PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.

Slides:



Advertisements
Similar presentations
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
Advertisements

RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
ZTF Interconnecting Scheme Stephen Kaye
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Itzhak Tserruya IEEE 2007, October 29, 2007, Hawaii Itzhak Tserruya Weizmann Institute of Science, Rehovot, Israel for the HBD group: for the HBD group:
12/12/09 MPGD 神戸大学 1 Yusuke Komatsu A B. Azmoun B, C. Woody B, K. Ozawa A University of Tokyo A,Brook Haven National Lab. B.
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
HBD CDR Gas System and Monitoring Craig Woody BNL DC Upgrades/EC Meeting March 9, 2005.
Status of TPC/HBD for PHENIX Craig Woody BNL DC Upgrades Meeting February 12, 2002.
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
6-Aug-02Itzhak Tserruya PHENIX Upgrade mini-Workshop1 Boris Khachaturov, Alexander Kozlov, Ilia Ravinovich and Itzhak Tserruya Weizmann Institute, Israel.
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
TPC/HBD R&D at BNL Craig Woody BNL Mini Workshop on PHENIX Upgrade Plans August 6, 2002.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
Collection of Photoelectrons from a CsI Photocathode in Triple GEM Detectors Craig Woody Brookhaven National Lab B.Azmoun 1, A Caccavano 1, Z.Citron 2,
HBD Gas System and Monitoring Craig Woody BNL HBD Working Group Meeting December 8, 2004.
Nov 1, 2007 IEEE NSS & MIC 2007 by C. Y. Chi 1 A Faster Digitizer System for the Hadron Blind Detector in the PHENIX Experiment Cheng-Yi Chi Nevis Lab.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Il Ring Imaging CHerenkov (RICH) detector a Jefferson Lab – Hall A.
1 HBD Update Itzhak Tserruya DC meeting, May 7, 2008 May7, 2008.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
P HOTON Y IELD DUE TO S CINTILLATION IN CF4 Bob Azmoun, Craig Woody ( BNL ) Nikolai Smirnov ( Yale University )
CDMS II Shielding To Installation To Construction From Design.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
Calorimeter Digitizer Electronics Cheng-Yi Chi Columbia University Nov 9-10, 2015sPHENIX Cost and Schedule Review1.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
RPC Front End Electronics
Overview of T1 detector T1 is composed by 2 arms
RPC Front End Electronics
RPC Electronics Overall system diagram Current status At detector
Digitally subtracted pulse between
TOF & BB FEE Safety Review
Cheng-Yi Chi Nevis Lab Physics Dept Columbia University
Presentation transcript:

PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005

C.Woody, HBD Safety Review, 9/15/052 Topics  Detector Gas system  High voltage system  Low voltage system, FEMs, cables  Grounding Installation of detector near beam pipe  Operation inside magnetic field

C.Woody, HBD Safety Review, 9/15/053 HBD Detector Uses deep UV transmitting gas (CF 4 ) with no gas window to detect Cherenkov light from low momentum electrons 50 cm of CF 4 radiator GEM detectors with CsI photocathodes to detect Cherenkov light Proximity focused Cherenkov detector 1.4 g CsI total (for entire detector) CsI layer (top GEM)

C.Woody, HBD Safety Review, 9/15/054 HBD Prototype in Lab in Physics

C.Woody, HBD Safety Review, 9/15/055 Total detector volume ~ 626 l (313 l each side) Flow rate ~ 60 l/hr ( ~ 150 l/hr purge) HBD Gas System Pure CF 4 Single pass system for Run 6 Extensive gas monitoring to maintain O 2 and H 2 O levels to a few ppm R.Pisani

C.Woody, HBD Safety Review, 9/15/056 Gas Monitoring McPherson 234/302 VUV spectrometer - uses pure argon as reference gas (no vacuum) - completely enclosed 30 W D 2 lamp H 2 0 O 2 VUV transmission Gas monitoring near detector (under stairs by labyrinth) D.Lynch

C.Woody, HBD Safety Review, 9/15/057 High Voltage System CAEN SY2527 A1732 Commercial CAEN system (SY A1732 modules) located on top bridge above Central Magnet Maximum HV for detector < 4 KV Maximum HV for A1732 is 6 KV, but can be limited to 4 KV 48 HV cables from bridge to 24 voltage divider boxes located near detector (~ 10 m) 168 short (~ 1m) HV cables from divider boxes to detector Will use lab standard RG-59 (A-30304) All connectors SHV (maximum rating 5 KVDC)

C.Woody, HBD Safety Review, 9/15/058 LV Distribution S.Boose Entire System V V × 2 for safety Per cable (x 24) V V Individual boards also fused Fuses

C.Woody, HBD Safety Review, 9/15/059 LV Power Cables S.Boose

C.Woody, HBD Safety Review, 9/15/0510 Signal Cables Total length 10 m Individually shielded pairs Grouped in bundles of 16 pairs C-Y. Chi

C.Woody, HBD Safety Review, 9/15/0511 Grounding System HV Supply LV Supply FEM Preamp Board GEM Detector HV Distribution Box +6.5 V -7.0 V MVD Rack return

C.Woody, HBD Safety Review, 9/15/0512 Operation in Magnetic Field No magnetic components inside detector Will operate with inner and outer coils in opposite polarity producing very low magnetic field in the region of the detector

C.Woody, HBD Safety Review, 9/15/0513 Backup Slides

C.Woody, HBD Safety Review, 9/15/0514 HBD Gas System Current Status Run6 simplified system Single pass Limited data logging PC software in 2006 Recirculation in 2006 R.Pisani

C.Woody, HBD Safety Review, 9/15/0515 HBD System Parameters R.Pisani

C.Woody, HBD Safety Review, 9/15/0516 HBD Full Gas System Schematic R.Pisani

C.Woody, HBD Safety Review, 9/15/0517 FEM Organization Crate Base system 4 crates in a rack 6UX 160mm IEEE Standard Crate mechanics – VME 64X etc. Custom Backplane All clock cables are 2mm Hard Metric cables Signal cable/test pulse are 2mm Hard Metric cables There are also Ethernet, Optical and power cables C-Y. Chi

C.Woody, HBD Safety Review, 9/15/0518 Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse C-Y. Chi

C.Woody, HBD Safety Review, 9/15/ V BUSBAR - 4V Analog Ground BUSBAR +5.5V Digital Ground BUSBAR AMP 25A Power Connector BackPlane C-Y. Chi

C.Woody, HBD Safety Review, 9/15/0520 FUSE ADC Board Clock Master Optical Transmitter Clock Fanout C-Y. Chi

C.Woody, HBD Safety Review, 9/15/0521 S-S+G S- Signal arrangement Use 2MM Hard Metric cable to move signals between preamp/FEM 2mm HM connector has 5 pins per row and 2mm spacing between pins and rows There are two types of cable configuration: *100 ohms parallel shielded cable 50 ohms coaxial cable Our choice is This gives us signal density 2mm x 10mm for every 2 signals. Same type of cables will be used for L1 trigger data. C-Y. Chi

C.Woody, HBD Safety Review, 9/15/0522 Signal Cable Meritec Custom 2mm Cable Assembly, 1X5 to 1X5 with 8 stack and 16 lines , using polyester expando sleeving, 394” in length – C-Y. Chi

C.Woody, HBD Safety Review, 9/15/0523 C-Y. Chi

C.Woody, HBD Safety Review, 9/15/0524 B.Yu Prototype - 68 channels Final board - 96 channels Power V, -7.0 V (  ± 5V after regulators) Preamps : 165 mW each (  16 W/board) Readout Boards Voltage regulators Fuses