Background  EM16 SGS+TEC met with FD 1 year ago  Both sides agreed that there was a “performance gap:  SGS prepared a TN with 2 main options to bridge.

Slides:



Advertisements
Similar presentations
1 Location of Partners and customers Who are our customers? MSSL Centre for Process engineering European Space Agency JOANNEUM RESEARCH Swedish Research.
Advertisements

GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Mission Independent Group Feb. 4 th 2009 Planning Concept Meeting.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations The planning concept - current status Detlef Koschny Space Science Department ESA/ESTEC.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Plans for rover operations training at ROCC M. Cinato.
IBM Software Group ® Recommending Materialized Views and Indexes with the IBM DB2 Design Advisor (Automating Physical Database Design) Jarek Gryz.
Rational Unified Process
Development Processes UML just is a modeling technique, yet for using it we need to know: »what do we model in an analysis model? »what do we model in.
1 CS 430 / INFO 430 Information Retrieval Lecture 24 Usability 2.
Trade Study Training Need and Goals Need Consistent methodologies and practices performing trade studies Pros/cons, advantages/disadvantages, customer/management.
Iterative development and The Unified process
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
Business Intelligence Dr. Mahdi Esmaeili 1. Technical Infrastructure Evaluation Hardware Network Middleware Database Management Systems Tools and Standards.
Configuration Management
MultiJob PanDA Pilot Oleynik Danila 28/05/2015. Overview Initial PanDA pilot concept & HPC Motivation PanDA Pilot workflow at nutshell MultiJob Pilot.
Development Processes and Organizations
EMC Quiet Planning During Science Operations Andrew Walsh & Chris Watson Solar Orbiter SOC, ESAC, Madrid EMC Working Group #12, Imperial College,
Portable and Predictable Performance on Heterogeneous Embedded Manycores (ARTEMIS ) ARTEMIS Project Review 28 nd October 2014 Multimedia Demonstrator.
CEOS-CGMS Working Group on Climate John Bates, NOAA SIT-30 Agenda Item #11 Climate Monitoring, Research, and Services 30 th CEOS SIT Meeting CNES Headquarters,
Design of a Science Operations Centre for the ExoMars 2016 Trace Gas Orbiter Mission A. Cardesin Moinelo, D. Frew, L. Metcalfe, P. Martin, N. Manaud, A.
SOPS: The Science Operations Planning System for the first ESA Lunar Mission SMART-1.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
Visual Linker Final presentation.
At A Glance VOLT is a freeware, platform independent tool set that coordinates cross-mission observation planning and scheduling among one or more space.
BMAN Integrative Team Project Week 2 Professor Linda A Macaulay.
FGM report 9 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Paul French, Chris Carr, Tim Oddy, André Balogh I mperial College London March.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Project Life Cycles.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
© 2012 xtUML.org Bill Chown – Mentor Graphics Model Driven Engineering.
Objects in the Mirror are closer than they appear Where We’ve Been What We’ve Accomplished Where We Need to Go Why We Need to Go There THE ENTERPRISE ARCHITECTURE.
Fuel Cell Systems Engineering, F06 Fuel Cell Systems Engineering Systems Engineering Process.
Request for Proposal (RFP)
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
On-board Timeline Validation and Repair: A Feasibility Study Maria Fox, Derek Long University of Strathclyde, Glasgow, UK Les Baldwin, Graham Wilson, Mark.
Mercury Program Margin Management Tool (MMT) 10-January-2014.
1/15/02Bowman/Harch1 CONTOUR Science Ops Update Ann Harch Cornell University (607) Alice Bowman Applied Physics.
PLANNING FOR FDT-WORK IN COMING MONTHS 3-mar-2014 Emmanuel VDS and Peter R. 1.
Paul Alexander 2 nd SKADS Workshop October 2007 SKA and SKADS Costing The Future Paul Alexander Andrew Faulkner, Rosie Bolton.
1/106 December 2001Rosetta SOWG Status of the Rosetta Project TestBed (PTB) P. van der Plas Modelling and Simulation Section ESA/ESTEC ESA/Estec 6 December.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
SSC Support for Sim #3 Archived MOC Data Products, and distributed via web. –Level-0 telemetry files organized by year and month –SPICE orbit and attitude.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
ESA UNCLASSIFIED – For Official Use MAPPS Software Review Board.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
Development Project Management Jim Kowalkowski. Outline Planning and managing software development – Definitions – Organizing schedule and work (overall.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
1 MAPPS Software Review Board MAPPS SRB – part II ESAC, Madrid, Spain 3 rd June 2016 ESA-ESTEC - “MAPPS Software Review Board” – MAPPS SRB - Part II, ESAC,
Mission Planning Concepts
The road to the first E2E tests
Rosetta Science Working Team Meeting #26 Working Group #1
RSOC Overview at SWT #26, 11/12 June 2009
Instrument Teams to SOC Test Specifications
Richard Carr, ESAC, January 2015
Pre-landing Orbiter Observations
Defining the Preferred case
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
OpSim4 vs OpSim3 Francisco Delgado
Chapter 13: Setting a Direction for Information Resources
GEOSS Data Sharing Principles
Software Configuration Management
The RSP Archive System RSP Archive Concept Review 28 September 2017
UK Link Technology Refresh
Request for Proposal (RFP)
SDO Flight Dynamics Subsystem
Quality Assurance in an Agile Development Team Michelle Wu 2018 PNSQC
Multidisciplinary Optimization
Presentation transcript:

Background  EM16 SGS+TEC met with FD 1 year ago  Both sides agreed that there was a “performance gap:  SGS prepared a TN with 2 main options to bridge this gap (EM16 near-term solutions)  TN also included set of requirements for future missions (if time & money available!)  Prepared together with TEC ExoMars Project 1

EXOMARS USAGE OF FD SERVICES Presentation given to FD on 18/06/2014 ExoMars Project 2

Science Operations Concept  Core elements (re-use from Mars Express).  MAPPS will be used for ExoMars 2016  Additional ExoMars 2016 extensions, mainly in support of LTP Concept Elements:  Long Term Planning (to meet SWT science goals & priorities)  contain representative observations and operational valid  Plan Construction and Validation (MTP)  Constraint Checks, Models, Simulation - all have a dependency on the pointing  Operations Request Generation (POR and PTR) 3 ExoMars 2016 SGS 18 th June 2014 FD/TEC/SOC meeting

Medium Term Planning Timeline  -12 weeks: Kick-off of MTP activities  Science preparation telecon, delivery of baseline observations  -12 to -8 weeks:  Refine MTP observations  Generation of validated candidate plans  -8 weeks: MTP approved by teams  SOC generates PTR, MTP POR and deliver to MOC 4 SOC + PI teams will use MAPPS to construct pointing (+ check all other constraints) SOC + PI teams will use MAPPS to construct pointing (+ check all other constraints) ExoMars 2016 SGS 18 th June 2014 FD/TEC/SOC meeting

Typical MTP Orbit NADSOSO SPSP NADIRSOSO NADWOL n/day 5  NOMAD/ACS Solar Occultation (SO)  2 solar occultation per orbit, every orbit  NADIR in remainder of orbit (day-side rider, night-side driver)  CaSSIS Images:  1 stereo pair (SP) per orbit  1 non-stereo image per orbit  FREND: Rides along with other instrument pointings  Wheel Off-loading: SOC will insert WOL slots based on rule from FD ExoMars 2016 SGS 18 th June 2014 FD/TEC/SOC meeting

MTP PTR construction Each observation in the MTP links to a PTR segment. SOC relies on MAPPS to construct the full MTP PTR:  FIT pointing blocks around well determined pointing blocks (SO/SP/WOL)  slew estimation (fitting) to set start/end times for NADIR blocks.  Binary search to converge on slew time.  MERGE pointing blocks  Compatible observations (driver/rider)  Consecutive observations with the same pointing (avoid intermediate slew) 6 ExoMars 2016 SGS 18 th June 2014 FD/TEC/SOC meeting

MTP PTR Size  ~ 7 baseline pointing blocks in 1 orbit + WOL  > 340 orbits/MTP  ~ 2500 pointings/MTP, and as a result:  ~ 2500 slew fitting/MTP  multiple checks to search for each slew duration During the MTP a number of versions of the science plan will be generated before converging on the approved PTR  PTR construction needs to be interactive (responsive) to support science planning decisions  PTR checks will be performed by parallel users 7 ExoMars 2016 SGS 18 th June 2014 FD/TEC/SOC meeting

EXOMARS 16 PROPOSED SOLUTION Contained in TN from October 2014 ExoMars Project 8

Analysed Options Several integration options considered: 1.MEX/VEX: FD provide s/w to DTEC 2.Rosetta: follow option 1 for planning iterations, use FD service for validation 3.Distributed usage of FD service (PI teams) 4.Pre-computation: FD services to pre-compute all possible pointings 5.Reconfigure SOC systems. Modify the MAPPS architecture 6.Reconfigure FD systems: SGS and TEC provide requirements Options in green selected for further analysis ExoMars Project 9

EM 16 Science Operations Sizing Expected # of pointings > 3000 / MTP so also > 3000 intermediate slews 15 steps to fit each slew = slew checks 2 MTP versions (1 selected for refinement) 2 refinement cycles 2 possible HGA configurations 20% delta for pointing definitions ~ 450,000 checks/MTP ExoMars Project 10

Option A: MAPPS + FD Services 1.Configuration of MAPPS/AGM for attitude computation, slew estimation, constraint checks and HGA outage checks. 2.For the planning period synchronise MAPPS + FD service inputs (e.g. same orbit file). 3.Conduct the MTP iterations with the PI teams using MAPPS. 4.Validate the final generated PTR using the FD services. Drawback with this approach is the potential for misalignment with the FD checks  Will need regular MAPPS/AGM validations against FD services (e.g. at the start of each LTP period). 11

Option B: Precomputation 1.Use MAPPS to generate PTR snippets for all possible pointing blocks. 2.Call FD service filter out invalid pointing. (overnight) 3.Call FD service generate reference attitude data set (overnight) for MAPPS to query during planning. 4.Slews and HGA checks performed by MAPPS 5.If any pointing modified, recompute with FD service and update attitude data set (overnight) 6.Validate the final generated PTR using the FD services.  New MAPPS functionality  Overnight computation or non-interactive steps ExoMars Project 12

Conclusion  Option A for testing & mission analysis  Uses available MAPPS/AGM that includes the + HGA computations within MAPPS.  configuration effort and additional validation of the AGM results versus the FD web-tool.  Initially considered as back-up for Operations – now most likely configuration.  Option B considered feasible for ExoMars  Required level of performance for science planning (query precomputed attitude)  Only feasible given relative simplicity of the mission.  Could be available in remaining development time. 13