Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification Review Proposal 0166 Review of necessary reform of NTS Offtake Arrangements Thursday 6th September 2007.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transfer & Trades Special Transmission Workstream
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod Clarifications Transmission Workstream 6 August 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
MOD0164 Bi-Directional Connection Point Overrun Charge Calculation Stuart Waudby (Centrica Storage Ltd.)
Trades and Transfers Workshop, 6 th November 2007.
Assignment of NTS Entry Capacity Review Group 221, 10th December 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gemini Release 4 UKLC Update 8 th February Gemini Release 4 – UKL13820  UK Link Committee is requested to approve the following:  Implementation.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Overrun price calculation
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
COR1072 Enduring Transfer and Trade Arrangements
PARCA Security and Termination Amounts
7th July 2011 Transmission Workgroup - Elexon
Transmission Workgroup June 7th 2012
Modification 0333A – implementation info
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Jeff Chandler - 3rd October 2013 UNC Tx Workgroup
UNC0376S – Increased Choice when applying for NTS Exit Capacity
Long Term Non Firm Capacity Update
Entry Overrun Calculation
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Assignment of NTS Entry Capacity – Previous Work Undertaken
High Level System Solution Impact Assessment
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Mod Entry Overruns Transmission Workgroup July 5 th 2012

2 Background  Modification 426 – Amendment to the NTS System Entry Overrun Charge raised to:  add 8* current MSEC firm reserve price (at that ASEP) as a bottom stop to the existing overrun calculation  to remove the potential for zero or no overrun charges to be generated  NGG gave a presentation at 7 th June Transmission Work Group and the following actions were received  Action 0426/001: Provide details of the instances of the overruns, demonstrating the volume involved and the overrun charge that would have applied with the proposed solution.  Action 0426/002: Provide an explanation of the costs and timescale of implementation.

3 Entry Overrun Data YearNo. of instances of overruns incurring a zero / non overrun charge Maximum Overrun Quantity GWh Total Overrun Charges incurred Estimated *Total of Overrun Charges applied under modification £4, £8, £10, £13,324 * Based on current MSEC Reserve Prices

4 ROM raised  Estimated costs £86k to £102k  System change to include  Code change to overrun prices calculation batch job in Gemini  Including indicative overrun price screen  Testing of NTS Entry Capacity invoice processes and impacted charges, including regression testing  Initial data setup for any new parameters  Estimated duration  Delivery, detailed design and development, testing and post implementation support will take 15 weeks to 21 weeks  Timescale  Implementation to consider existing programme of Gemini changes  Planning to be determined