1. Create an IMRT plan on the Cadplan/Helios system. When selecting the LMC options, select the “Extract Portal Image with” option and use 0 MU. This creates.

Slides:



Advertisements
Similar presentations
Welcome to the Online Employment Applicant Tutorial Click here for next screen.
Advertisements

Managing Your Site – Lesson 61 Managing Your Site Lesson 6.
Importing GPS Data Lecture 13. EasyGPS  Free software for downloading waypoints  EasyGPS ( EasyGPS  Free software for downloading.
Webcutter Estimated time required: 40 min
Chapter 07: Lecture Notes (CSIT 104) 1111 Exploring Microsoft Office Excel 2007 Chapter 7 Data Consolidation, Links, and Formula Auditing.
Unauthorized Reproduction Prohibited SkyPoint Alarm Integration Add-On Using OnGuard Alarms to create events in SkyPoint Also called ‘SkyPoint V0’ CR4400.
Annotation & Nomenclature By Corey Fortezzo for PG&G GIS Workshop, 2010.
NextGen Trustee Receipting
1 Agenda Views Pages Web Parts Navigation Office Wrap-Up.
Access Ch 5 Review.
Research Posters in PowerPoint. 2 Download Notes
1 ISA Server 2004 Installation & Configuration Overview By Nicholas Quinn.
1 Identify the location of a particular gene, trait, QTL or marker - and the grass species they have been mapped to - on genetic, QTL, physical, sequence,
Microsoft Office 2007 Access 2007 Chapter 9 Administering a Database System.
September 5, 2015 Office Setup. Lesson Overview: Office Setup  In this lesson we will cover:  Adding new offices to COM  Individual office setup 
Advanced SAGE Formative Adding Your Own Resources Using Common Assessments Creating Educator Groups.
NWOCA USER CONFERENCE NOVEMBER 2, 2012 POWERSCHOOL FEES.
NextGen Trustee Department Disbursements This class will cover the various methods of handling department disbursements. Whether entering them manually.
Basic Administration.  Familiarize support staff with basic DSX administrative tasks  Provide expedited service to customers  Minimize the involvement.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Systems Module Slide 2 – Overview and Navigation
1. Insert the Resource CD into your CD-ROM drive, click Start and choose Run. In the field that appears, enter F:\XXX\Setup.exe (if “F” is the letter of.
TxEIS Security A role-based solution October 2010.
Smart Forms 2010 CAMIS Conference July 29,  Session Overview  Smart Form Process Flow  Understanding the Initial Procedures  Scan Process in.
INTRODUCTORY GUIDE TO SURPLUS LINE INFORMATION PORTAL 2.0 (SLIP) CALIFORNIA’S ELECTRONIC FILING SYSTEM THE SURPLUS LINE ASSOCIATION OF CALIFORNIA SLIP.
GM 5.0 ch 9 Edited 06/14/05 1 Getting GPS Data into GeoMedia 5.0 At this point, you have successfully collected, corrected, and exported your data using.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Screen ViewModule Title: Notes: Branching Instructions: Audio Script: Page: Messaging Configure the Address Book 1 Configure the Personal Address Book.
Access Manual 2 By Dhawala Kovuri Elham S.Khorasani Ismail Guneydas.
ENCOMPASS Voucher Build Process
Version How to Use Packet Tracer MarinaMD.
Using Microsoft Visual Studio 2005 Original by Suma Rao Revised by John G. McMahon ( 9/6/2008 )
Microsoft Access 2010 Chapter 10 Administering a Database System.
The Next Generation. Parent Access Grade History and Attendance.
Nextgen Transactions Presented by Bridget Clayton Local Government Corporation Resource 2015.
FIX Eye FIX Eye Getting started: The guide EPAM Systems B2BITS.
Copyright 2007, Paradigm Publishing Inc. ACCESS 2007 Chapter 3 BACKNEXTEND 3-1 LINKS TO OBJECTIVES Modify a Table – Add, Delete, Move Fields Modify a Table.
GM 5.2 ch 9 Edited 08/25/04 1 Getting GPS Data into GeoMedia 5.2 At this point, you have successfully collected, corrected, and exported your data using.
Copyright © 2008 Pearson Prentice Hall. All rights reserved Copyright © 2008 Prentice-Hall. All rights reserved. Committed to Shaping the Next.
A Short Course on How to Manage SLOs with TracDat.
Instructions for Uploading Points and Photos for Linking Uploading GPS points requires the following: At each site or transect note stop, “mark” a GPS.
IFS Document Management
Dreamweaver MX. 2 Tools for Code Editing (p. 366) n An HTML editor like Dreamweaver writes most of the code you need, but at times you will need to perform.
CPS-Student Response System Dottie Betts ITRT June 2009.
Nextgen Transactions Presented by Bridget Clayton Local Government Corporation Resource 2014.
Transportation Agenda 77. Transportation About Columns Each file in a library and item in a list has properties For example, a Word document can have.
Associate ® Administration An Associate administrator has the ability to change the parameters for both the author and for the typist. There can be enterprise.
Flair development for the MC TPS Wioletta Kozłowska CERN / Medical University of Vienna.
Active-HDL Server Farm Course 11. All materials updated on: September 30, 2004 Outline 1.Introduction 2.Advantages 3.Requirements 4.Installation 5.Architecture.
© 2014 IBM Corporation e-config RPO MES Training Bill Luken September 29 th, 2014 Global Client Value.
Interstage BPM v11.2 1Copyright © 2010 FUJITSU LIMITED ADMINISTRATION.
Using ArcGIS Layout View
NOODLETOOLS SIGN-IN Student ID #
Contract Compliance: Reporting
Module 5 Proposal Creation.
Your Name Proposal Creation Module 5 Your Name
WORKSHOP 19 HATCHBACK III
3.14 Microscan QX-870 Scanner Configuration
Spreadsheet Engineering
Cayuse 424 Proposal Creation.
Exploring Microsoft® Access® 2016 Series Editor Mary Anne Poatsy
Outlook /Calendaring Migration
MODULE 7 Microsoft Access 2010
Lesson Seven: Maintaining Patient Lists
Lesson Seven: Maintaining Patient Lists
Configuration Of A Pull Network.
Using the QGIS Layout Manager to create
Gurpreet Singh CSE/IT.
Guidelines for Microsoft® Office 2013
Presentation transcript:

1. Create an IMRT plan on the Cadplan/Helios system. When selecting the LMC options, select the “Extract Portal Image with” option and use 0 MU. This creates the CIAO (MUs may be assigned with the CIAO, but they will be deducted from the treatment beam).

2. Upon Completion of the calculation, click on the IMRT tab to see the two DVA files created for each field. The one with a “p” in the file name is the CIAO. (See Appendix 1 for more details)

3. Export the MLC file (File-Export-MLC File-Varian…)

4. Apply a name mask Consider using a very short description to make the viewing of the files easier. Cadplan will add more info to this name including field number and “p” or “m”) (See Appendix 2 - The INI file must be set for export to the proper location)

5. Export the plan to Somavision 5A. Select the Patient ID to Soma Vision export

6. Open the patient and 3D Image set “CT_*”

7. In Somavision - Plan Setup, import the plan (File-Import-from CadPlan)

8. Select the appropriate plan

9. You will get the the following warning about the dMLC being removed, ignore it for all fields.

10. The IMRT plan minus the DVA files are now imported and able to be viewed. Note the field sizes will be associated with the treatment ports, they will need to be changed to the CIAO field size if different. NOTE: This import will invalidate dose matrix on SomaVision, if you like to preserve it, you need to export plan from CadPlan twice (with different plan number) and import two plans in SomaVision, one for dose distribution review, the other one for CIAO definition.

11. Select a field in the Navigation window then import an MLC by choosing (File- Import-Import MLC Plan)

12. Select appropriate MLC Configuration

13. The MLC files will be on the Vision drive in the MLC directory (As mapped in the *.ini file)

14. After you have pointed to the correct directory, choose All Files (*.*) in the MLC File Window the choose the Varian IEC Import Scale, then select the correct filed DVA file.

15. Ignore the mismatch error message

16. View MLC in Beam’s Eye View option for appropriate shape and check beam properties for correct gantry angle, collimator angle and field size. Repeat steps 11 and 16 for all fields.

17. Beam’s Eye View Verification of Shape relative to CadPlan and all CIAOs with DVA imported. Beam’s Eye ViewCIAO’s with DVAs imported

18. Highlight the plan in the Navigation Window

19. Export the plan to the VoxelQ (File-Export-Dicom RT)

20. Select the Dicom RT to VQ export Filter

21. At VoxelQ, open the patient’s study and select (Tools-Verification)

22. Select (Tools-Connectivity)

23. “IMPORT” in the RTP Plans box.

24. Select the Patient /Plan

25. An isocenter must be established for the imported plan. An original VoxelQ plan with a traceable isocenter will allow you to properly position the imported plan. If the VQ plan selected in this option is the original isocenter, the imported plan will be placed at the original isocenter.

26. Select the treatment unit which matches the machine for the imported plan.

27. I believe this is for housekeeping on the mounted shared directory. We choose no. Although yes will work also.

28. Dicom import warning messages appear for structures and table positions. Ignore this.

29. This message appears, ignore it.

30. The imported plan appears in the Plan list. Click on done at the bottom of the Connectivity window.

31. In the Verification window the imported plan will have all variables in red and it is not editable. Click on the Current Plan Tab.

32. In the Plan Manager Box, Click on “DUP” (Duplicate)

33. There now is a copy of the imported plan labeled “your plan name-copy”

34. The copied plan is modifiable. You can now switch to Virtual Simulation and export the DRRs in the normal fashion