HIGH RADIATION TO MATERIALS 20 TH P ROJECT T EAM M EETING – O CTOBER 14, 2010 Project Team Meeting CERN, October 14, 2010  Beam requests - operation I.

Slides:



Advertisements
Similar presentations
RAL 27 April 2006The beta-beam task, EURISOL1 Status of the beta-beam study Mats Lindroos on behalf of the EURISOL beta-beam task.
Advertisements

CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Mercury System Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Hg-system Safety.
HIRADMAT IN THE WANF TUNNEL I. E FTHYMIOPOULOS, EN/MEF  HIRADMAT-Exp.Area Working Group  EN/MEF : I. Efthymiopoulos, A. Pardons, M.Lazzaroni, N. Gilbert.
CERN Machine Protection – A Future Safety System? Introduction 1 SMP = Safe Machine Parameters System which receives accelerator.
RAL/BENE meeting, April Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg.
CENF target facility civil engineering specifications – summary M. Calviani (EN/STI) for the CENF-SBWG team Neutrino Platform Meeting 30 th October 2014.
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
TS, Length of YETS EYETS LIU & CONS Project
1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
Eva Barbara Holzer MPP, CERN Eva Barbara Holzer 1 Approval procedure for master threshold changes.
HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
NuFact'06 WG3, Aug. 2006A. Fabich, CERNBeta-beam Ion Losses, 1 The EURISOL Beta-beam Acceleration Scenario: Ion Losses A. Fabich, CERN NuFact’06, UCIrvine.
HIGH RADIATION TO MATERIALS P ROJECT R EPORT IEFC Workshop, session 4 CERN, February 11, 2010 Outline  The HiRadMat facility – what is it?  Project overview.
6 April 2006Malika Meddahi 1 CNGS Project: primary beam 1.Project Overview 2. Proton beam line overview and status 3. Target status 4. Commissioning preparation.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
HIGH RADIATION TO MATERIALS: HIRADMAT STATUS HiRadMat Scientific Board, 23/4/2012 Outline  Location  Status  Beam line  Infrastructure  Exp. Area.
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
RaDIATE Admin Meeting October /09/14P. Hurh RaDIATE Oct 2014 Admin Meeting 1.
Education Thesis: Layout and design of a high accuracy magnetic field measurement system for superconducting undulators. Thesis: Phase error reduction.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
B. Todd et al. 19 th August 2009 The Beam Interlock System Thanks to: Machine Protection Panel, R. Schmidt, B. Puccio, M. Zerlauth and many more… 0v2.
LHC Section Meeting 1.eLogbook 2.LHC Controls Security Panel.
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
HIGH RADIATION TO MATERIALS Ans Pardons for the HiRadMat project team IEFC Workshop, March 22, 2011 Outline  The HiRadMat facility – Why, What, When,
DAMPE has successfully completed 3 weeks of test beam campaign – 2 weeks in the PS T9, 1 week in SPS H4 – ~60 people participated in the setup and data.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiRadMat Facility Outline  Location  Status  WANF dismantling  Beam line  Experimental area  Schedule  Project management S. Evrard – EN/MEF.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
WP5: – STATUS REPORT EUCARD Steering Committee Meeting INFN-Frascati, November 4-5, 2009 Outline  HiRadMat – overview/reminder  Project.
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
CNGS Review 15 July 2003 M. Meddahi1 EVM for CNGS Definitions Pre-requisites Application to CNGS.
Summary of IAP comments from 2007 EURISOL Town Meeting
Adrian Fabich HiRadMat Technical Board CERN, 15th Sep 2016
Overview of MSBA Building Process and Project Timeline
East Area Renovation Project Team meeting # 2 – EDMS News
HiRadmat requests A. Fabich MSWG, 30. January 2015.
Access to material testing facilities (WP10)
WP13: Access to Plasma Beam testing facilities
“hot spots” SIS100 internal beam dump Super-FRS production target
ILC RTML Meeting EDR Planning for Magnet Power Systems
M.Jonker CTC MPO-WG status
High Radiation to Materials HiRadMat Project : Construction, Installation & Operation of the facility Reminder : brief overview of the facility News.
Status of the beta-beam study
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
LHC injection W. Bartmann, M.J. Barnes, C. Bracco, F. Burkart, E. Carlier, B. Goddard, V. Kain, R. Steerenberg, L. Stoel, F. Velotti, C. Wiesner, C. Xu.
Overview Some useful presentations: Public overview – coffee meeting
nuSTORM and the Physics Beyond Colliders workshop
CNGS Proton Beam: Introduction
HiRadMat Test Facility
CNGS Project Overview Konrad Elsener.
Present and Future test facilities for High-intensity Targetry CERN
Machine Protection System Commissioning plans
Wednesday June 30,  40-S2-A01 (open session)
A High Intensity Neutrino Oscillation Facility in Europe
Joint session – Beta-beams
Summary for LPC (March 7th, Ralph Assmann)
East Hall under construction
Radiation Working Group RADWG
A. Fabich EuCARD-2 annual meeting 2017, Glasgow
Presentation transcript:

HIGH RADIATION TO MATERIALS 20 TH P ROJECT T EAM M EETING – O CTOBER 14, 2010 Project Team Meeting CERN, October 14, 2010  Beam requests - operation I. Efthymiopoulos – EN/MEF EDMS No:

I. Efthymiopoulos, October 14,2010  We received so far 11(+1) beam requests  HRM1: TISD – Target and Ion Source Development  HRM2: RADTOL – Radiation Tolerence Tests  HRM3: SLACRC1 – LARP Rotatable Collimator Robustness test  HRM4: BLM – Beam Loss Monitors development  HRM5: VDWBR – LHC Beam Dump Entrance Window Robustness  HRM6: TPSGRP – SPS TPSG dilluter robustness test  HRM7: TCDQRP – LHC TCDQ robustness and protection test  HRM8: TCDSRP – LHC TCDS robustness and protection test  HRM9: LHCCOLL – Qualification of LHC Phase-II collimators  HRM10:NTHIMBLE – Neutrino Target thimble experiment  HRM11:DYNVAC – Dynamic vacuum tests (ion and proton beams)  HRM12:SOLTAR – Solid Target for Neutrino Beams Beam Requests

I. Efthymiopoulos, October 14,2010  Mandate  Review the beam requests, classification of experiments, establish criteria for acceptance/rejection of experiments Scientific value, beam feasibility, safety concerns, impact to the facility,…  Establish priority list of experiments wrt available beam time  Distribute beam time and schedule of experiments  Distribute TNA funds  Report on utilization  Members I. Efthymiopoulos – chair M. Meddahi – beam expert S. Evrard – HiRadMat Engineer in charge Y. Kadi – advice on physics goals H. Vincke – radiation protection J. Wenninger – beam operations SPS R. Steerenberg – beam operations PS L. Bruno – BE RSO Operations – User Selection Panel

I. Efthymiopoulos, October 14,2010  Operations document in preparation  Should be submited to December RB for approval  Will be circulated soon…  Call first meeting of the User Selection Panel  Interview candidate experiments  Setup pulse list and optimization Operations

HiRadMat project Master schedule DR#1 (w13-14) DR#2 (w19-20) I. Efthymiopoulos, October 14,2010