River Basin Planning and Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 Water Resources System Modeling.

Slides:



Advertisements
Similar presentations
GIS APPLICATIONS IN SELECTION OF SOLID WASTE DISPOSAL SITES
Advertisements

Green Water Credits Use of quantitative tools to evaluate potential Green Water Credits options Peter Droogers Wilco Terink Johannes Hunink Sjef Kauffman.
LOGO Bangkok, May 2009 Water Resources Management in Ba River Basin under Future Development and Climate Scenarios Presented by: Nguyen Thi Thu Ha Examination.
Optimum Allocation of Discharged Pollutant Loads from Nonpoint Sources in a Watershed using GIS Alok Kumar Laboratory of Water Resources Engineering Division.
AQUAREC Project Centre for Water Systems AQUAREC Project Centre for Water Systems D. Joksimovic.
Standa Vaněček The potential of Integrated Modelling and the OpenMI Standa Vaněček DHI, Chairman of the OATC.
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
Water Stewardship: More than a Vision on Sustainable Water Management Sabine von Wirén-Lehr CEFIC TF Meeting Brussels,
IWRM in EECCA countries Palle Lindgaard Jørgensen Technical Secretariat Helsinki, May 2007.
Engineering Hydrology (ECIV 4323)
Nathan VanRheenen Richard N. Palmer Civil and Environmental Engineering University of Washington Recasting the Future Developing.
Climate change impact on water resources Comoro islands are located in the Western Indian Ocean about 10 degrees south of the Equator and less than 300.
WATER ISSUES IN THE EASTERN EUROPE:
EU, SIXTH FRAMEWORK PROGRAMME Optimisation for Sustainable Water Management EU funded Project: OPTIMA INCO-MPC Partner: INTERGEO Environmental Technology.
Introduction to the Session 6 - Theme 4 – on “Water Resources Management and Governance”
Why are economic and financial instruments needed? A presentation made by Noma Neseni, IWSD.
IWRM as a Tool for Adaptation to Climate Change
Integrated Water Management Modeling Framework in Nebraska Association of Western State Engineers Spring Workshop Salt Lake City, Utah June 9, 2015 Mahesh.
Dr. R.P.Pandey Scientist F. NIH- Nodal Agency Misconception: A DSS takes decisions ---(No)
Public Participation and the Advisory Committee Process A Collaborative Partnership For Water Resources Toni M. Johnson, Chief Water Information Coordination.
The Planning Regions Legend (reduced): urban agglomeration rural area
Watershed Assessment and Planning. Review Watershed Hydrology Watershed Hydrology Watershed Characteristics and Processes Watershed Characteristics and.
ESET ALEMU WEST Consultants, Inc. Bellevue, Washington.
Water for America Initiative Eric J. Evenson Advisory Committee on Water Information February 20, 2008 U.S. Department of the Interior U.S. Geological.
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
TOPIC 3.2 ENSURING ADEQUATED WATER RESOURCES AND STORAGE INFRASTRUCTURE TO MEET AGRICULTURAL, ENERGY AND URBAN NEEDS.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
The hydrological cycle of the western United States is expected to be significantly affected by climate change (IPCC-AR4 report). Rising temperature and.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Engineering Hydrology (ECIV 4323)
Watersheds Human activities and structures, as depicted
Understanding hydrologic changes: application of the VIC model Vimal Mishra Assistant Professor Indian Institute of Technology (IIT), Gandhinagar
Dr. Richard Palmer Professor and Head Department of Civil and Environmental Engineering University of Massachusetts Amherst.
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
River Basin Management in Southern Africa Barbara Schreiner.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
Reservoir Operation Simulation D Nagesh Kumar, IISc Water Resources Planning and Management: M7L2 Simulation.
(i) System Components, Planning and Management Introduction and Basic Components D. Nagesh Kumar, IISc Water Resources Systems Planning and Management:
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
Design of meteorological data networks Dr. Anil Kumar Lohani National Institute of Hydrology, Roorkee India Hydro-Met Network Design Workshop, April 6-11,
Multi-objective Optimization
California Water Plan Update Advisory Committee Meeting January 20, 2005.
Group Work IWRM Integrated River Basin Management.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Introduction and River Basin Simulation D Nagesh Kumar, IISc Water Resources Planning and Management: M7L1 Simulation.
1 januari 2008 RIBASIM input data by Wil N.M. van der Krogt.
Linear Programming and Applications
D Nagesh Kumar, IIScOptimization Methods: M8L6 1 Advanced Topics in Optimization Applications in Civil Engineering.
Dr. Joerg Hartmann WWF Dams Initiative Leader Energy in a Water Constrained World.
Integrated Water Resources Management and the SEEAW Ivo Havinga United Nations Statistics Division on behalf of Manuel Dengo Division for Sustainable Development.
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
Conversion of river basin action plans into river basin management plans Conversion of river basin action plans into river basin management plans 9 th.
MODSIM A River Basin Management Decision Support System
Under 4.7 Habitat of the MTDS, Working Group 2 deals with:
Engineering Hydrology (ECIV 4323)
Modeling tools Training Module
Challenges in a Changing World
UNESCO-IHP Contribution to SDG 6 on Water and Sanitation
Concepts in Water Resources Management
Environmental modeling application domains
CLIMATE CHANGE IMPACTS ON THE WATER RESOURCES OF GHANA
Engineering Hydrology (ECIV 4323)
Ghana Water Management Country Status Factsheet
22nd WG D Meeting, 15/4/2012 Jacques Delsalle, European Commission
Planning process in river basin management
Engineering Hydrology (ECIV 4323)
Challenges in a Changing World
Optimization for Sustainable Water Resources
Presentation transcript:

River Basin Planning and Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 Water Resources System Modeling

Objectives D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 2  To discuss about the activities in river basin planning and management  To learn about integrated water resources management (IWRM)  To introduce various models for IWRM

Introduction D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 3 River basin: Geographical area demarcated by the topographic limits of the system of waters There are strong interactions between land and water resources, or between surface and ground water in the basin River basins are important elements in water resource development and planning It possesses fresh water and also shapes up the landscapes The upstream basin characteristic influences the availability of water for various purposes like irrigation, hydropower generation, recreation, navigation River basins are also the most productive ecosystems

River Basin Management (RBM) D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 4 It deals with the management of water resources in the basin Purpose of RBM: To ensure the use of water and other resources in the basin in a sustainable manner Most of the basins have multi-objectives and limited resources It is necessary to assign priorities to different needs Need for RBM arises from the non-coordinated usage or even overexploitation of resources RBM can be divided into six activities: Planning Construction Operation Monitoring Analysis and Decision making

River Basin Management… D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 5 Activities in RBM Basin and its users are directly affected by operation and management activities only Operation activity has a direct influence on the basin This includes regulation of facilities and application of economic, legal and policy instruments This is conducted through analysis and decision support systems (DSS) Management Monitoring Analysis Decisions Planning Construction Operation River basin and users

River Basin Management… D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 6 RBM may change the basin characteristics by the construction of storage or diversion structures; by implementing allocation rules, water rights and permits; by imposing taxes and subsidies to control water usage RBM may also contain a number of related activities like public participation, international participation or cooperation between related organizations. Most important structural regulation in RBM is the reservoir operation. A very sensitive operational issue in RBM is charging the users for water usage. This is an effective means to minimize wastage and also it will finance development activities in the basin. However, the charges should be low enough for the poor to afford.

River Basin Planning D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 7 Planning is an important and inevitable part in the utilization of water resources and in the operation of projects Helps to assess the present situation and achieve the desired situation by filling the gaps Offers a framework by setting priorities and also results in more public support Planning brings together managers of different river basins together Planning has four functions: (a) To assess the current situation, formulate and set goals and targets, orient the operation and management. (b) To provide framework for public participation and feedback (c) To increase legitimacy and mobilize public acceptance (d) To facilitate interaction among the concerned organizations and shareholders

River Basin Planning… D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 8 Important activities of planning of river basins are: (a) Identification of need, scope and geographical coverage area. (b) Analysis of institutional framework, identification of decisions, and the formulation of bodies. (c) Identification of stakeholders, their preferences and expectations (d) Preparation of blueprint of scopes, identify different phases and groups involved, prepare a flowchart of activities (e) Formulation of plans and its approval (f) Implementation of plan

River Basin Planning… D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 9 Types of plan for a particular river basin depend on different factors such as policy issues, location, available funds etc. These factors differ from country to country and basin to basin. RBM should also consider the interrelations within water systems (i.e., surface, and subsurface; quantity and quality), the interrelations between climate, land and water and also interrelations between complete river basins and their socio-economic environment. The planning depends on the number of functions to be performed. If the main goal is drinking water supply for an urban city, then there is no need to consider strategic planning which may require an overall description of the basin. If too many plans are to be executed simultaneously, then the availability of resources and also coordination can become a problem.

Integrated Water Resources Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 10 River basin can be divided into three components: Source components (rivers, reservoirs, aquifers and canals), Demand components (off-stream such as irrigation fields, industrial plants and cities and in- stream such as hydropower, recreation and environment) and Intermediate components (treatment plants, reuse and recycling facilities). According to the Technical Advisory Committee (TAC) Global partnership 2000 IWRM is a process which promotes the coordinated development and management of water, land and related resources, in order to maximize the resultant economic and social welfare in an equitable manner without compromising the sustainability of vital ecosystems. IWRM integrates three systems: natural, socio-economic and institutional. IWRM manages the conflict that may occur between the physical and social linkages of a water system.

Integrated Water Resources Management… D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 11 Along with managing various projects in a basin, IWRM also manages utilization of water for consumptive uses, non-consumptive uses and in-stream uses. Water use Consumptive use In-stream use Non -consumptive use Water quality control Water resources Water resources project Water use Water resources project Ultimate disposal Steps in water resources management

Models for IWRM D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 12 First Generation Models: Concentrated in hydraulic and hydrologic aspects such as flood routing, reservoir operation etc. Models for sediment transportation and water quality simulation were developed side by side. Streamflow Synthesis and Reservoir Regulation (SSARR) from USACE SIMLYD –II from Texas water development board HEC-5 model is also widely used to simulate operation of reservoir systems.

Models for IWRM… D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 13 Second generation models: Able to consider both hydrologic and water quality aspects These are able to perform interactive analysis and display of results Interactive River – Aquifer Simulation (IRAS) by Loucks et al. (1994) extensively uses graphics in system simulation European Hydrological System (SHE) is a distributed and physically modeled system and describes the major land flow processes of the hydrologic cycle MIKE SHE is a advanced version of SHE with add-ons for water quality, soil erosion, irrigation etc Water quality simulation models are a standard feature of river basin models Widely applied one is the Enhanced Stream Water Quality Model (QUAL2E) which simulates temperature, dissolved oxygen, biochemical oxygen demands etc. Another one is the Water Quality for River Reservoir Systems (WQRSS) by Hydrologic Engineering Center.

Models for IWRM… D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 14 Third generation models: Interactive models with graphical user interfaces, GIS inputs and screen display of results Tennessee river valley authority Environment and River resource Aid (TERRA): Reservoir and power generation management tool linked to a local area network for real time functioning River Basin Simulation Model (RIBASIM): Simulates river basins for various hydrological conditions Links hydrological inputs at various locations with specific water uses in the basin Evaluates alternatives of infrastructure, operational and demand management through a decision support system (explained in the previous module). MIKE BASIN: Represents rivers and tributaries as network with branches and nodes. Has a graphical interface which is linked to ArcView GIS Gives information on individual reservoir outputs and irrigation scheme with frequency and magnitude of water shortages.

MIKE SHE ( D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 15 An advanced integrated hydrological modeling system Simulates water flow in the entire land based phase of the hydrological cycle from rainfall to river flow, via various flow processes such as, overland flow, infiltration into soils, evapotranspiration from vegetation, and groundwater flow Hydrologic processes simulated by MIKE SHE

MIKE SHE D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 16 MIKE SHE is linked with ArcView GIS for pre- and post-processing of data. Main characteristics: (i) Integrated: Fully dynamic exchange of water between all major hydrological components is included, e.g. surface water, soil water and groundwater (ii) Physically based: Solves basic equations governing the major flow processes within the study area (iii) Fully distributed: The spatial and temporal variation of meteorological, hydrological, geological and hydrogeological data across the model area is described in gridded form for the input as well as the output from the model (iv) Modular: It has a modular structure, which allows user to focus only on the processes, which are important for the study.

MIKE SHE D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 17 MIKE SHE has been used for the analysis, planning and management of a wide range of water resources problems such as:  River basin management and planning  Water supply design, management and optimization  Irrigation and drainage  Soil and water management  Conjunctive use of groundwater and surface water  Groundwater management  Contamination from waste disposal  Floodplain studies  Impact of land use and climate change etc.

MIKE BASIN ( D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 18 Modeling tool for integrated river basin planning and management Developed by DHI in Denmark ( Addresses water allocation, conjunctive use, reservoir operation, and water quality issues. Couples ArcGIS with hydrologic modeling to provide basin-scale solutions Provides a mathematical representation of the river basin encompassing the main rivers and their tributaries, the hydrology of the basin in space and time, existing as well as potential major schemes and their various demands of water. River systems are represented by a network consisting of branches and nodes. Branches represent individual stream sections Nodes represent confluences, locations where certain water activities may occur, or important locations where model results are required.

MIKE BASIN D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 19 Gives emphasis is on both simulation and visualization in both space and time Typical areas of application include Water availability analysis Conjunctive surface and groundwater use Infrastructure planning Assessing irrigation potential and reservoir performance Estimating water supply capacity Determining waste water treatment requirements.

MIKE BASIN D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 20 Graphical User Interfaces (GUI) for different applications (Source: Representation of river network in a basin

MIKE BASIN D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 21 GUI’s for different applications (Source: Illustration of results – Flow at a node

MIKE BASIN D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 22 GUI’s for different applications (Source: (a) (c) (b) Delineation of catchment and river networks from digital elevation models (DEMs)

D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 Thank You