SA2 : Network Resource Provision All Activity Meeting – 17 March 2004 - 1 SA2 Execution Plan for the first year Jean-Paul Gautier SA2 Manager CNRS/UREC.

Slides:



Advertisements
Similar presentations
LCSC October The EGEE project: building a grid infrastructure for Europe Bob Jones EGEE Technical Director 4 th Annual Workshop on Linux.
Advertisements

DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 DataGrid Quality Assurance On behalf.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE-III Program of Work Erwin Laure EGEE-II / EGEE-III Transition Meeting CERN,
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Pilot Test-bed Operations and Support Work.
EGEE is a project funded by the European Union under contract IST JRA4 Execution Plan and Brainstorming Javier Orellana JRA4 Coordinator EGEE.
EGEE (EU IST project) – Networking Activities 4: biomedical applications NA4 Biomedical Activities Johan Montagnat First EGEE Meeting Cork,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE II - Network Service Level Agreement (SLA) Establishment EGEE’07 Mary Grammatikou.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
INFSO-RI Enabling Grids for E-sciencE SA2 and JRA4: Network Services K. Kavoussanakis, EPCC, The University of Edinburgh J-P. Gautier,
Comparison of NREN Service Level Agreements Life Cycle and Portfolio Management Workshop Terena, 23/11/05 Ann Harding HEAnet Network Operations Manager.
The EGI Blueprint: Grid Operations and Security Migration to the next grid operations era Tiziana Ferrari (Istituto Nazionale di Fisica Nucleare)
INFSO-RI Enabling Grids for E-sciencE EGEE and Industry Bob Jones EGEE-II Project Director Final EGEE Review CERN, May 2006.
EGEE is a project funded by the European Union under contract INFSO-RI Summary M-E Bégin & B. Jones EGEE Technical Coordination All Activity Meeting,
INFSO-RI Enabling Grids for E-sciencE GRID sites connectivity database design Anthony Teslyuk, RRC KI JRA4, SA2 Meeting 4 th EGEE.
Bob Jones EGEE Technical Director EU DataGrid Project Conference - 30 September 2003 EGEE is proposed as a project funded by the European Union under contract.
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
This document produced by Members of the Helix Nebula Partners and Consortium is licensed under a Creative Commons Attribution 3.0 Unported License. Permissions.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
Fabrizio Gagliardi EGEE designated project director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
EGEE is a project funded by the European Union under contract IST Middleware Planning for LCG/EGEE Bob Jones EGEE Technical Director e-Science.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
EGEE is a project funded by the European Union under contract IST WBS/ Execution Plan Alistair Mills Grid Deployment Group
BalticGrid-II Project BalticGrid-II Kick-off meeting, May 2008, Vilnius SA2 - Network Provisioning Katrina Sataki, IMCS UL.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
EGEE is a project funded by the European Union under contract IST Network Resources Provision Jean-Paul Gautier SA2 manager Cork meeting,
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
Enabling Grids for E-sciencE EGEE-II Meeting EGEE-II SA2 activity Tziouvaras Chrysostomos, MSc NTUA, 14 th March 2006.
INFSO-RI Enabling Grids for E-sciencE Policy and International cooperation Fotis Karayannis, NA5 activity leader All Activity Meeting.
Guy Wormser IN2P3/CNRS, EGEE Applications Manager September 2003 EGEE is proposed as a project funded by the European Union under contract IST
INFSO-RI Enabling Grids for E-sciencE NRENs & Grids Workshop Relations between EGEE & NRENs Mathieu Goutelle (CNRS UREC) EGEE-SA2.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Deliverable DSA1.4 Jules Wolfrat ARM-9 –
EGEE is a project funded by the European Union under contract IST EGEE Summary NA2 Partners April
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
INFSO-RI Enabling Grids for E-sciencE Technical Overview Bob Jones, Technical Director, CERN EGEE 1 st EU Review 9-11/02/2005.
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
Fabrizio Gagliardi EGEE project director All activity workshop 17 th March 2004 EGEE is proposed as a project funded by the European Union under contract.
Javier Orellana JRA4 Coordinator Face to Face Partners Meeting University College London 11 December 2003 EGEE is proposed as a project funded by the European.
Connect communicate collaborate GÉANT - The GN3 Project Goals - Challenges - Vision Hans Döbbeling, DANTE TNC 2009, Malaga,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
INFSO-RI Enabling Grids for E-sciencE SA2 and JRA4: Network Services K. Kavoussanakis J-P. Gautier.
Bob Jones EGEE designated technical director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
EGEE is a project funded by the European Union under contract IST JRA4 Overview Javier Orellana JRA4 Coordinator EGEE Kick Off Meeting SA2.
Induction: What is EGEE? –April 26-28, EGEE organisation and procedures John Murison, EGEE Training Team EGEE is funded by the European Union.
All Activities Meeting – 13/14 Jan SA2 Execution Plan for the first year Franck Bonnassieux CNRS/UREC EGEE is proposed as a project funded by.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN Operational model: Roles and functions.
Javier Orellana JRA4 Coordinator All-Activity Meeting CERN 14 January 2004 EGEE is proposed as a project funded by the European Union under contract IST
Representation of European Grid efforts, international cooperation, and ESFRI EGI_DS WP3 consolidation workshop, CERN Fotis Karayannis, GRNET.
INFSO-RI Enabling Grids for E-sciencE Network Services Development Network Resource Provision 3 rd EGEE Conference, Athens, 20 th.
EGEE is a project funded by the European Union under contract IST Service Activity 1 M.Cristina Vistoli ROC Coordinator All activity meeting,
EGEE is a project funded by the European Union under contract IST Pete playing devils advocate JRA4-F2F Javier Orellana EGEE-JRA4.
EGEE is a project funded by the European Union under contract IST GN2 SA3 End to End Quality of Service Toby Rodwell DANTE First EGEE Conference,
EGEE is a project funded by the European Union under contract IST Network Activities Jean-Paul Gautier CNRS/UREC French Federation meeting.
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
Connect. Communicate. Collaborate Place your organisation logo in this area End-to-End Coordination Unit Marian Garcia, Operations Manager, DANTE LHC Meeting,
WP6 – Inter-operability with e-Infrastructures Sergio Andreozzi - WP6 Task Leader Strategy and Policy Manager, EGI.eu Helix Nebula - 1st Year Review 1.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operating an Optical Private Network: the.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Xavier Jeannin (CNRS/UREC) All Hands meeting.
INFSO-RI Enabling Grids for E-sciencE TNC 2005 Networking activities in EGEE Mathieu Goutelle (CNRS UREC, France) EGEE-SA2 activity.
Bob Jones EGEE Technical Director
Regional Operations Centres Core infrastructure Centres
Status of SA2 Network Resource Provision Jean-Paul Gautier CNRS/UREC
JRA3 Introduction Åke Edlund EGEE Security Head
SA1 Execution Plan Status and Issues
Ian Bird GDB Meeting CERN 9 September 2003
SLR, SLS and SLA issues Afrodite Sevasti SA2 participant
Bob Jones EGEE Technical Director
Networking support (SA2) tasks for EGI
GN2 (and its support for GRIDs)
JRA2 Quality Assurance Geneviève Romier CNRS-UREC
Presentation transcript:

SA2 : Network Resource Provision All Activity Meeting – 17 March SA2 Execution Plan for the first year Jean-Paul Gautier SA2 Manager CNRS/UREC EGEE is proposed as a project funded by the European Union under contract IST

SA2 : Network Resource Provision All Activity Meeting – 17 March Outline Objectives and approach Organisation SA2 Milestones/Delivrable SA2 Work Breakdown Structure Initial risks assessment Issues related to other activities Next steps to take between now and Cork

SA2 : Network Resource Provision All Activity Meeting – 17 March Objectives Ensures EGEE access to network services provided by GEANT and the NRENs to link users, resources and operational management. Do this by managing the relationship between EGEE and GEANT Tasks Collection of requirements Specification of services technically operationally Definition of network access policies Monitoring of service level provision GEANT High-speed pan-European backbone linking NRENs run by DANTE NRENs National Research and Educational Networks DANTE Not-for-profit company that manages GEANT

SA2 : Network Resource Provision All Activity Meeting – 17 March Approach Definition of network services through standard modelling process: Filling of SLRs (Service Level Request) by end users and applications. Definition of SLSs (Service Level Specification) by SA2, to be implemented by GEANT and the NRENs, in conjunction with JRA4 activity. Signature of SLAs (Service Level Agreement) between applications, SA2 and DANTE/NRENs. Network Operation Centre (NOC) operational procedure study on GEANT and selected NRENS and incremental integration with EGEE Grid Operation Centres (GOCs). Outside the scope of EGEE to provide connections for any user or resource site Sites must have adequate bandwidth & performance to join the production grid facility. Go beyond existing best effort IP service to meet the needs of a production level grid network.

SA2 : Network Resource Provision All Activity Meeting – 17 March Management Structure and partners UREC will manage SA2, oversee both SA2 and JRA4 activities, and will be responsible for DANTE and the NRENs liaison ParticipantDescription of Role FTE (EU funded + unfunded) CNRS Network Co-ordinator overseeing both service (SA2) and research activities (JRA4); responsible for DANTE and the NRENs liaison. Network resource provision requirements SLR/SLS/SLA definitions Operational model 2 (1+1) RCC KI Network resource provision requirements SLR/SLS/SLA definitions Operational interface between RDIG, Russian network providers and EGEE. 2 (1+1) GRNET Network resource provision requirements SLR/SLS/SLA definitions 0,25 (0+0,25) Total (FTEs) 4,25 (2+2,25)

SA2 : Network Resource Provision All Activity Meeting – 17 March Groups involved and key individuals Collaborator namePartnerFunctionFTEF or UFTotal PM Jean-Paul GautierCNRSSA2 Manager1UF12 XCNRS 1F12 Afrodite SevastiGrnet 0,25UF3 Sergei TeryaevRRC KI 1UF12 XRRC KI 1F12 Total effort 4,25 51 Total from the TA 4,25 51

SA2 : Network Resource Provision All Activity Meeting – 17 March Milestones and deliverables Project Month Deliverable or Milestone Item M3Milestone MSA2.1 First meeting of EGEE-GEANT/NRENS Liaison Board M6Deliverable DSA2.1 Survey of pilot application requirements on networks, initial SLRs and service classes. M9Milestone MSA2.2 Initial requirements aggregation model, specification of services as SLSs on the networks, M12Milestone MSA2.3 Operational interface between EGEE and GEANT/NRENs. M12Deliverable DSA2.2 Institution of SLAs and appropriate policies. M24Deliverable DSA2.3 Revised SLAs and policies.

SA2 : Network Resource Provision All Activity Meeting – 17 March Product breakdown structure EGEE SA1 SA2 GOC/NOC interactions Network Provisioning SLAs

SA2 : Network Resource Provision All Activity Meeting – 17 March WBS 1/3 – Product Tasks TaskTask TitleSEEffort Explanation TSA2.1Provide MSA2.1 milestone131,00 MSA2.1: First meeting of EGEE- GEANT/NRENS Liaison Board TSA2.2.1Organisation120,70 TSA2.2.2Meeting330,30 TSA2.2Provide DSA2.1 deliverable1611,00 DSA2.1: Survey of pilot application requirements on networks, initial SLRs and service classes. TSA2.2.1SLR definition122,00 TSA2.2.2 Gathering of Application requirements (NA4 using SLR) 255,00 TSA2.2.3Definiton of service classes351,50 TSA2.2.4Loopback with JRA4451,50 TSA2.2.5Write/review deliverable561,00 TSA2.3Provide MSA2.2 milestone395,50 MSA2.2: Initial requirements aggregation model, specification of services as SLSs on the network. TSA2.3.1Aggregation modeling341,50 TSA2.3.2SLS definition482,00 TSA2.3.3Loopback with JRA4681,50 TSA2.3.4Validation with GEANT/NRENs890,50

SA2 : Network Resource Provision All Activity Meeting – 17 March WBS 2/3 - Product Tasks TaskTask TitleSEEffort Explanation TSA2.4Provide MSA2.3 milestone31211,00 MSA2.3: Operational interface between EGEE and GEANT/NRENs. TSA2.4.1NOC operations survey351,50 TSA2.4.2TT Systems study (GOC & NOC)451,00 TSA2.4.3Develop interfaces682,00 TSA2.4.4setup operational interface7125,50 TSA2.4.5Write/review procedures11121,00 TSA2.5Provide DSA2.4 deliverable61212,00 DSA2.4: Institution of SLAs and appropriate policies. TSA2.5.1SLA / Policies definition6105,00 TSA2.5.2Loopback with JRA48103,00 TSA2.5.3 Formalization by contract between partners (VO / GEANT / NRENS) 10123,00 TSA2.5.4Write/review deliverable11121,00

SA2 : Network Resource Provision All Activity Meeting – 17 March WBS 3/3 - Recurrent Tasks Task Task Title SEEffortExplanation TSA2.6Network Services follow-up1123,50 Gathering of network indicator, checking of SLA adherence TSA2.6.1Network provision follow-up1121,50 TSA2.6.2SLA aderence follow-up10120,50 TSA2.6.3Interaction GOC/NOC follow-up6121,50 TSA2.7Management of Liaison with other EU project 1120,85 6net … TSA2.8Management of Liaison with DANTE 1121,00 MoU with GN2 TSA2.9JRA4 Follow-up1121,50 Coaching TSA2.10Taking part in JRA21120,15 TSA2.11Review the deliverables from other activities 1121,00 TSA2.12SA2 Management1122,50 (5% of Total)

SA2 : Network Resource Provision All Activity Meeting – 17 March Risk analysis Risk titleClassLevelDescription HiringM2Difficulties to hire people (latency + adequate profile) GlueM3Activity resources dispersion RequirementsT1Gathering of adequate application network requirements SLAP3Harmonisation of Network SLA: Network SLA for grid is not Network SLA for NREN Trouble ticketS2Harmonisation of trouble ticketing systems TechnoT2 Failure to receive from the underlying network infrastructure (GEANT, NRENs, campus/last-mile parts of the end-to-end path) the services needed as technically and operationally specified in SA2

SA2 : Network Resource Provision All Activity Meeting – 17 March Relations with NAx NA1: Management NA2: Dissemination and Outreach NA3: User Training and Education NA4: Application Identification and Support Collection of application network requirements Definition of SLS (Service Level Specifications) Definition of SLAs (Service Level Agreement) Follow-up of SLA adherence NA5: Policy and International Cooperation

SA2 : Network Resource Provision All Activity Meeting – 17 March Relations with SA1 Define interactions and operational model between GOCs and NOCs ( Procedures, Trouble Ticketing, Escalations, SLAs…) GEANT NOC EGEE Management NRENs NOC NRENs NOC NRENs NOC DANTENREN

SA2 : Network Resource Provision All Activity Meeting – 17 March Highest priority steps Hiring people : UREC and RCC KI. Finalize the WBS to have a resource planning. Organize liaison board with DANTE/NRENS Write a document describing the functions of the Liaison Board with more detail than the one offered in the TA. Synchronize work and deliverable with GN2. Start dialog with others activities, mainly NA4.