Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.

Slides:



Advertisements
Similar presentations
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Advertisements

Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Jan. 6, 2006 Chamber & Bellows IDR 1 LCLS Undulator Bellows Module Soon-Hong Lee Internal Design Review.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
October 30, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Geoff Pile, Dean R. Walters, Soon-Hong Lee,
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Undulator Vacuum System/Mechanical By Dean R Walters.
Dean R. Walters April 20, 2006 Vacuum Chamber Review 1 LCLS Undulator Vacuum Chamber Dean R. Walters.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Dean R Walters November 15, 2004 Integration of the Vacuum and Diagnostics with the Undulator By Dean R Walters APS.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
Geoff Pile LCLS Und. System FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Update FAC Review October 29 th (30 th.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
1 ACTIONS: Ashley French TASK STATUSCOMMENTS 1. Contact Berthet-SergeFuture 12/11/10 2. Contact Serge Mothot & Said Atieh (CERN Workshop) Future 12/11/10.
Bob Lill Undulator Systems – BPM January 31, 2006 Undulator Cavity BPM Design and Status.
1 st All Hands Meeting Milton 20 Feb st ANL LCLS All Hands Meeting 20 February, 2006.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 RFBPM Windows Joining Effort Undulator System W. Toter, D. Bromberek, F. Depaola,
Oct. 12, 2006 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
ELENA installation progress F. Butin / ELENA collaboration.
Status of HESR 18th March Gießen Dieter Prasuhn.
Installation of an Instrument on a CERN machine
Diffuser status October 2017
Beam Finder Wire Assembly Undulator System
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
LTU/Undulator Installation Status
LCLS Undulator System Detailed Report
Undulator Scope, Management, and Organization
e-Beams Systems Update
Undulator System Components Status Dean Walters
LCLS Undulator System Status and Schedule
LCLS Undulator System Production Management
LCLS Undulator System Status
E-Beams Systems Manager
LTU/Undulator Installation Status
LCLS Vacuum System Plans (July 07)
LCLS Undulator System Status and Schedule
Undulator System Overview
Undulator Integration Test Status
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Electron Beam Systems ETC and Methodology
LCLS Undulator System Detailed Report
LCLS Undulator Vacuum Chamber
Undulator Systems Integration
LCLS e- Beams Systems Manager
Presentation transcript:

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 2 Overview Diagnostics Undulator Line Diagnostics RF Beam Position Monitors Beam Finder Wire Beam Loss Monitors Vacuum System Undulator Vacuum Chamber Bellows Module Single Undulator Test

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 3 Overview Fabrication plan for vacuum chamber: - 33 production vacuum chambers & 7 spares - 1 mock-up chamber for single undulator test - 1 vacuum chamber for prototype Beam Position MonitorBeam Finger WireFuture Diagnostics Suite Quadrupoles Undulator 3, ,038 mm Total undulator length (x11): m

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 4 Overview Short Break Long Break

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 5 Diagnostics Undulator Line Diagnostics RF Beam Position Monitors Beam Finder Wire Beam Loss Monitors Vacuum System Undulator Vacuum Chamber Bellows Module Single Undulator Test

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 6 Diagnostics Undulator Line Diagnostics Optical Transition Radiation Scanning Wire Monitor Vacuum Chamber ULD Team Bingxing Yang Jim Bailey Tom Buffington Pat Dombrowski This was scheduled to be installed in the April/May shutdown on the BTX line.

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 7 RF Beam Position Monitor Cavity Down Converter Electronics Support Network Analyzer Down Converter Electronics Cavity Lab Test of a non-vacuum Cavity

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 8 RF Beam Position Monitor The team is preparing two major test: 1.The ITS Single unit test -Scheduled for Feb/March The LEUTL tunnel three unit test –Scheduled for June 2006 RF BPM Team Bob Lill Leonard Morrison Randy Zabel Michele Givens Zek Salazar

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 9 Beam Finder Wire Beam Finder Wire Team Jim Bailey Jim Morgan Scott Doran Test of prototype components to start in March 2006

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 10 Beam Loss Monitors Beam Loss Monitors Team Bill Berg Jim Morgan Scott Doran Additional help from Northwestern

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 11 Vacuum System Diagnostics Undulator Line Diagnostics RF Beam Position Monitors Beam Finder Wire Beam Loss Monitors Vacuum System Undulator Vacuum Chamber Bellows Module Single Undulator Test

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 12 LCLS Vacuum Chamber Ass’y Vacuum Chamber Assembly Support Assembly X-Adjustor Z-Adjustor Vacuum Chamber Team Soon-Hong Lee Jim Bailey Tom Buffington Scott Doran

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 13 Manufacturing Processes SST Plate (144” x 6” x 1”) Laser Welding Milling/Grinding Forming Al-Coating Milling/Polishing SST Sheet (144” x 2” x 0.118”) Polishing/Grinding Al-Coating

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 14 Vacuum Chamber Prototypes Type 316 LN Laser Weld Specimen 1.Quotations for specialty stainless steel ( 316 LN) are in progress 2.Adjuster-Support is on order and will arrive early March Full chamber prototype to be complete by June 2006

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 15 Bellows Module Team Soon-Hong Lee Jim Morgan Scott Doran Bellows Module 1. Prototype Bellows fabricated by April Bellows testing complete by June 2006

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 16 Single Undulator Test Diagnostics RF Beam Position Monitors (mock-up) RF BPM Support Beam Finder Wire (mock-up) Beam Loss Monitors (mock-up) Vacuum System Undulator Vacuum Chamber Chamber Support Vacuum Pump Chamber for the BFW-BLM & Support Diagnostics-Vacuum SUT Team Soon-Hong Lee Jim Bailey Jim Morgan Leonard Morrison Scott Doran 1.Chamber and support due 1 st week March RF BPM due end of Feb Ion pump due mid Feb Materials for BFW, BFW chamber, & BLM are on hand