : Beam dynamics (frequency,energy)Beam dynamics (frequency,energy) Chopping mechanism (localised dump, quad)Chopping mechanism (localised dump, quad)

Achievements

the deliverables WBS #TitleDue date in Annex 1StatusRevised delivery date 4.1.1Chopper A design reportJune 2005delayedDecember Intermediate test reportMarch 2005 Waiting for task March Dump design reportJune 2005pendingOctober Chopper B intermediate reportJune 2005Delivered July2005

Collaboration  1. Activity at RAL re-design of the chopper line optics - based on the idea of ‘amplification’ of chopper beam deflection with a downstream defocusing quadrupole. This is an example of a CERN based idea influencing the RAL design effort.  2. Activity at RAL regarding the modification to the design of RAL slow wave structure C, to enable it to fit into the bore of a quadrupole - prompted by the possibility of testing on the CERN front-end test facility. An example of a CERN based requirement influencing RAL design.  3. Activity at CERN regarding the design of the new FET based bipolar pulser. This approach came about as a result of the cross fertilisation of ideas between CERN and RAL. Example of RAL helping the CERN effort.  4. Activity during the last HIPPI meeting at Abingdon (and subsequently), regarding a meeting between J. Hares (Director & Chief Designer, Kentech Instruments Ltd, UK), CERN and RAL representatives with the purpose of discussing the possibility of alternative pulse generator designs for the CERN chopper. This activity has also (subsequently) involved discussions with Bill Foster regarding a Fermilab linac upgrade scheme. This is an example of a RAL based connection with a specialist manufacturer being utilised by a CERN based collaborator (and a FERMILAB based colleague).

Ingredients of the working package Chopper (plates and drivers) Chopper (plates and drivers) Beam dynamics Beam dynamics Beam lines Beam lines

today’s program  Status of the CERN chopper (25’+5’) - M.Paoluzzi  Status of the RAL ‘Fast-Slow’ beam chopper development programme (25’+5’) - M. Clarke-Gayther  The FETS: Front End Test Stand (15’+5’) – D. Findlay  Beam dynamics studies and design options for the RAL FETS chopper line (10’+5’) - G.Bellodi  Status of the CERN Chopper line (10’+5’) - A.Lombardi  Design of a rebunching cavity for the RAL FETS chopper line (10’) - C. Plostinar