Performance of PHENIX High Momentum Muon Trigger.

Slides:



Advertisements
Similar presentations
Silicon Verterx Tracker Upgrade of PHENIX Experiment at RHIC Y. Akiba (RIKEN) CIPANP2003 New York, New York May 2003.
Advertisements

Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.
Post Run13 MuTR/MuTrig Maintenance 1. Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2.
J/  measurement with the PHENIX muon arms in d-Au interactions at √ s NN = 200 GeV David Silvermyr, LANL APS April Meeting Philadelphia, April 5-8, 2003.
Commissioning the PHENIX RPC Forward Trigger Upgrade Michael Daugherity Abilene Christian University for the PHENIX Collaboration.
1 Run 9 PHENIX Goals and Performance John Haggerty Brookhaven National Laboratory June 4, 2009.
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
Heavy flavor production in sqrt(s NN )=200 GeV d+Au Collisions at PHENIX DNP 2013 Matthew Wysocki, Oak Ridge National Lab Newport News, Virginia, Oct 25,
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
W trigger upgrade simulation Kazuya Aoki Kyoto Univ. Muon Physics and Forward Upgrades Workshop Santa Fe, June 2004.
Status of W analysis in PHENIX Central Arm Kensuke Okada (RBRC) For the PHENIX collaboration RHIC Spin Collaboration meeting November 21, /21/20091K.Okada.
PHENIX RPC in China Li Ye Shouyang Hu Xiaomei LI China Institute of Atomic Energy
The Progress of PHENIX RPC Production in China Shouyang HU Xiaomei LI Shouyang HU Xiaomei LI Science and Technology on Nuclear Data Laboratory China Institute.
PHENIX Detector Upgrade for Triggering Fast Muons from W-Boson Decays Using RPC Technology Xiaochun He, Georgia State University For PHENIX Collaboration.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
Performance of PHENIX High Momentum Muon Trigger 1.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
South SG1 Trigger High Rate Sanghwa Park, Katsuro Nakamura, Yoshimitsu Imazu, and Itaru Nakagawa 1.
South SG1 Trigger High Rate Sanghwa Park, Katsuro Nakamura, Yoshimitsu Imazu, and Itaru Nakagawa 1.
PHENIX Detector Upgrades M. Grosse Perdekamp University of Illinois RHIC Spin Collaboration Meeting, LBL, November 20 th 2009 o Overview o VTX, FVTX, Muon-Trigger,
Spin J. Lajoie1 The PHENIX Muon Trigger Upgrade Outline: A (Brief) Spin Physics Motivation Antiquark Spin Contribution with W +/- bosons The PHENIX.
The W program at PHENIX R. Seidl (University of Illinois and RBRC) for the PHENIX Collaboration Workshop on Parity Violating Spin Asymmetries BNL, April.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
9/25/08J. Lajoie - Muon Trigger Upgrade Review1 Muon Trigger Upgrade LL1 Electronics Iowa State University John Lajoie Cesar Luiz daSilva Todd Kempel Andy.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
February 13, 2008RPC2007-Mumbai1 RPC Production for Fast Muon Trigger System for Byungsik Hong Korea University for the PHENIX Collaboration.
PHENIX Measurement of Parity-Violating Single Spin Asymmetry in W Production in p+p Collisions at 500 GeV Stephen Pate (for the PHENIX Collaboration) New.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
Performance of PHENIX High Momentum Muon Trigger.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
First measurement and future prospects for measurements of single spin asymmetries in W production with the PHENIX experiment at RHIC Young Jin Kim for.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
R&D for Muon Trigger Upgrade Naohito Saito (Kyoto/RIKEN/RBRC)
10/27/2005J. Lajoie - PANIC '051 The PHENIX Forward Upgrade Topics: A (Brief) Spin Physics Motivation Antiquark Spin Contribution with W +/- bosons The.
PHENIX results on collectivity tests in high-multiplicity p+p and p+Au collisions at √s NN =200 GeV RIKEN/RBRC Itaru Nakagawa Quark Matter 2015, Kobe,
Performance and Early Results from the Muon Tracking System of Rusty Towell of Abilene Christian University for the PHENIX collaboration First Joint Meeting.
PHENIX FUTURE PLANS & UPGRADES Stefan Bathe for PHENIX, Users’ Meeting 2009.
MuTRG Channel map summary June 30, 2008 Tsutomu Mibe KEK 1.
PHENIX W-Boson Trigger Itaru Nakagawa RIKEN/RBRC On behalf of RPC/MuTrig-FEE Collaboration.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
Run11 MuTrig Performance RIKEN/RBRC Itaru Nakagawa 1.
Reduction of Background in Observation of W Decay Using the Forward Vertex (FVTX) detector at PHENIX Abraham Meles New Mexico State University APS April.
Overview of the sea quark polarization measurements of PHENIX at RHIC DIS April 12, Rusty Towell Abilene Christian University on behalf of the PHENIX.
Muon Arm Physics Program Past, Present + Future Patrick L. McGaughey Los Alamos National Laboratory Santa Fe June 17, 2003.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
October 19, 2007Heavy Ion Meeting1 RPC Upgrade for PHENIX Byungsik Hong Korea University.
MuTrg/Mutr Optimization Yoshi-mitsu Imazu. ● Mutr Lv1 timing scan Adjustment of Lv1 timing Online/Offline shape cut values ● Mutrg threshold scan → Better.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 1 96 wire planes –(8 superlayers) –50% are 3 o stereo –Uniform drift (0.88 cm cell) –30,240.
RPCs for the W measurement in PHENIX Chong Kim Korea University Japan-Korea PHENIX collaboration workshop, Nov. 27, 2012 for the PHENIX collaboration.
RPC production and performance Chong Kim Korea university RHIC spin workshop, Seoul National Univ.
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
OPERETTE TEST BEAM EXPERIMENT :
RPC Production for Fast Muon Trigger System for
Sea Quark Polarization Measurement via W → μ at PHENIX
The LHCb Front-end Electronics System Status and Future Development
Run 12 Sea Quark Polarization:
Presentation transcript:

Performance of PHENIX High Momentum Muon Trigger

Muon Tracker Octant number

4 MuTR FEE Upgrade Readout Analog Signal to Get the Position of Particle Passage (OFFLINE Analysis) Get Digital Signal for Trigger Decision (ONLINE) Readout Analog Signal to Get the Position of Particle Passage (OFFLINE Analysis) To trigger Logic ADC 0.95Q 0.05Q Q 1.Charge Sharing with multilple strips provides ~200um resolution out of 5mm strips 2.Fast readout electronics process signal fast enough before trigger decision is made Bottom Line ~10  s

5 High Momentum Muon Trigger System MuTRG ADTX MuTRG MRG Level 1 Trigger Board MuTr FEE Resistive Plate Counter (RPC) (Φ segmented) B 2 planes 5% 95% Trigger Interaction Region Rack Room Optical 1.2Gbps Amp/Discri. Transmit Data Merge MuTRG RPC FEE Trigger events with straight track (e.g.  strip <= 1) RPC / MuTRG data are also recorded on disk. SG1 DCM

Threshold Scan Run #ThresholdS.SG1N.SG mV11kHz750Hz mV76kHz18kHz mV20kHz8kHz mV15kHz32Hz mV200Hz1Hz mV20kHz1Hz mV2kHz1Hz mV1.7kHz0.5Hz mV14Hz0.4Hz mV3.8kHz1.0Hz Good correlation between threshold and N.SG1. 1Hz is reasonable true cosmic rate. Poor correlation between threshold and S.SG1. Not rates are not reproducible. 6

North Threshold Scan

All Octants (Thr=40mV) Measurement and study by SeYoung and Dahee SG 1 South Trigger Rate Expected trigger rate for cosmic ~1Hz]

Masking Octant-1 (Thr=40mV) Study by Dahee and SeYoung 20min

Oct-1 Effect

Observation So Far 1. Octant-1 which has intrinsic eigenvalue of – This high rate quenches completely by masking octant-1. Masking at LL1 or MRG doesn't matter. 2.Rate excursion up to >10kHz with minutes of lifetime originated Octant-3. Excursion repeats during the run.

Threshold Response of SG1.S Rate NORTH SG1 SOUTH SG1 w/o Oct-3

MRG LL1 GL1 Oct-3 Excursion yes ADTX Oct-1 HighRate yes MRG LL1 GL1 no ADTX no ✖ mask MRG LL1 GL1 no ADTX ✖ mask Logic Test yes no yes no MRG LL1 GL1 no ADTX ✖ High Threshold yes no 10-13min no yes ~60min no

Octant-3 High Rate Time Structure

PHYSICS INTRODUCTION AND MUON TRIGGER SYSTEM

sqrt(s)=500 RHIC  Parity Violation Asymmetry Clean flavor separation w/o fragmentation uncertainty

17 High Momentum Muon Trigger Run GeV Projection New Trigger Upgrade MuID Trigger Rate 9 MHz 90 kHz σ tot =60mb L=1.5x10 32 cm -2 s -1 BBC  MuID Rejection Power RP~100 Trigger Upgrade RP ~ 45 2 kHz PHENIX Band Width for Muon Required Rejection Power RP tot ~ High Rejection Power 2.High Efficiency 1.High Rejection Power 2.High Efficiency W

18 New MuTRIG-FEE in North Arm  Before Install 2008 Install 

Diagnosis 19 Threshold scan. ✔ Angular distribution of cosmic ✔ Antimask all octants ✔ Fiber swap btwn MRG&LL1